Permit #2023080250
Permit Details
Status: FINAL
| Parcel Id: 09-12-31-0000-02030-0020 |
| Block: 02030 |
| Subdivision: - |
| Job Phone: 678-697-0613 |
| Location Address: 1 MEMORIAL MEDICAL PKWY |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 09/11/2023 |
| NOC: Unknown |
| Applicant name: BRUCE ROBERT ADAMS |
| Owner: MEMORIAL HOSPITAL-FLAGLER INC |
|
Address 60 MEMORIAL MEDICAL PKWY PALM COAST, FL 32164 |
| Lot: 0020 |
| Job Description: SITE WORK: ADVENT CANCER CENTER |
| Type: CN |
Contractor
THE ROBINS & MORTON GROUP
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
423 S KELLER RD ORLANDO, FL 32810 |
#200 ORLANDO, FL 32810 |
CGC1523017 (Exp: 08/31/2026) | 407-916-7235 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 11/06/2024 | APPROVED | DRAMIREZ |
| CLOSE OUT DOCUMENTS | 11/06/2024 | APPROVED | DRAMIREZ |
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 11/06/2024 | APPROVED | DRAMIREZ |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 11/05/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/5/2024 4:29:29 PM *** ADAmats now installed at landings each side of roadway,newcross walk stiping connecting existing sidewalk to new with old stiping blacken out 9/27/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/27/2024 3:04:29 PM *** there is no landing at entrance cross walk at entrance side(curb and grass) and landing on other side connecting to existing sidewalk needs to be constructed per latest FDOT Standards/truncated mats need plastic protective wrapping removed at various locations with in the site/bike racks not yet installed/EV stations not yet installed | |||
| U-ROW FINAL | 11/04/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 10/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/31/2024 11:05:34 AM *** any work in the ROW that was proposed on approved design plans nees to be constructed and as such ,this inspection is tied into the traffic inspection that is also partially approved due to some sidewalk landings not yet constructed as discussd with Brian yesterday | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/04/2024 | APPROVED | FWILLIS |
| Note: 10/31/2024 - PREVIOUS INSPECTION NOTES Getting information on crosswalk that leads to main road. Truncated Domes and designated crosswalk area. | |||
| BLD- ADA PARKING | 10/31/2024 | APPROVED | FWILLIS |
| BLD- ADA SIGNAGECONTROL | 10/31/2024 | APPROVED | FWILLIS |
| BLD- ADA VEHICULAR WAY | 10/31/2024 | APPROVED | FWILLIS |
| BLD - ADA SIGNAGE- INFOR/DIRECT | 10/31/2024 | APPROVED | FWILLIS |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 10/31/2024 | Disapproved - NO FEE | FWILLIS |
| Note: Getting information on crosswalk that leads to main road. Truncated Domes and designated crosswalk area. | |||
| IRRIGATION AFFIDAVIT | 10/31/2024 | APPROVED | RPICATAGI |
| LDSC-IRRIGATION FINAL | 10/31/2024 | APPROVED | RPICATAGI |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 10/31/2024 | APPROVED | RPICATAGI |
| Note: 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 7:38:13 AM *** incorrectly scheduled | |||
| UROW - FINAL DRAINAGE | 10/31/2024 | FINAL APPROVED | LFITZGERALD |
| U-ROW FINAL | 10/31/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/31/2024 11:05:34 AM *** any work in the ROW that was proposed on approved design plans nees to be constructed and as such ,this inspection is tied into the traffic inspection that is also partially approved due to some sidewalk landings not yet constructed as discussd with Brian yesterday | |||
| U - UTILITY COMMERCIAL FINAL | 10/31/2024 | FINAL APPROVED | LFITZGERALD |
| UC-FINAL SITE INSPECTION | 10/28/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 9/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:16:09 PM *** this done when field/office issues have all been resolved-accepted | |||
| LDSC- LANDSCAPE FINAL | 10/17/2024 | APPROVED | RPICATAGI |
| Note: Installed trees and shrubs have been wind-blow nand are not plumb. Contractor to re-set affected plants plumb | |||
| LDSC-PRE-PLANTING TREE QUALITY | 10/17/2024 | APPROVED | RPICATAGI |
| Note: 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 1:39:34 PM *** first round of trees stisfactory | |||
| U-WATER SERVICE INSTALLATION | 09/27/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:43:00 AM *** water to building verified today | |||
| U-CROSS CONNECTION | 09/27/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:44:18 AM *** 4in tandom backflow-potable water supply/well irrigation=no cross connection | |||
| U-WATER METER INSTALLATION/VERIFICATION | 09/27/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:44:58 AM *** verfied by utility rep.-Mike | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 09/27/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 3:04:29 PM *** there is no landing at entrance cross walk at entrance side(curb and grass) and landing on other side connecting to existing sidewalk needs to be constructed per latest FDOT Standards/truncated mats need plastic protective wrapping removed at various locations with in the site/bike racks not yet installed/EV stations not yet installed | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 09/25/2024 | APPROVED | LFITZGERALD |
| Note: 10/20/2023 - PREVIOUS INSPECTION NOTES | |||
| UC-SUBSTANTIAL WALK-THRU | 09/25/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:28:18 PM *** also need to check that all fire hydrant valves are open and accessible,tapping valve .sewer FM valve *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:15:22 PM *** chuck-Cline rep. at walk thru-only 1-2 items to correct,chuck-mat made aware | |||
| UC- PRELIMINARY AS-BUILTS | 09/25/2024 | APPROVED | LFITZGERALD |
| UC-FINAL SITE INSPECTION | 09/25/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:16:09 PM *** this done when field/office issues have all been resolved-accepted | |||
| UC-CONSTRUCTION ENTRANCE | 09/25/2024 | APPROVED | LFITZGERALD |
| Note: 10/20/2023 - PREVIOUS INSPECTION NOTES cattle gates being used in place of standard rock-ok-informed Jay and Casey fine with as long as soils stay on site and if gets on roadway then brooming etc. will be required | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 09/25/2024 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9140 *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:28:18 PM *** also need to check that all fire hydrant valves are open and accessible,tapping valve .sewer FM valve *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:15:22 PM *** chuck-Cline rep. at walk thru-only 1-2 items to correct,chuck-mat made aware 4/1/2024 - PREVIOUS INSPECTION NOTES 2in tap/gate valve /poly pipe installed-POC made at 2nd existing valve(wooded area) | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 09/25/2024 | APPROVED | LFITZGERALD |
| Note: 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 11:20:37 AM *** Tyler-Tecktronics-Flow tested all hydrants-Randy Homes on site Inspector Notes from Inspection 9070 *** NOTES ADDED BY LFITZGERALD 7/24/2024 12:04:48 PM *** Riley reps,cline,javier present-all satisfactory with report forth coming from cline Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 07/26/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/26/2024 11:20:37 AM *** Tyler-Tecktronics-Flow tested all hydrants-Randy Homes on site Inspector Notes from Inspection 9070 *** NOTES ADDED BY LFITZGERALD 7/24/2024 12:04:48 PM *** Riley reps,cline,javier present-all satisfactory with report forth coming from cline Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| U-PUMP STATION START-UP | 07/24/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/24/2024 12:04:48 PM *** Riley reps,cline,javier present-all satisfactory with report forth coming from cline Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| UC-ASPHALT PRE PLACEMENT | 06/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 06/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:28:12 PM *** remaining sidewalks now completed Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier 5/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:47:56 AM *** sidewalks around building now being installed-NE started/completed-moving around building sutward to westward | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 06/18/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 7:38:13 AM *** incorrectly scheduled | |||
| LDSC-PRE-PLANTING TREE QUALITY | 06/18/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 1:39:34 PM *** first round of trees stisfactory | |||
| LANDSCAPE PRE-CONSTRUCTION MEETING | 05/28/2024 | APPROVED | RPICATAGI |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 05/23/2024 | APPROVED | RMARTIN |
| Note: 3/1/2024 - PREVIOUS INSPECTION NOTES front conduits out of footers | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 05/23/2024 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 05/23/2024 | APPROVED | RMARTIN |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 05/22/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:47:56 AM *** sidewalks around building now being installed-NE started/completed-moving around building sutward to westward | |||
| UROW- CURBING & GUTTER | 05/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side | |||
| POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING | 05/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| FIRE HYDRANT LOCATION AND FLOW TEST | 05/15/2024 | CANCELLED BY INSPECTOR | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:01:35 AM *** n/a 3/19/2024 - PREVIOUS INSPECTION NOTES please use inspections for fire on fire permit | |||
| UROW- CURBING & GUTTER | 05/15/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 10:32:39 AM *** NOTE-THIS INSPECTION NOT SCHEDULED AT TIME OF INSTALLS-OBSERVED AND SCHEDULED BY ME WHEN SEN IT WAS DONE *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 05/15/2024 | APPROVED | LFITZGERALD |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 05/15/2024 | CANCELLED BY INSPECTOR | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:02:45 AM *** n/a | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 05/15/2024 | CANCELLED BY INSPECTOR | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:02:17 AM *** n/a | |||
| POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING | 04/16/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING | 04/15/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier | |||
| WATERMAIN FLUSH & PRESSURE TESTED | 04/12/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg | |||
| U-WATER MAIN DISINFECTION | 04/12/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 04/12/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9700 wire tone now completed(Gemstone-tony) 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/28/2024 - PREVIOUS INSPECTION NOTES bore plus now pressure tested 3/26/2024 - PREVIOUS INSPECTION NOTES 4in potabe pressure tested from backlow assembly(no bore pipe)to building connection 3/14/2024 - PREVIOUS INSPECTION NOTES Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| U-SEWER FORCE MAIN INSTALL/TESTING | 04/01/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 2in tap/gate valve /poly pipe installed-POC made at 2nd existing valve(wooded area) | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/28/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: bore plus now pressure tested 3/26/2024 - PREVIOUS INSPECTION NOTES 4in potabe pressure tested from backlow assembly(no bore pipe)to building connection 3/14/2024 - PREVIOUS INSPECTION NOTES Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING | 03/28/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: wrong inspection scheduled-spoke with Javier | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/26/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4in potabe pressure tested from backlow assembly(no bore pipe)to building connection 3/14/2024 - PREVIOUS INSPECTION NOTES Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| WATERMAIN FLUSH & PRESSURE TESTED | 03/22/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg | |||
| U - SEWER TIE IN | 03/19/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: sewer now connected from C/O under canopy ,over storm, to building | |||
| FIRE HYDRANT LOCATION AND FLOW TEST | 03/19/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: please use inspections for fire on fire permit | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/14/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/12/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/08/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 03/07/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| U-GRAVITY SEWER INSTALL/TESTING | 03/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| UC-DRAINAGE STRUCT PLACMNT | 03/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: ALL drinage structures now installed 2/14/2024 - PREVIOUS INSPECTION NOTES no structures-just roof drain laterals/tie in 2/9/2024 - PREVIOUS INSPECTION NOTES cb7 NOW INSTALLED 2/8/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 03/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: all drainage pipe(roof/mainline) completed 2/29/2024 - PREVIOUS INSPECTION NOTES roof drains west side building/canopy 2/14/2024 - PREVIOUS INSPECTION NOTES installing roof drain laterals to /including tie in to ADS storm pipe 2/9/2024 - PREVIOUS INSPECTION NOTES ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 03/01/2024 | PARTIALLY APPROVED | RMARTIN |
| Note: front conduits out of footers | |||
| U-GRAVITY SEWER INSTALL/TESTING | 02/29/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/29/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: roof drains west side building/canopy 2/14/2024 - PREVIOUS INSPECTION NOTES installing roof drain laterals to /including tie in to ADS storm pipe 2/9/2024 - PREVIOUS INSPECTION NOTES ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 02/23/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: connection to bore pipe with reducer=6in fire line with T with 4in stub for propsed potable/fire BF set with continuing fire install next week-NOTE this inspection not sheduled but because i have good communication with Jodh-pipe foreman- i was aware of this activity and handled inspection of and resulted 12/11/2023 - PREVIOUS INSPECTION NOTES Mandrel pulled thru bore pipe/reverse tap now coneected/flush now done on piecies/bore 11/6/2023 - PREVIOUS INSPECTION NOTES 10in HDPE bore pipe installed-still need to fuse on MJ adapter at backflow tie-in and wet tap etc,, | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/14/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: no structures-just roof drain laterals/tie in 2/9/2024 - PREVIOUS INSPECTION NOTES cb7 NOW INSTALLED 2/8/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/14/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: installing roof drain laterals to /including tie in to ADS storm pipe 2/9/2024 - PREVIOUS INSPECTION NOTES ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/09/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/09/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: cb7 NOW INSTALLED 2/8/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/08/2024 | CANCELLED BY APPLICANT | JHARDING |
| Note: 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/08/2024 | CANCELLED BY APPLICANT | JHARDING |
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/06/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 2-5 pipe from CB1 TO CB5 placed and backfilled2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24 pipe set/installed from cb3 to cb8 and backfilled-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24 pipe now installed from cb2 to cb3-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2 | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/06/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE STRUCT PLACMNT | 02/01/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 02/01/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 1-31-24 pipe set/installed from cb3 to cb8 and backfilled-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24 pipe now installed from cb2 to cb3-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2 | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 01/30/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 1-29-24 pipe now installed from cb2 to cb3-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2 | |||
| UC-DRAINAGE STRUCT PLACMNT | 01/30/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE STRUCT PLACMNT | 01/26/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 01/26/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2 | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 01/24/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: pipe now installed from pond MES to CB2 | |||
| UC-DRAINAGE STRUCT PLACMNT | 01/24/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection) | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 12/11/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Mandrel pulled thru bore pipe/reverse tap now coneected/flush now done on piecies/bore 11/6/2023 - PREVIOUS INSPECTION NOTES 10in HDPE bore pipe installed-still need to fuse on MJ adapter at backflow tie-in and wet tap etc,, | |||
| U-GRAVITY SEWER INSTALL/TESTING | 11/29/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate | |||
| U-PUMP STATION PRE-INSTALLATION | 11/20/2023 | APPROVED | DHANEY |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 11/06/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: 10in HDPE bore pipe installed-still need to fuse on MJ adapter at backflow tie-in and wet tap etc,, | |||
| UC-CONSTRUCTION ENTRANCE | 10/20/2023 | PARTIALLY APPROVED | LFITZGERALD |
| Note: cattle gates being used in place of standard rock-ok-informed Jay and Casey fine with as long as soils stay on site and if gets on roadway then brooming etc. will be required | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 10/20/2023 | PARTIALLY APPROVED | LFITZGERALD |
| PLAN - PRE-CON 386-986-3750 | 09/21/2023 | APPROVED | LFITZGERALD |
| Note: only Rob Martin and Larry Fitzgerald attended from the city,Casey,Joe and another rep. attended from Robbins, Cline a no show |
Review History
| Department | Status | Date In | Date Out |
| BLD | CANCEL | 10/31/2024 | 11/01/2024 |
| PLLA | CANCEL | 10/31/2024 | 11/04/2024 |
| BLD | CANCEL | 05/15/2024 | 05/15/2024 |
| ELEC | CANCEL | 05/15/2024 | 05/15/2024 |
| PLENG | CANCEL | 05/15/2024 | 05/15/2024 |
| PLLA | CANCEL | 05/15/2024 | 05/15/2024 |
| UD1 | CANCEL | 05/15/2024 | 05/15/2024 |
| BADMIN | REJECT | 05/15/2024 | 05/15/2024 |
| Note: Rejected By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM All Development Order modifications must be submitted via a Site Plan Modification and not through the Site permit. | |||
| BLD | COMPLETE | 08/03/2023 | 08/04/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/03/2023 | 08/04/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 08/03/2023 | 08/04/2023 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | COMPLETE | 08/03/2023 | 08/04/2023 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 08/03/2023 | 08/07/2023 |
| Note: Released By: BRICE WRIGHT - (386)986-2398 - BWRIGHT@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤222.50) | 09/11/2023 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 09/11/2023 |
| SITE INSPECTION | ¤1,040.00 | 09/11/2023 |
| SITE PLAN 30 | ¤30.00 | 09/11/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤972.50 |