Permit #2023081004

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00340-0120
GARAGE: 698 sqft
CONDITIONED SPACE: 2398 sqft
OPENED PORCH (WITH ROOF) : 293 sqft
Total Square Footage: 3389 sqft
Block: 00340
Subdivision: 0 -
Job Phone: 407-912-8154
Location Address: 9 SERBIAN BELLFLOWER TR
Type: DU - DUPLEX
Issue Date: 09/28/2023
NOC: RECORDED
Applicant name: JUAN CARLOS HENAO-ARISTIZABAL
Owner: RELIABLE BUILDING SOLUTIONS LLC

Address

69 CARRIAGE CREEK WAY

ORMOND BEACH, FL 32174

Lot: 0120
Contracted Stated Job Value: ¤270,000.00
Job Description: Duplex
Type: CN

Contractor

QUEST ROOFING & CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

69 CARRIAGE CREEK WAY

ORMOND BEACH, FL 32174

CGC1525988 (Exp: 08/31/2026) 407-912-8154

Sub Contractors

MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JUAN CARLOS HENAO-ARISTIZABAL
Status Location Address State License Number Phone
ACTIVE

69 CARRIAGE CREEK WAY

ORMOND BEACH, FL 32174

CCC1331523 (Exp: 08/31/2026) 407-912-8154

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 12/19/2024 APPROVED BWRIGHT
BLD - BUILDING FINAL 12/11/2024 FINAL APPROVED BTAYLOR
Note: 12/10/2024 - PREVIOUS INSPECTION NOTES 12-10-24 1. Unit A no hot water. 2. Unit A front bedroom switched outlet has open neutral. 3. Unit B Guest bathroom sink no hot water.
BLD - BUILDING FINAL 12/10/2024 Disapproved - NO FEE BTAYLOR
Note: 12-10-24 1. Unit A no hot water. 2. Unit A front bedroom switched outlet has open neutral. 3. Unit B Guest bathroom sink no hot water.
U -UTILITY RESIDENTIAL FINAL 12/10/2024 FINAL APPROVED BWRIGHT
ROW - FINAL INSPECTION 11/22/2024 APPROVED FSLADISH
Note: 11/22/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION OUTLINED IN WHITE PAINT ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. DUE TO MINOR CHANGES WILL ACCEPT THIS SURVEY. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 11/14/24 MEETING WITH GRADER.. 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. 11/13/2024 - PREVIOUS INSPECTION NOTES 11/13/24 YOUR LEFT SIDE/ REAR ELEVATIONS SHOW YOU ARE DRAINING STRAIGHT DOWN ONTO THE ADJOINING PROPERTY. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATIONS ARE GOOD (LEFT FLAT 3.99). READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW - FINAL APRON (AFTER POUR) 11/22/2024 APPROVED FSLADISH
Note: 11/22/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION OUTLINED IN WHITE PAINT ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. DUE TO MINOR CHANGES WILL ACCEPT THIS SURVEY. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 11/14/24 MEETING WITH GRADER.. 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. 11/13/2024 - PREVIOUS INSPECTION NOTES 11/13/24 YOUR LEFT SIDE/ REAR ELEVATIONS SHOW YOU ARE DRAINING STRAIGHT DOWN ONTO THE ADJOINING PROPERTY. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATIONS ARE GOOD (LEFT FLAT 3.99). READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- PROJECT STATUS 11/14/2024 APPROVED - AS NOTED FSLADISH
Note: 11/14/24 MEETING WITH GRADER..
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/14/2024 APPROVED - AS NOTED FSLADISH
Note: 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. DUE TO MINOR CHANGES WILL ACCEPT THIS SURVEY. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 11/14/24 MEETING WITH GRADER.. 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. 11/13/2024 - PREVIOUS INSPECTION NOTES 11/13/24 YOUR LEFT SIDE/ REAR ELEVATIONS SHOW YOU ARE DRAINING STRAIGHT DOWN ONTO THE ADJOINING PROPERTY. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATIONS ARE GOOD (LEFT FLAT 3.99). READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW FIELD SURVEY /GRADING CERTIFICATION 11/14/2024 APPROVED - AS NOTED FSLADISH
Note: 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION OUTLINED IN WHITE PAINT ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING FIELD SURVEY AS NOTED. Inspector Notes from Inspection 9463 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QUESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. DUE TO MINOR CHANGES WILL ACCEPT THIS SURVEY. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 11/14/24 MEETING WITH GRADER.. 11/14/24 MET WITH GRADER ON SITE TWO SMALL AREAS IN QESTION ON SURVEY ARE MINOR AND WILL BE CORRECTED BEFORE ROW FINAL INSPECTION APPROVING AS NOTED SURVEY WILL PASS. 11/13/2024 - PREVIOUS INSPECTION NOTES 11/13/24 YOUR LEFT SIDE/ REAR ELEVATIONS SHOW YOU ARE DRAINING STRAIGHT DOWN ONTO THE ADJOINING PROPERTY. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATIONS ARE GOOD (LEFT FLAT 3.99). READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/13/2024 Disapproved - NO FEE FSLADISH
Note: 11/13/24 YOUR LEFT SIDE/ REAR ELEVATIONS SHOW YOU ARE DRAINING STRAIGHT DOWN ONTO THE ADJOINING PROPERTY. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Inspector Notes from Inspection 9270 8/19/24 PIPE ELEVATIONS ARE GOOD (LEFT FLAT 3.99). READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ELECTRIC - EARLY POWER 09/10/2024 APPROVED - AS NOTED BTAYLOR
Note: 9/6/2024 - PREVIOUS INSPECTION NOTES 9-6-24 1. Meter boxes are not labeled. 2. Porch lights front and rear hanging. 3. B unit garage lights need to have water proof covers on them. 9-10-24 1. Emailed FPL at 12:34.
ELECTRIC - EARLY POWER 09/06/2024 Disapproved - NO FEE BTAYLOR
Note: 9-6-24 1. Meter boxes are not labeled. 2. Porch lights front and rear hanging. 3. B unit garage lights need to have water proof covers on them.
ROW- PRE-APRON (PRE-POUR) 08/19/2024 APPROVED - AS NOTED FSLADISH
Note: 8/19/24 PIPE ELEVATIONS ARE GOOD (LEFT FLAT 3.99). READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U - SEWER TIE IN 07/19/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 07/19/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 03/28/2024 APPROVED BTAYLOR
Note: 3/25/2024 - PREVIOUS INSPECTION NOTES 3/25/24: Walked with Superintendent. 1). Back lanai outlet boxes installed are not designed for stucco application so they will need to be wrapped with stucco stop or wire lath. 2). Ufer ground needs an outlet type box with a blank cover to provide future access as required. 3). Holes in CMU wall for romex and low voltage wires need wire lath over openings.
LATH/BRICK/ WATER BARRIER 03/25/2024 Disapproved - NO FEE RSIMS
Note: 3/25/24: Walked with Superintendent. 1). Back lanai outlet boxes installed are not designed for stucco application so they will need to be wrapped with stucco stop or wire lath. 2). Ufer ground needs an outlet type box with a blank cover to provide future access as required. 3). Holes in CMU wall for romex and low voltage wires need wire lath over openings.
INSULATION 03/04/2024 APPROVED BTAYLOR
Note: 3/1/2024 - PREVIOUS INSPECTION NOTES 3-1-24 1. Need to leave can of foam that was used to seal all top plate penatrations. Need to check to see that it is fire resistant.
INSULATION 03/01/2024 Disapproved - NO FEE BTAYLOR
Note: 3-1-24 1. Need to leave can of foam that was used to seal all top plate penatrations. Need to check to see that it is fire resistant.
ALL ROUGH 02/26/2024 APPROVED BTAYLOR
Note: 2/1/24: Firewall Nailing Inspection was for firewall section above the cinderblock wall. Lower portion Firewall nailing will be inspected during All Rough Inspection.
FIREWALL FINAL 02/05/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2443 2/1/24: Inspection was for firewall section above the cinderblock wall. Lower portion Firewall nailing will be inspected during All Rough Inspection. 1/25/2024 - PREVIOUS INSPECTION NOTES
FIREWALL DRYWALL NAILING 02/01/2024 APPROVED - AS NOTED RSIMS
Note: 2/1/24: Inspection was for firewall section above the cinderblock wall. Lower portion Firewall nailing will be inspected during All Rough Inspection. 1/25/2024 - PREVIOUS INSPECTION NOTES
FIREWALL DRYWALL NAILING 01/25/2024 CANCELLED BY APPLICANT BTAYLOR
FIREWALL FRAMING 01/19/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 01/19/2024 APPROVED BTAYLOR
WALL SHEATHING 01/16/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/16/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 01/05/2024 APPROVED TBAKER
TIE BEAM / LINTEL 01/04/2024 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 12/27/2023 APPROVED BVITALE
MONOLITHIC SLAB 12/15/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 12/12/2023 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/05/2024 01/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 CANCEL 01/04/2024 01/05/2024
ZON COMPLETE 01/04/2024 01/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 09/06/2023 09/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 09/06/2023 09/08/2023
Note: Released By: JPI
ZON COMPLETE 09/06/2023 09/06/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/06/2023 09/06/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/06/2023 09/19/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD HOLD 08/18/2023 08/20/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 08/18/2023 08/18/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 08/18/2023 08/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/18/2023 08/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/18/2023 08/23/2023
LOCATE COMPLETE 08/18/2023 08/21/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/18/2023 08/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/18/2023 08/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/18/2023 08/22/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Driveways must be a minimum of 16ft in width House doesn't meet rear setback of 10ft. Due to the layout of this duplex it has two fronts and two rears for it must meet a 25 front setback and a 10ft rear All windows and doors facing right of way must have banding. Banding placed around the windows and doors visible from the right-of-way, golf course, canals, lakes, or other similar highly visible areas. Window shutters may substitute for banding. Need another form of articulation. Building massing shall be implemented by use of techniques that reduce the appearance of high building density or bulk. At least one massing treatment, in addition to the articulation requirement, shall be included for each 50 linear feet of wall that exceeds 50 feet in length. A base course or plinth course; banding, moldings, or stringcourses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers as part of the exterior wall construction. Quoins and banding shall wrap around the corners of the structure for at least two feet.
BADMIN COMPLETE 08/18/2023 08/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 12/12/2024
SW ENG - REVIEW 20 ¤20.00 09/28/2023
SW ENG RES REVIEW 200 ¤200.00 09/28/2023
TRANS IMPACT FEE ADMIN ¤84.36 09/28/2023
TRANS IMPACT FEE ADMIN (¤84.36) 09/28/2023
SEWER CREDIT (¤4,587.68) 09/28/2023
SEWER INSPECTION ¤25.00 09/28/2023
SEWER CAPITAL FACILITY ¤10,689.64 09/28/2023
WATER CREDIT (¤195.07) 09/28/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 09/28/2023
SITE PLAN 30 ¤30.00 09/28/2023
WATER- TURN ON ¤50.00 09/28/2023
ADJUSTMENT 50% (¤556.86) 09/28/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/28/2023
INSPECTION - RESIDENTIAL ¤844.25 09/28/2023
PLAN REVIEW - RESIDENTIAL ¤239.46 09/28/2023
CONNECTION FEES ¤2,332.52 09/28/2023
FIRE IMPACT FEE ADMIN ¤25.23 09/28/2023
FIRE IMPACT FEE ADMIN (¤25.23) 09/28/2023
FC IMPACT FEE EMS ¤124.00 09/28/2023
IMPACT FEE FIRE ¤841.04 09/28/2023
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 09/28/2023
FC IMPACT FEE LIBRARY ¤536.00 09/28/2023
IMPACT FEE PARKS ¤3,538.30 09/28/2023
IMPACT FEE SCHOOL ¤10,900.00 09/28/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 09/28/2023
WATER -IRRIGATION INSPECTION ¤50.00 09/28/2023
PARKS IMPACT FEE ADMIN ¤106.15 09/28/2023
PARKS IMPACT FEE ADMIN (¤106.15) 09/28/2023
SURCHARGE FS 533.721 ¤5.57 09/28/2023
SURCHARGE - FS 468.631 ¤8.35 09/28/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/28/2023
SW ENG INSPECTION 80 ¤80.00 09/28/2023
SW ENG PRE APRON ¤30.00 09/28/2023
Fees Total Due: ¤0.00 Total Paid: ¤36,370.28