Permit #2023080250

Permit Details

Status: FINAL

Parcel Id: 09-12-31-0000-02030-0020
Block: 02030
Subdivision: -
Job Phone: 678-697-0613
Location Address: 1 MEMORIAL MEDICAL PKWY
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 09/11/2023
NOC: Unknown
Applicant name: BRUCE ROBERT ADAMS
Owner: MEMORIAL HOSPITAL-FLAGLER INC

Address

60 MEMORIAL MEDICAL PKWY

PALM COAST, FL 32164

Lot: 0020
Job Description: SITE WORK: ADVENT CANCER CENTER
Type: CN

Contractor

THE ROBINS & MORTON GROUP
Status Location Address Mailing Address State License Number Phone
ACTIVE

423 S KELLER RD

ORLANDO, FL 32810

#200

ORLANDO, FL 32810

CGC1523017 (Exp: 08/31/2026) 407-916-7235

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 11/06/2024 APPROVED DRAMIREZ
CLOSE OUT DOCUMENTS 11/06/2024 APPROVED DRAMIREZ
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 11/06/2024 APPROVED DRAMIREZ
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 11/05/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/5/2024 4:29:29 PM *** ADAmats now installed at landings each side of roadway,newcross walk stiping connecting existing sidewalk to new with old stiping blacken out 9/27/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/27/2024 3:04:29 PM *** there is no landing at entrance cross walk at entrance side(curb and grass) and landing on other side connecting to existing sidewalk needs to be constructed per latest FDOT Standards/truncated mats need plastic protective wrapping removed at various locations with in the site/bike racks not yet installed/EV stations not yet installed
U-ROW FINAL 11/04/2024 FINAL APPROVED LFITZGERALD
Note: 10/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/31/2024 11:05:34 AM *** any work in the ROW that was proposed on approved design plans nees to be constructed and as such ,this inspection is tied into the traffic inspection that is also partially approved due to some sidewalk landings not yet constructed as discussd with Brian yesterday
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 11/04/2024 APPROVED FWILLIS
Note: 10/31/2024 - PREVIOUS INSPECTION NOTES Getting information on crosswalk that leads to main road. Truncated Domes and designated crosswalk area.
BLD- ADA PARKING 10/31/2024 APPROVED FWILLIS
BLD- ADA SIGNAGECONTROL 10/31/2024 APPROVED FWILLIS
BLD- ADA VEHICULAR WAY 10/31/2024 APPROVED FWILLIS
BLD - ADA SIGNAGE- INFOR/DIRECT 10/31/2024 APPROVED FWILLIS
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/31/2024 Disapproved - NO FEE FWILLIS
Note: Getting information on crosswalk that leads to main road. Truncated Domes and designated crosswalk area.
IRRIGATION AFFIDAVIT 10/31/2024 APPROVED RPICATAGI
LDSC-IRRIGATION FINAL 10/31/2024 APPROVED RPICATAGI
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 10/31/2024 APPROVED RPICATAGI
Note: 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 7:38:13 AM *** incorrectly scheduled
UROW - FINAL DRAINAGE 10/31/2024 FINAL APPROVED LFITZGERALD
U-ROW FINAL 10/31/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/31/2024 11:05:34 AM *** any work in the ROW that was proposed on approved design plans nees to be constructed and as such ,this inspection is tied into the traffic inspection that is also partially approved due to some sidewalk landings not yet constructed as discussd with Brian yesterday
U - UTILITY COMMERCIAL FINAL 10/31/2024 FINAL APPROVED LFITZGERALD
UC-FINAL SITE INSPECTION 10/28/2024 FINAL APPROVED LFITZGERALD
Note: 9/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:16:09 PM *** this done when field/office issues have all been resolved-accepted
LDSC- LANDSCAPE FINAL 10/17/2024 APPROVED RPICATAGI
Note: Installed trees and shrubs have been wind-blow nand are not plumb. Contractor to re-set affected plants plumb
LDSC-PRE-PLANTING TREE QUALITY 10/17/2024 APPROVED RPICATAGI
Note: 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 1:39:34 PM *** first round of trees stisfactory
U-WATER SERVICE INSTALLATION 09/27/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:43:00 AM *** water to building verified today
U-CROSS CONNECTION 09/27/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:44:18 AM *** 4in tandom backflow-potable water supply/well irrigation=no cross connection
U-WATER METER INSTALLATION/VERIFICATION 09/27/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:44:58 AM *** verfied by utility rep.-Mike
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 09/27/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 3:04:29 PM *** there is no landing at entrance cross walk at entrance side(curb and grass) and landing on other side connecting to existing sidewalk needs to be constructed per latest FDOT Standards/truncated mats need plastic protective wrapping removed at various locations with in the site/bike racks not yet installed/EV stations not yet installed
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 09/25/2024 APPROVED LFITZGERALD
Note: 10/20/2023 - PREVIOUS INSPECTION NOTES
UC-SUBSTANTIAL WALK-THRU 09/25/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:28:18 PM *** also need to check that all fire hydrant valves are open and accessible,tapping valve .sewer FM valve *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:15:22 PM *** chuck-Cline rep. at walk thru-only 1-2 items to correct,chuck-mat made aware
UC- PRELIMINARY AS-BUILTS 09/25/2024 APPROVED LFITZGERALD
UC-FINAL SITE INSPECTION 09/25/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:16:09 PM *** this done when field/office issues have all been resolved-accepted
UC-CONSTRUCTION ENTRANCE 09/25/2024 APPROVED LFITZGERALD
Note: 10/20/2023 - PREVIOUS INSPECTION NOTES cattle gates being used in place of standard rock-ok-informed Jay and Casey fine with as long as soils stay on site and if gets on roadway then brooming etc. will be required
U-SEWER FORCE MAIN INSTALL/TESTING 09/25/2024 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9140 *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:28:18 PM *** also need to check that all fire hydrant valves are open and accessible,tapping valve .sewer FM valve *** NOTES ADDED BY LFITZGERALD 9/25/2024 12:15:22 PM *** chuck-Cline rep. at walk thru-only 1-2 items to correct,chuck-mat made aware 4/1/2024 - PREVIOUS INSPECTION NOTES 2in tap/gate valve /poly pipe installed-POC made at 2nd existing valve(wooded area)
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/25/2024 APPROVED LFITZGERALD
Note: 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 11:20:37 AM *** Tyler-Tecktronics-Flow tested all hydrants-Randy Homes on site Inspector Notes from Inspection 9070 *** NOTES ADDED BY LFITZGERALD 7/24/2024 12:04:48 PM *** Riley reps,cline,javier present-all satisfactory with report forth coming from cline Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/26/2024 11:20:37 AM *** Tyler-Tecktronics-Flow tested all hydrants-Randy Homes on site Inspector Notes from Inspection 9070 *** NOTES ADDED BY LFITZGERALD 7/24/2024 12:04:48 PM *** Riley reps,cline,javier present-all satisfactory with report forth coming from cline Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
U-PUMP STATION START-UP 07/24/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/24/2024 12:04:48 PM *** Riley reps,cline,javier present-all satisfactory with report forth coming from cline Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
UC-ASPHALT PRE PLACEMENT 06/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:50:12 PM *** ok s long as passing LBR/Compaction reports to be forwarded to me prior to this scheduled inspection Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 06/20/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/20/2024 2:28:12 PM *** remaining sidewalks now completed Inspector Notes from Inspection 9708 *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier 5/22/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:47:56 AM *** sidewalks around building now being installed-NE started/completed-moving around building sutward to westward
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 06/18/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 7:38:13 AM *** incorrectly scheduled
LDSC-PRE-PLANTING TREE QUALITY 06/18/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 1:39:34 PM *** first round of trees stisfactory
LANDSCAPE PRE-CONSTRUCTION MEETING 05/28/2024 APPROVED RPICATAGI
BLD - UNDERGROUND SITE LIGHTING CONDUITS 05/23/2024 APPROVED RMARTIN
Note: 3/1/2024 - PREVIOUS INSPECTION NOTES front conduits out of footers
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 05/23/2024 APPROVED RMARTIN
BLD - SITE LIGHTING-POLE SET/FIXTURE 05/23/2024 APPROVED RMARTIN
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 05/22/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:47:56 AM *** sidewalks around building now being installed-NE started/completed-moving around building sutward to westward
UROW- CURBING & GUTTER 05/22/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side
POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING 05/22/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/22/2024 10:37:02 AM *** Bacti reports all passed-2days Inspector Notes from Inspection 9235 *** NOTES ADDED BY LFITZGERALD 5/22/2024 9:50:15 AM *** all curbing now installed 5/15/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side 4/16/2024 - PREVIOUS INSPECTION NOTES day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
FIRE HYDRANT LOCATION AND FLOW TEST 05/15/2024 CANCELLED BY INSPECTOR LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:01:35 AM *** n/a 3/19/2024 - PREVIOUS INSPECTION NOTES please use inspections for fire on fire permit
UROW- CURBING & GUTTER 05/15/2024 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 10:32:39 AM *** NOTE-THIS INSPECTION NOT SCHEDULED AT TIME OF INSTALLS-OBSERVED AND SCHEDULED BY ME WHEN SEN IT WAS DONE *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:50:28 AM *** curbing now installed -east parking and some perimeter for west side
UC-MOT MAINTENANCE OF TRAFFIC 05/15/2024 APPROVED LFITZGERALD
U-GREASE INTERCEPTOR INSTALLED/PLUMBED 05/15/2024 CANCELLED BY INSPECTOR LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:02:45 AM *** n/a
U-GREASE INTERCEPTOR FLOW/DYE TESTED 05/15/2024 CANCELLED BY INSPECTOR LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/15/2024 9:02:17 AM *** n/a
POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING 04/16/2024 PARTIALLY APPROVED LFITZGERALD
Note: day 2 saples now taken-Mat Cline-both sets at PACE 4/15/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING 04/15/2024 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9040 Cline-Matt pulling Day 1 samples after initial flush Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/27/2024 - PREVIOUS INSPECTION NOTES wrong inspection scheduled-spoke with Javier
WATERMAIN FLUSH & PRESSURE TESTED 04/12/2024 APPROVED - AS NOTED LFITZGERALD
Note: 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg
U-WATER MAIN DISINFECTION 04/12/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9700 now over 100ppm chlorine-Phil Story-stay hot till Monday 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/12/2024 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9700 wire tone now completed(Gemstone-tony) 4in potable pig flushed and all including bore pipe pass pressure test 3/22/2024 - PREVIOUS INSPECTION NOTES 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg 3/28/2024 - PREVIOUS INSPECTION NOTES bore plus now pressure tested 3/26/2024 - PREVIOUS INSPECTION NOTES 4in potabe pressure tested from backlow assembly(no bore pipe)to building connection 3/14/2024 - PREVIOUS INSPECTION NOTES Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
U-SEWER FORCE MAIN INSTALL/TESTING 04/01/2024 PARTIALLY APPROVED LFITZGERALD
Note: 2in tap/gate valve /poly pipe installed-POC made at 2nd existing valve(wooded area)
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/28/2024 PARTIALLY APPROVED LFITZGERALD
Note: bore plus now pressure tested 3/26/2024 - PREVIOUS INSPECTION NOTES 4in potabe pressure tested from backlow assembly(no bore pipe)to building connection 3/14/2024 - PREVIOUS INSPECTION NOTES Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
POTABLE WATERMAIN BACTERIOLOGICAL SAMPLING 03/28/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: wrong inspection scheduled-spoke with Javier
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: 4in potabe pressure tested from backlow assembly(no bore pipe)to building connection 3/14/2024 - PREVIOUS INSPECTION NOTES Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
WATERMAIN FLUSH & PRESSURE TESTED 03/22/2024 PARTIALLY APPROVED LFITZGERALD
Note: 4in potable now pigflushed/6in fire -only south line pig flushed-northwest still need pig to be extrsced-resch. for monday cause need to isolate this leg
U - SEWER TIE IN 03/19/2024 APPROVED - AS NOTED LFITZGERALD
Note: sewer now connected from C/O under canopy ,over storm, to building
FIRE HYDRANT LOCATION AND FLOW TEST 03/19/2024 CANCELLED BY APPLICANT LFITZGERALD
Note: please use inspections for fire on fire permit
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/14/2024 PARTIALLY APPROVED LFITZGERALD
Note: Javier requesting for fire hydrant connection at north end/south end-ok'd 3/12/2024 - PREVIOUS INSPECTION NOTES 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/12/2024 PARTIALLY APPROVED LFITZGERALD
Note: 4in. potable/6in fire now installed to under canopy several feet from building connection 3/8/2024 - PREVIOUS INSPECTION NOTES 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/08/2024 PARTIALLY APPROVED LFITZGERALD
Note: 4in potable continuing now to the west stopped at CB1 3/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/07/2024 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9020 4inch tandem backflow/6in fire DCDA now set and installing 4in potable/6in fire northward all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
U-GRAVITY SEWER INSTALL/TESTING 03/04/2024 APPROVED - AS NOTED LFITZGERALD
Note: all gravity sewer installed 2/29/2024 - PREVIOUS INSPECTION NOTES finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
UC-DRAINAGE STRUCT PLACMNT 03/04/2024 APPROVED - AS NOTED LFITZGERALD
Note: ALL drinage structures now installed 2/14/2024 - PREVIOUS INSPECTION NOTES no structures-just roof drain laterals/tie in 2/9/2024 - PREVIOUS INSPECTION NOTES cb7 NOW INSTALLED 2/8/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE PIPE PLACEMENT/LAMPING 03/04/2024 APPROVED - AS NOTED LFITZGERALD
Note: all drainage pipe(roof/mainline) completed 2/29/2024 - PREVIOUS INSPECTION NOTES roof drains west side building/canopy 2/14/2024 - PREVIOUS INSPECTION NOTES installing roof drain laterals to /including tie in to ADS storm pipe 2/9/2024 - PREVIOUS INSPECTION NOTES ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES
BLD - UNDERGROUND SITE LIGHTING CONDUITS 03/01/2024 PARTIALLY APPROVED RMARTIN
Note: front conduits out of footers
U-GRAVITY SEWER INSTALL/TESTING 02/29/2024 PARTIALLY APPROVED LFITZGERALD
Note: finish install from C/O to 5ft. from building 11/28/2023 - PREVIOUS INSPECTION NOTES SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/29/2024 PARTIALLY APPROVED LFITZGERALD
Note: roof drains west side building/canopy 2/14/2024 - PREVIOUS INSPECTION NOTES installing roof drain laterals to /including tie in to ADS storm pipe 2/9/2024 - PREVIOUS INSPECTION NOTES ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 02/23/2024 PARTIALLY APPROVED LFITZGERALD
Note: connection to bore pipe with reducer=6in fire line with T with 4in stub for propsed potable/fire BF set with continuing fire install next week-NOTE this inspection not sheduled but because i have good communication with Jodh-pipe foreman- i was aware of this activity and handled inspection of and resulted 12/11/2023 - PREVIOUS INSPECTION NOTES Mandrel pulled thru bore pipe/reverse tap now coneected/flush now done on piecies/bore 11/6/2023 - PREVIOUS INSPECTION NOTES 10in HDPE bore pipe installed-still need to fuse on MJ adapter at backflow tie-in and wet tap etc,,
UC-DRAINAGE STRUCT PLACMNT 02/14/2024 PARTIALLY APPROVED LFITZGERALD
Note: no structures-just roof drain laterals/tie in 2/9/2024 - PREVIOUS INSPECTION NOTES cb7 NOW INSTALLED 2/8/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/14/2024 PARTIALLY APPROVED LFITZGERALD
Note: installing roof drain laterals to /including tie in to ADS storm pipe 2/9/2024 - PREVIOUS INSPECTION NOTES ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/09/2024 PARTIALLY APPROVED LFITZGERALD
Note: ADS pipe now installed CB6-CB7 2/8/2024 - PREVIOUS INSPECTION NOTES
UC-DRAINAGE STRUCT PLACMNT 02/09/2024 PARTIALLY APPROVED LFITZGERALD
Note: cb7 NOW INSTALLED 2/8/2024 - PREVIOUS INSPECTION NOTES 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE STRUCT PLACMNT 02/08/2024 CANCELLED BY APPLICANT JHARDING
Note: 2/6/2024 - PREVIOUS INSPECTION NOTES 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/08/2024 CANCELLED BY APPLICANT JHARDING
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/06/2024 FINAL APPROVED LFITZGERALD
Note: 2-5 pipe from CB1 TO CB5 placed and backfilled2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24 pipe set/installed from cb3 to cb8 and backfilled-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24 pipe now installed from cb2 to cb3-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2
UC-DRAINAGE STRUCT PLACMNT 02/06/2024 PARTIALLY APPROVED LFITZGERALD
Note: 2-5=CB5placed on rock-firm bottom2-6 inspection scheduled 2/1/2024 - PREVIOUS INSPECTION NOTES 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE STRUCT PLACMNT 02/01/2024 PARTIALLY APPROVED LFITZGERALD
Note: 1-31-24-CB 8 set on 57 stone-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE PIPE PLACEMENT/LAMPING 02/01/2024 PARTIALLY APPROVED LFITZGERALD
Note: 1-31-24 pipe set/installed from cb3 to cb8 and backfilled-inspector on site to witness-scheduled on 2-1-24 1/30/2024 - PREVIOUS INSPECTION NOTES 1-29-24 pipe now installed from cb2 to cb3-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2
UC-DRAINAGE PIPE PLACEMENT/LAMPING 01/30/2024 PARTIALLY APPROVED LFITZGERALD
Note: 1-29-24 pipe now installed from cb2 to cb3-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2
UC-DRAINAGE STRUCT PLACMNT 01/30/2024 PARTIALLY APPROVED LFITZGERALD
Note: 1-29-24-set CB3 -on 57 stone-inspector on site to witness 1/26/2024 - PREVIOUS INSPECTION NOTES cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE STRUCT PLACMNT 01/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: cb2now installed-with 57 rock btm. 1/24/2024 - PREVIOUS INSPECTION NOTES pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
UC-DRAINAGE PIPE PLACEMENT/LAMPING 01/26/2024 PARTIALLY APPROVED LFITZGERALD
Note: from CB2-CB4 installed 1/24/2024 - PREVIOUS INSPECTION NOTES pipe now installed from pond MES to CB2
UC-DRAINAGE PIPE PLACEMENT/LAMPING 01/24/2024 PARTIALLY APPROVED LFITZGERALD
Note: pipe now installed from pond MES to CB2
UC-DRAINAGE STRUCT PLACMNT 01/24/2024 PARTIALLY APPROVED LFITZGERALD
Note: pond MES/CB1 /CB2 now installed(Note-mes set prior to scheduled inspection)
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 12/11/2023 PARTIALLY APPROVED LFITZGERALD
Note: Mandrel pulled thru bore pipe/reverse tap now coneected/flush now done on piecies/bore 11/6/2023 - PREVIOUS INSPECTION NOTES 10in HDPE bore pipe installed-still need to fuse on MJ adapter at backflow tie-in and wet tap etc,,
U-GRAVITY SEWER INSTALL/TESTING 11/29/2023 PARTIALLY APPROVED LFITZGERALD
Note: SDR 26 installed from LS to MH from MH to C/O-issue checked run from MH to C/O w/smart level and found slopes of 0.9/1.1/1.3/1.5 and plans call for 2.0%-Matt/Josh informed and to futher investigate
U-PUMP STATION PRE-INSTALLATION 11/20/2023 APPROVED DHANEY
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 11/06/2023 PARTIALLY APPROVED LFITZGERALD
Note: 10in HDPE bore pipe installed-still need to fuse on MJ adapter at backflow tie-in and wet tap etc,,
UC-CONSTRUCTION ENTRANCE 10/20/2023 PARTIALLY APPROVED LFITZGERALD
Note: cattle gates being used in place of standard rock-ok-informed Jay and Casey fine with as long as soils stay on site and if gets on roadway then brooming etc. will be required
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 10/20/2023 PARTIALLY APPROVED LFITZGERALD
PLAN - PRE-CON 386-986-3750 09/21/2023 APPROVED LFITZGERALD
Note: only Rob Martin and Larry Fitzgerald attended from the city,Casey,Joe and another rep. attended from Robbins, Cline a no show

Review History

Department Status Date In Date Out
BLD CANCEL 10/31/2024 11/01/2024
PLLA CANCEL 10/31/2024 11/04/2024
BLD CANCEL 05/15/2024 05/15/2024
ELEC CANCEL 05/15/2024 05/15/2024
PLENG CANCEL 05/15/2024 05/15/2024
PLLA CANCEL 05/15/2024 05/15/2024
UD1 CANCEL 05/15/2024 05/15/2024
BADMIN REJECT 05/15/2024 05/15/2024
Note: Rejected By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM All Development Order modifications must be submitted via a Site Plan Modification and not through the Site permit.
BLD COMPLETE 08/03/2023 08/04/2023
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 08/03/2023 08/04/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 08/03/2023 08/04/2023
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 08/03/2023 08/04/2023
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 08/03/2023 08/07/2023
Note: Released By: BRICE WRIGHT - (386)986-2398 - BWRIGHT@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 50% (¤222.50) 09/11/2023
ADMINISTRATIVE- SITE DEVELOP ¤125.00 09/11/2023
SITE INSPECTION ¤1,040.00 09/11/2023
SITE PLAN 30 ¤30.00 09/11/2023
Fees Total Due: ¤0.00 Total Paid: ¤972.50