Permit #2023080486

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01580-0050
CONDITIONED SPACE: 1831 sqft
GARAGE: 473 sqft
OPENED PORCH (WITH ROOF) : 116 sqft
OPENED PORCH (WITH ROOF) : 245 sqft
OPENED PORCH (WITH ROOF) : 85 sqft
Total Square Footage: 2750 sqft
Block: 01580
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-237-1210
Location Address: 179 ERIC DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/21/2023
NOC: RECORDED
Applicant name: ANDREW POPOV
Owner: CFHA INVESTMENTS LLC

Address

2527 AMATI DRIVE

KISSIMMEE, FL 34741

Lot: 0050
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SILVER BREEZE HOMES
Status Location Address State License Number Phone
ACTIVE

1 SEATHORN PATH UNIT A

PALM COAST, FL 32164

RR282812121 (Exp: 08/31/2027) 386-237-7700

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 02/21/2025 APPROVED FSLADISH
Note: 2/21/25 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 2/18/2025 - PREVIOUS INSPECTION NOTES 02/18/25 TPOLACEK*** ALL SOD IN ADJACENT LOT ON LEFT SIDE MUST BE DUG DOWN TO MATCH EXISTING GRADE AS DESCRIBED IN THE SWALE PLAN DIAGRAM. SOD MUST ALWAYS MATCH GRADE. DRAWING 300.F 4) MATCH SOD TO EXISTING LAWNS. Inspector Notes from Inspection 9465 2/10/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. INSPECTORS NOTE. DUE TO THE NUMEROUS DRAINAGE INSPECTIONS AND AS DOCUMENTED ON THE LEFT SIDE IN PARTICULAR YOU WILL BE REQUIRED TO SOD THE LEFT SIDE ADJOINING SWALE WHERE IT IS BARE BEFORE ROW FINAL PASSAGE.
BLD - BUILDING FINAL 02/20/2025 FINAL APPROVED MCONTRYMAN
ROW - FINAL APRON (AFTER POUR) 02/18/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 2/10/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. INSPECTORS NOTE. DUE TO THE NUMEROUS DRAINAGE INSPECTIONS AND AS DOCUMENTED ON THE LEFT SIDE IN PARTICULAR YOU WILL BE REQUIRED TO SOD THE LEFT SIDE ADJOINING SWALE WHERE IT IS BARE BEFORE ROW FINAL PASSAGE.
ROW - STORMWATER FINAL 02/18/2025 Disapproved - NO FEE TPOLACEK
Note: 02/18/25 TPOLACEK*** ALL SOD IN ADJACENT LOT ON LEFT SIDE MUST BE DUG DOWN TO MATCH EXISTING GRADE AS DESCRIBED IN THE SWALE PLAN DIAGRAM. SOD MUST ALWAYS MATCH GRADE. DRAWING 300.F 4) MATCH SOD TO EXISTING LAWNS. Inspector Notes from Inspection 9465 2/10/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. INSPECTORS NOTE. DUE TO THE NUMEROUS DRAINAGE INSPECTIONS AND AS DOCUMENTED ON THE LEFT SIDE IN PARTICULAR YOU WILL BE REQUIRED TO SOD THE LEFT SIDE ADJOINING SWALE WHERE IT IS BARE BEFORE ROW FINAL PASSAGE.
U -UTILITY RESIDENTIAL FINAL 02/11/2025 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 02/11/2025 APPROVED - AS NOTED BWRIGHT
Note: No IRR. No CC
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/10/2025 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 TALKED WITH THE BUILDER AND HE IS GOING TO ENSURE THAT THEY HAVE 6" OF CONCRETE BEHIND THE CULVERT TO THE RIGHT OF WAY LINE. PASSING AS NOTED THAT HE STATED THAT IT WILL BE DONE. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. -------------------------------------------------------------------------------------- 1/6/2025 - PREVIOUS INSPECTION NOTES 1/6/25 NOT READY TO POUR.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/10/2025 APPROVED - AS NOTED FSLADISH
Note: 2/10/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. INSPECTORS NOTE. DUE TO THE NUMEROUS DRAINAGE INSPECTIONS AND AS DOCUMENTED ON THE LEFT SIDE IN PARTICULAR YOU WILL BE REQUIRED TO SOD THE LEFT SIDE ADJOINING SWALE WHERE IT IS BARE BEFORE ROW FINAL PASSAGE.
ROW- PRE-APRON (PRE-POUR) 01/13/2025 APPROVED - AS NOTED PFLANAGAN
Note: TALKED WITH THE BUILDER AND HE IS GOING TO ENSURE THAT THEY HAVE 6" OF CONCRETE BEHIND THE CULVERT TO THE RIGHT OF WAY LINE. PASSING AS NOTED THAT HE STATED THAT IT WILL BE DONE. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. -------------------------------------------------------------------------------------- 1/6/2025 - PREVIOUS INSPECTION NOTES 1/6/25 NOT READY TO POUR.
ROW- PRE-APRON (PRE-POUR) 01/06/2025 CANCELLED BY APPLICANT FSLADISH
Note: 1/6/25 NOT READY TO POUR.
ELECTRIC - EARLY POWER 11/12/2024 APPROVED PKNAPIK
Note: Release power Inspector Notes from Inspection 2170 Release Power
GRAVITY SEWER TEST 11/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 11/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW - DRAINAGE 10/15/2024 APPROVED FSLADISH
Note: 10/15/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR COMPLIANCE. ________________________________________________________________________________________________________________________ 10/14/2024 - PREVIOUS INSPECTION NOTES 10/14/24 SPOKE WITH PAUL GRADER WAS ON SITE. WILL BE FIXING THE SWALE TODAY. PARTIALLY APPROVING. WILL INSPECT TOMORROW FOR COMPLETION. ____________________________________________________________________________________________________________________ 10/11/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO ALL BELOW ---------------------------------------------------------------------------------------------- 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOU NEED TO CLEAN OUT YOUR TEMPORARY CULVRT PIPE AND RESET IT TO GRADE. YOU ARE CAUSING A BACKUP IN THE SWALE. YOU NEED TO FIX THE WASHOUT AT THE LEFT SIDE PROPERTY LINE THE SWALE HAS ALMOST WASHED OUT TO THE ROAD EDGE. WILL BE BACK FOR COMPLIANCE REINSPECTION 10/11/24. PHOTO FOR REFERENCE. 10/13/2023 - PREVIOUS INSPECTION NOTES 10/13/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/16/23. _______________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES 10/11/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/13/23 __________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
ROW - DRAINAGE 10/14/2024 PARTIALLY APPROVED FSLADISH
Note: 10/14/24 SPOKE WITH PAUL GRADER WAS ON SITE. WILL BE FIXING THE SWALE TODAY. PARTIALLY APPROVING. WILL INSPECT TOMORROW FOR COMPLETION. ____________________________________________________________________________________________________________________ 10/11/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO DO ALL BELOW ---------------------------------------------------------------------------------------------- 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOU NEED TO CLEAN OUT YOUR TEMPORARY CULVRT PIPE AND RESET IT TO GRADE. YOU ARE CAUSING A BACKUP IN THE SWALE. YOU NEED TO FIX THE WASHOUT AT THE LEFT SIDE PROPERTY LINE THE SWALE HAS ALMOST WASHED OUT TO THE ROAD EDGE. WILL BE BACK FOR COMPLIANCE REINSPECTION 10/11/24. PHOTO FOR REFERENCE. 10/13/2023 - PREVIOUS INSPECTION NOTES 10/13/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/16/23. _______________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES 10/11/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/13/23 __________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
ROW - DRAINAGE 10/11/2024 Disapproved - NO FEE PFLANAGAN
Note: STILL NEED TO DO ALL BELOW ---------------------------------------------------------------------------------------------- 10/7/2024 - PREVIOUS INSPECTION NOTES 10/7/24 YOU NEED TO CLEAN OUT YOUR TEMPORARY CULVRT PIPE AND RESET IT TO GRADE. YOU ARE CAUSING A BACKUP IN THE SWALE. YOU NEED TO FIX THE WASHOUT AT THE LEFT SIDE PROPERTY LINE THE SWALE HAS ALMOST WASHED OUT TO THE ROAD EDGE. WILL BE BACK FOR COMPLIANCE REINSPECTION 10/11/24. PHOTO FOR REFERENCE. 10/13/2023 - PREVIOUS INSPECTION NOTES 10/13/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/16/23. _______________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES 10/11/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/13/23 __________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
ROW - DRAINAGE 10/07/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 10/7/24 YOU NEED TO CLEAN OUT YOUR TEMPORARY CULVRT PIPE AND RESET IT TO GRADE. YOU ARE CAUSING A BACKUP IN THE SWALE. YOU NEED TO FIX THE WASHOUT AT THE LEFT SIDE PROPERTY LINE THE SWALE HAS ALMOST WASHED OUT TO THE ROAD EDGE. WILL BE BACK FOR COMPLIANCE REINSPECTION 10/11/24. PHOTO FOR REFERENCE. 10/13/2023 - PREVIOUS INSPECTION NOTES 10/13/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/16/23. _______________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES 10/11/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/13/23 __________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
PEP TANK INSTALLATION REQUEST 10/04/2024 APPROVED CBOWERMASTER
INSULATION 09/30/2024 APPROVED CVANSTRAHLEN
Note: 9/30/24 Approved (CV) Inspector Notes from Inspection 2420 9/24/24 1. Range nail plate must extend a min of 2'' below the top plate FBCR M1308.2 Check on insulation 9/17/2024 - PREVIOUS INSPECTION NOTES 1. No E-cals on site FBC 107.3.1 2. Product approval sheet does not match windows installed a revision is required 3. Knee wall missing for kitchen island, no outlet boxes installed NEC 210.52 4. Electrical panel is not installed properly must be secured in the wall per manufacter specs 5. Interior load bearing wall top plate has been cut in half to run exhaust vent for range, Will need a engineered letter showing an approved repair 6. Nail plate missing for range vent must extend 2'' below top plate FBCR M1308.2 7. Tub must be filled to over flow FBCR P2503.7 8. SGD and garage entry door require solid blocking gaps over 1/4'' around frames FBCR 609.1
ALL ROUGH 09/24/2024 APPROVED - AS NOTED MKRASKI
Note: 9/24/24 1. Range nail plate must extend a min of 2'' below the top plate FBCR M1308.2 Check on insulation 9/17/2024 - PREVIOUS INSPECTION NOTES 1. No E-cals on site FBC 107.3.1 2. Product approval sheet does not match windows installed a revision is required 3. Knee wall missing for kitchen island, no outlet boxes installed NEC 210.52 4. Electrical panel is not installed properly must be secured in the wall per manufacter specs 5. Interior load bearing wall top plate has been cut in half to run exhaust vent for range, Will need a engineered letter showing an approved repair 6. Nail plate missing for range vent must extend 2'' below top plate FBCR M1308.2 7. Tub must be filled to over flow FBCR P2503.7 8. SGD and garage entry door require solid blocking gaps over 1/4'' around frames FBCR 609.1
ALL ROUGH 09/17/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 1. No E-cals on site FBC 107.3.1 2. Product approval sheet does not match windows installed a revision is required 3. Knee wall missing for kitchen island, no outlet boxes installed NEC 210.52 4. Electrical panel is not installed properly must be secured in the wall per manufacter specs 5. Interior load bearing wall top plate has been cut in half to run exhaust vent for range, Will need a engineered letter showing an approved repair 6. Nail plate missing for range vent must extend 2'' below top plate FBCR M1308.2 7. Tub must be filled to over flow FBCR P2503.7 8. SGD and garage entry door require solid blocking gaps over 1/4'' around frames FBCR 609.1
LATH/BRICK/ WATER BARRIER 09/11/2024 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2460 8/19/2024 - PREVIOUS INSPECTION NOTES 08-19-2024 Roof sheathing only approved. Contractor can procedd with roof shingle installation at own risk. Approved drawings not on site. 08-20-2024 1.Engineering packet not on site. 2. A-4.1 indicates 2 z 12 at front entry. Lintels installed. Please submit a revision and have approved revisin on site prior to next inspection 3. Please indicate all load bearing walls. Check at next inspection. Contractor can proceed at own risk. Roof sheathing is approved.
ELECTRIC TEMP POLE 09/11/2024 APPROVED - AS NOTED KSANDOE
Note: Release Power
ELECTRIC-TUG 09/10/2024 CANCELLED BY INSPECTOR KSANDOE
Note: Cannot install Temporary Underground Power on overhead service.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/20/2024 APPROVED - AS NOTED AGAETANO
Note: 8/19/2024 - PREVIOUS INSPECTION NOTES 08-19-2024 Roof sheathing only approved. Contractor can procedd with roof shingle installation at own risk. Approved drawings not on site. 08-20-2024 1.Engineering packet not on site. 2. A-4.1 indicates 2 z 12 at front entry. Lintels installed. Please submit a revision and have approved revisin on site prior to next inspection 3. Please indicate all load bearing walls. Check at next inspection. Contractor can proceed at own risk. Roof sheathing is approved.
ROOF VALLEY & METAL 08/19/2024 APPROVED AGAETANO
WALL SHEATHING 08/19/2024 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/19/2024 Disapproved - NO FEE AGAETANO
Note: 08-19-2024 Roof sheathing only approved. Contractor can procedd with roof shingle installation at own risk. Approved drawings not on site.
TIE BEAM / LINTEL 07/30/2024 APPROVED AGAETANO
Note: 7/29/2024 - PREVIOUS INSPECTION NOTES 07-29-2024 Approved drawings not on site.
TIE BEAM / LINTEL 07/29/2024 Disapproved - NO FEE AGAETANO
Note: 07-29-2024 Approved drawings not on site.
FOUND SURVEY APPROVED (OFFICE) 07/01/2024 APPROVED TBAKER
MONOLITHIC SLAB 06/24/2024 APPROVED KSANDOE
Note: 6/18/2024 - PREVIOUS INSPECTION NOTES 6/18/24: Previously listed items 2, 3, 4 and 5 remain unresolved. Previous items: 1). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 2). Garage footer is only 10" deep for about 6ft in the middle. 3). Back lanai footer has a mound of dirt under the rebar & plastic that needs to be removed. 4). Interior load bearing footer is not 16" wide at the bottom as required on plans. 5). Silt fence still needs to be repaired. 6/11/2024 - PREVIOUS INSPECTION NOTES 6/11/24: NOT READY! 1). No portable toilet as required. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 2). Garage footers do not consistently meet plan requirements for depth & width. 3). Back footer before lanai does not match plan requirements. 4). Interior load bearing footer does not match plan requirements. 5). Silt fence needs to be repaired & maintained. FBC 3307.1 6). Need to clean up trash and overgrowth to make site safe for inspection. 7). Pipe sleeve at interior bearing wall footer does not extend fully through the footer.
MONOLITHIC SLAB 06/18/2024 Disapproved -FEE REQUIRED RSIMS
Note: 6/18/24: Previously listed items 2, 3, 4 and 5 remain unresolved. Previous items: 1). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 2). Garage footer is only 10" deep for about 6ft in the middle. 3). Back lanai footer has a mound of dirt under the rebar & plastic that needs to be removed. 4). Interior load bearing footer is not 16" wide at the bottom as required on plans. 5). Silt fence still needs to be repaired. 6/11/2024 - PREVIOUS INSPECTION NOTES 6/11/24: NOT READY! 1). No portable toilet as required. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 2). Garage footers do not consistently meet plan requirements for depth & width. 3). Back footer before lanai does not match plan requirements. 4). Interior load bearing footer does not match plan requirements. 5). Silt fence needs to be repaired & maintained. FBC 3307.1 6). Need to clean up trash and overgrowth to make site safe for inspection. 7). Pipe sleeve at interior bearing wall footer does not extend fully through the footer.
MONOLITHIC SLAB 06/11/2024 Disapproved -FEE REQUIRED RSIMS
Note: 6/11/24: NOT READY! 1). No portable toilet as required. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. 2). Garage footers do not consistently meet plan requirements for depth & width. 3). Back footer before lanai does not match plan requirements. 4). Interior load bearing footer does not match plan requirements. 5). Silt fence needs to be repaired & maintained. FBC 3307.1 6). Need to clean up trash and overgrowth to make site safe for inspection. 7). Pipe sleeve at interior bearing wall footer does not extend fully through the footer.
PLUMBING 1ST ROUGH UNDERGROUND 02/16/2024 APPROVED MGIBSON
ROW - DRAINAGE 10/13/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 10/13/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/16/23. _______________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES 10/11/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/13/23 __________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
ROW - DRAINAGE 10/11/2023 Disapproved - NO FEE FSLADISH
Note: 10/11/23 STILL NEED TO GET PORTA POTTY OUT THE ROW AND ONTO YOUR SITE. MAKE SURE TO KEEP SWALE TO GRADE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS. I WILL BE BACK FOR REINSPECTION FOR COMPLIANCE ON 10/13/23 __________________________________________________________________________________________________________________________ 10/6/2023 - PREVIOUS INSPECTION NOTES 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
ROW - DRAINAGE 10/06/2023 PARTIALLY APPROVED FSLADISH
Note: 10/06/23 SWALE IS STILL OPEN AT THIS TIME, IT WILL NEED TO BE MAINTAINED DAILY UNTIL AND AFTER TEMPORARY PIPE IS INSTALLED. WILL BE BACK ON 10/11/23 FOR REINSPECTION. NEED TO REMOVE THE PORTA POTTY FROM SWALE AND PUT IT ON YOUR SITE. _________________________________________________________________________________________________________________________ 10/5/2023 - PREVIOUS INSPECTION NOTES 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
ROW - DRAINAGE 10/05/2023 PARTIALLY APPROVED FSLADISH
Note: 10/05/23 BUILDER CALLED AND LEFT A VOICE MAIL STATING THAT THEY ARE ON SCHEDULE TO HAVE TEMPORARY CULVERT PIPE INSTALLED. AT THIS TIME THE SWALE IS GRADED. I WILL SCEDULE A DRAINAGE INSPECTION FOR TOMORROW. NO FEE __________________________________________________________________________________________________________________________ rjg. Caller at 181 says the new build is blocking the drainage of the swale. Port o potty right in the middle with no temp culvert. Please inspect.
WATER METER INSTALLATION REQUEST 09/20/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 02/11/2025 02/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/14/2025 01/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 01/14/2025 01/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 01/14/2025 01/14/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 10/01/2024 10/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 09/25/2024 09/30/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Highlight changed numbers or only submit numbers tha are changing.
BLD COMPLETE 09/18/2024 09/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/11/2024 09/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 08/13/2024 08/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/01/2024 07/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/01/2024 07/01/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/17/2023 08/20/2023
Note: Released By: JPI
BADMIN INFORMATION 08/17/2023 08/17/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file correctly. See the document submittal requirements on the permit portal page for direction.
BADMIN INFORMATION 08/17/2023 08/17/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your files in accordance with the document submittal requirements located on the permitting portal page.
BLD HOLD 08/09/2023 08/14/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 08/09/2023 08/14/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 08/09/2023 08/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/09/2023 08/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/09/2023 08/14/2023
LOCATE COMPLETE 08/09/2023 08/11/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/09/2023 08/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/09/2023 08/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/09/2023 08/10/2023
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM
BADMIN COMPLETE 08/09/2023 08/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 08/09/2023 09/22/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/20/2025
REINSPECTION RESIDENTIAL ¤40.00 02/20/2025
REINSPECTION RESIDENTIAL ¤40.00 02/20/2025
REINSPECTION RESIDENTIAL ¤40.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG - INSPECTION 20 ¤20.00 02/20/2025
SW ENG INSPECTION 80 ¤80.00 08/21/2023
SW ENG PRE APRON ¤30.00 08/21/2023
SW ENG - REVIEW 20 ¤20.00 08/21/2023
SW ENG RES REVIEW 200 ¤200.00 08/21/2023
TRANS IMPACT FEE ADMIN ¤54.36 08/21/2023
TRANS IMPACT FEE ADMIN (¤54.36) 08/21/2023
SEWER CREDIT (¤1,466.00) 08/21/2023
SEWER INSPECTION ¤25.00 08/21/2023
SEWER CAPITAL FACILITY ¤5,344.82 08/21/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 08/21/2023
SITE PLAN 30 ¤30.00 08/21/2023
CONNECTION FEES ¤1,166.26 08/21/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/21/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/21/2023
FC IMPACT FEE EMS ¤62.00 08/21/2023
IMPACT FEE FIRE ¤420.52 08/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/21/2023
FC IMPACT FEE LIBRARY ¤268.00 08/21/2023
IMPACT FEE PARKS ¤1,769.15 08/21/2023
IMPACT FEE SCHOOL ¤5,450.00 08/21/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 08/21/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/21/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/21/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/21/2023
SURCHARGE FS 533.721 ¤5.45 08/21/2023
SURCHARGE - FS 468.631 ¤8.17 08/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/21/2023
WATER- TURN ON ¤25.00 08/21/2023
ADJUSTMENT 50% (¤544.50) 08/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/21/2023
INSPECTION - RESIDENTIAL ¤825.00 08/21/2023
PLAN REVIEW - RESIDENTIAL ¤234.00 08/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,294.25