I want to search for...
Permit #2023080912
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01100-0030 |
| CONDITIONED SPACE: 1900 sqft |
| GARAGE: 630 sqft |
| OPENED PORCH (WITH ROOF) : 362 sqft |
| OPENED PORCH (WITH ROOF) : 71 sqft |
| Total Square Footage: 2963 sqft |
| Block: 01100 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-4289 |
| Location Address: 96 ERIC DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/26/2023 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: ANDERSON THOMAS R % LEWERS & ASSOC |
|
Address 8 CARLOS COURT PALM COAST, FL 32137 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 10/02/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 10/2/24 YOU HAVE NOT COMPLETED THE HOT PATCH WHERE IT HAS BEEN OUTLINED IN WHITE ON THE PREVIOUS INSPECTION TO REPAIR ON THE EDWARD DRIVE SIDE. THIS NEEDS TO BE COMPLETED AS NOTED BEFORE ROW FINAL PASSAGE. Road Damage must be seen before construction starts Sec 300.01 E2/ Sec 300.03 F1 Sec 300.01 E2 A pre-lot clearing inspection for road damage may be requested, if necessary, by calling the ESWD. If an inspection has not been requested the builder will be responsible for all road damage at the time of the final inspection. AS A ONE TIME COURTESY I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR ROW FINAL. 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 WILL NEED TO HAVE HOT PATCH COMPLETED BEFORE ROW FINAL PASSAGE. WILL NOT EE YOU TODAY AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. | |||
| ROW - STORMWATER FINAL | 10/02/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/2/24 ACCIDENTALLY RESULTED BASED ON THE WRONG ADDRESS FOR ROAD REPAIR. DRIVEWAY HOT PATCH HAS BEEN COMPLETED AT THIS TIME. HAS A SMALL LIP BUT LESS THAN THE THE MAXIMUM ALLOWED. APPROVING AS NOTED. _______________________________________________________________________________________________________________________ 10/2/2024 - PREVIOUS INSPECTION NOTES 10/2/24 YOU HAVE NOT COMPLETED THE HOT PATCH WHERE IT HAS BEEN OUTLINED IN WHITE TO REPAIR ON THE EDWARD DRIVE SIDE. THIS NEEDS TO BE COMPLETED AS NOTED BEFORE ROW FINAL PASSAGE. Road Damage must be seen before construction starts Sec 300.01 E2/ Sec 300.03 F1 Sec 300.01 E2 A pre-lot clearing inspection for road damage may be requested, if necessary, by calling the ESWD. If an inspection has not been requested the builder will be responsible for all road damage at the time of the final inspection. 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 WILL NEED TO HAVE HOT PATCH COMPLETED BEFORE ROW FINAL PASSAGE. WILL NOT EE YOU TODAY AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/02/2024 | FINAL APPROVED | BWRIGHT |
| Note: 9/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/26/2024 10:57:56 AM *** lower sewer clean out | |||
| BLD - BUILDING FINAL | 09/30/2024 | APPROVED | CVANSTRAHLEN |
| Note: 9/30/24 Approved (CV) 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24 do not have power in garage - (CV) | |||
| U-CROSS CONNECTION | 09/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/26/2024 10:57:28 AM *** no irrigation-no cross connection-NOTE HAS BIRRIGATION METER THAT IS NOT GOING TO BE USED SO TOLD rICH-BUILDING SUPERTO CONTACT CITY FORNREMOVAL SO THAT EW H/O does not encur an unneccessary charge every month | |||
| ROW - FINAL APRON (AFTER POUR) | 09/26/2024 | APPROVED | FSLADISH |
| Note: 9/26/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. WILL NEED TO HAVE HOT PATCH COMPLETED BEFORE ROW FINAL. | |||
| U - SEWER TIE IN | 09/26/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| BLD - BUILDING FINAL | 09/26/2024 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: 9/26/24 do not have power in garage - (CV) | |||
| U -UTILITY RESIDENTIAL FINAL | 09/26/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/26/2024 10:57:56 AM *** lower sewer clean out | |||
| ROW - STORMWATER FINAL | 09/26/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/26/24 WILL NEED TO HAVE HOT PATCH COMPLETED BEFORE ROW FINAL PASSAGE. WILL NOT EE YOU TODAY AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/25/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/25/2024 | APPROVED | FSLADISH |
| Note: 9/25/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/30/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ALL ROUGH | 08/22/2024 | APPROVED | AGAETANO |
| Note: 8/21/24: This inspection added for the Kitchen range exhaust piping only so that it can be covered with the finished shroud. | |||
| GRAVITY SEWER TEST | 08/02/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/02/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| TUB SET | 07/30/2024 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 07/30/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 07/30/24 TPOLACEK*** BUILDER MUST INSTALL A SILT FENCE AROUND PROPERTY, REMOVE PORTA POTTY FROM SWALE AND OPEN UP TEMP PIPE AS IT IS CRUSHED AND NOT FUNCTIONING. NEXT INSPECTION THURSDAY 08/01/24 | |||
| ROW - DRAINAGE | 07/01/2024 | CANCELLED BY INSPECTOR | FSLADISH |
| Note: 7/30/2024 - PREVIOUS INSPECTION NOTES 07/30/24 TPOLACEK*** BUILDER MUST INSTALL A SILT FENCE AROUND PROPERTY, REMOVE PORTA POTTY FROM SWALE AND OPEN UP TEMP PIPE AS IT IS CRUSHED AND NOT FUNCTIONING. NEXT INSPECTION THURSDAY 08/01/24 | |||
| PEP TANK INSTALLATION REQUEST | 06/11/2024 | APPROVED | CBOWERMASTER |
| ELECTRIC - EARLY POWER | 06/05/2024 | APPROVED | AGAETANO |
| Note: 6/4/2024 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 06/04/2024 | CANCELLED BY APPLICANT | AGAETANO |
| INSULATION | 04/12/2024 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2420 4/5/24: Approved as noted. Check at Insulation. 1). Kitchen exhaust pipe needs to be sealed at all joints of adjustable elbow as required and please add 3 screws evenly spaced at all pipe connections. FBC 3307.1 2). Hole in slab at soaking tub needs to be repaired with cement as required. Inspector Notes from Inspection 2425 4/3/24: Approved as noted. Check at All Rough. * Need to add an anchor at the top between two top anchors on every window to meet manufacturer's spacing requirements shown on installation documents. Inspector Notes from Inspection 2320 4/1/24: Approved as noted to keep the project moving. Revision still needs to be Approved. Inspector Notes from Inspection 2425 3/27/24: * A revision for the different windows installed (29511.1) than what appears on the original product approval document (15576.1) needs to be submitted to & approved by the City prior to All Rough inspection. Please correct the fixed window and door numbers as needed also. | |||
| ALL ROUGH | 04/05/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/5/24: Approved as noted. Check at Insulation. 1). Kitchen exhaust pipe needs to be sealed at all joints of adjustable elbow as required and please add 3 screws evenly spaced at all pipe connections. FBC 3307.1 2). Hole in slab at soaking tub needs to be repaired with cement as required. Inspector Notes from Inspection 2425 4/3/24: Approved as noted. Check at All Rough. * Need to add an anchor at the top between two top anchors on every window to meet manufacturer's spacing requirements shown on installation documents. Inspector Notes from Inspection 2320 4/1/24: Approved as noted to keep the project moving. Revision still needs to be Approved. Inspector Notes from Inspection 2425 3/27/24: * A revision for the different windows installed (29511.1) than what appears on the original product approval document (15576.1) needs to be submitted to & approved by the City prior to All Rough inspection. Please correct the fixed window and door numbers as needed also. | |||
| WINDOW NAILING | 04/03/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/3/24: Approved as noted. Check at All Rough. * Need to add an anchor at the top between two top anchors on every window to meet manufacturer's spacing requirements shown on installation documents. Inspector Notes from Inspection 2320 4/1/24: Approved as noted to keep the project moving. Revision still needs to be Approved. Inspector Notes from Inspection 2425 3/27/24: * A revision for the different windows installed (29511.1) than what appears on the original product approval document (15576.1) needs to be submitted to & approved by the City prior to All Rough inspection. Please correct the fixed window and door numbers as needed also. | |||
| LATH/BRICK/ WATER BARRIER | 04/01/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/1/24: Approved as noted to keep the project moving. Revision still needs to be Approved. Inspector Notes from Inspection 2425 3/27/24: * A revision for the different windows installed (29511.1) than what appears on the original product approval document (15576.1) needs to be submitted to & approved by the City prior to All Rough inspection. Please correct the fixed window and door numbers as needed also. | |||
| WINDOW NAILING | 03/27/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 3/27/24: * A revision for the different windows installed (29511.1) than what appears on the original product approval document (15576.1) needs to be submitted to & approved by the City prior to All Rough inspection. Please correct the fixed window and door numbers as needed also. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/26/2024 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2460 3/18/24: Approved pending submittal to & approval by the City for the truss repair as noted at the previous inspection on 2/26/24: >Item 2). Need revision for Engineers approved repaired to Truss A8 broken at two areas. 3/11/2024 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 3/18/24: Approved pending submittal to & approval by the City for the truss repair as noted at the previous inspection on 2/26/24: >Item 2). Need revision for Engineers approved repaired to Truss A8 broken at two areas. 3/11/2024 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/11/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| ROOF VALLEY & METAL | 03/11/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/26/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 2/26/24: Roof sheathing & down cell checked and approved. Deficiencies must be resolved prior to next Inspection. Truss Engineering: 1). Truss V1, V2 (entry overframing) & V5, V6 (at interior garage wall overframing) are missing straps as required. 2). Need revision for Engineers approved repaired to Truss A8 broken at two areas. Tie Down: 3). Need revision for the different tie-down (all - thread rod) used at garage wall. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/23/2024 | APPROVED | TBAKER |
| FOOTER | 02/01/2024 | APPROVED | RSIMS |
| Note: 2/1/24: Inspected added footer for Bearing point of girder truss behind Master bath sinks. Verified footer at 5ft x 16" x 20" deep with #5 rebar - three across & 8 long ways with (2) #5 rebar embedded into existing concrete on the short ends. Included 6" PVC sleeve for plumbing. | |||
| TIE BEAM / LINTEL | 02/01/2024 | APPROVED | RSIMS |
| MONOLITHIC SLAB | 01/11/2024 | APPROVED | RSIMS |
| Note: 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24: Cancelled by Applicant via phone at @ 09:28. 1/9/2024 - PREVIOUS INSPECTION NOTES 1/9/24: 1). Left side drain line through footer is missing a sleeve or relieving arch. (Sleeve ends were buried under dirt on both sides along with the majority of the pipe being covered. Exposed now & approved). 2). Per detail 7F on page 6. Requires 3 rebar on the short side. Only 2 installed. Note: Foundation plan does not show any information detailing which footer requirements listed on Plan page 6 are to be followed so you would need to follow all of them unless noted otherwise. | |||
| MONOLITHIC SLAB | 01/10/2024 | CANCELLED BY APPLICANT | RSIMS |
| Note: 1/10/24: Cancelled by Applicant via phone at @ 09:28. 1/9/2024 - PREVIOUS INSPECTION NOTES 1/9/24: 1). Left side drain line through footer is missing a sleeve or relieving arch. (Sleeve ends were buried under dirt on both sides along with the majority of the pipe being covered. Exposed now & approved). 2). Per detail 7F on page 6. Requires 3 rebar on the short side. Only 2 installed. Note: Foundation plan does not show any information detailing which footer requirements listed on Plan page 6 are to be followed so you would need to follow all of them unless noted otherwise. | |||
| MONOLITHIC SLAB | 01/09/2024 | Disapproved - NO FEE | RSIMS |
| Note: 1/9/24: 1). Left side drain line through footer is missing a sleeve or relieving arch. 2). Per detail 7F on page 6. Requires 3 rebar on the short side. Only 2 installed. Note: Foundation plan does not show any information detailing which footer requirements listed on Plan page 6 are to be followed so you would need to follow all of them unless noted otherwise. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/21/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/14/2023 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/27/2024 | 04/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/19/2024 | 03/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/13/2024 | 03/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/28/2024 | 03/04/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2024 | 02/23/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/31/2024 | 02/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/21/2023 | 09/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/14/2023 | 09/15/2023 |
| Note: Released By: JPI | |||
| ELEC | COMPLETE | 09/14/2023 | 09/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/14/2023 | 09/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition (Third Request) | |||
| SW1 | COMPLETE | 09/14/2023 | 09/20/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/28/2023 | 08/29/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/28/2023 | 08/30/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| ELEC | HOLD | 08/28/2023 | 08/31/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need combo alarms outside of bedrooms. FRC 2020 314 and 315 2. Submit manufacture specs of generator 3. Submit a riser diagram showing all wire sizes and breaker sizes including the generator. 4. Submit manufacture specs of the reccess can lights with a min of a 1 hour fire rating in the garage. FRC 2020 302.5 5. Need light and switch by exterior door in garage. NEC 2017 210.70 2nd REQUEST | |||
| MECH | HOLD | 08/28/2023 | 08/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R30 Insulation in attic. Energy calcs say R19. revise to match 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition (Second Request) | |||
| ENGIN1 | COMPLETE | 08/28/2023 | 08/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/28/2023 | 09/07/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM SITE PLAN TO BLURRY TO READ | |||
| CUSVC | COMPLETE | 08/18/2023 | 08/21/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| BADMIN | COMPLETE | 08/17/2023 | 08/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/17/2023 | 08/20/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | HOLD | 08/17/2023 | 08/17/2023 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Please complete and upload a utility application | |||
| ELEC | HOLD | 08/17/2023 | 08/21/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need combo alarms outside of bedrooms. FRC 2020 314 and 315 2. Submit manufacture specs of generator 3. Submit a riser diagram showing all wire sizes and breaker sizes including the generator. 4. Submit manufacture specs of the reccess can lights with a min of a 1 hour fire rating in the garage. FRC 2020 302.5 5. Need light and switch by exterior door in garage. NEC 2017 210.70 | |||
| ENGIN1 | COMPLETE | 08/17/2023 | 08/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/17/2023 | 08/21/2023 |
| LOCATE | COMPLETE | 08/17/2023 | 08/18/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/17/2023 | 08/21/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R30 Insulation in attic. Energy calcs say R19. revise to match 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| SW1 | COMPLETE | 08/17/2023 | 08/25/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/17/2023 | 08/18/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location missing on site plan/survey | |||
| SWALE | COMPLETE | 08/17/2023 | 09/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/03/2024 |
| REINSPECTION FEE | ¤40.00 | 10/03/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/03/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/03/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 09/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/26/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 09/26/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 09/26/2023 |
| SEWER CREDIT | (¤850.00) | 09/26/2023 |
| SEWER INSPECTION | ¤25.00 | 09/26/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 09/26/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 09/26/2023 |
| SITE PLAN 30 | ¤30.00 | 09/26/2023 |
| SURCHARGE FS 533.721 | ¤5.45 | 09/26/2023 |
| SURCHARGE - FS 468.631 | ¤8.17 | 09/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/26/2023 |
| WATER-METER | ¤505.39 | 09/26/2023 |
| WATER- TURN ON | ¤25.00 | 09/26/2023 |
| WATER- TURN ON | ¤25.00 | 09/26/2023 |
| ADJUSTMENT 50% | (¤544.50) | 09/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/26/2023 |
| INSPECTION - RESIDENTIAL | ¤825.00 | 09/26/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤234.00 | 09/26/2023 |
| CONNECTION FEES | ¤1,166.26 | 09/26/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 09/26/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 09/26/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 09/26/2023 |
| IMPACT FEE FIRE | ¤420.52 | 09/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/26/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/26/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 09/26/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 09/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/26/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 09/26/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 09/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,265.64 |