I want to search for...
Permit #2023081095
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00550-0240 |
| CONDITIONED SPACE: 2956 sqft |
| GARAGE: 888 sqft |
| OPENED PORCH (WITH ROOF) : 270 sqft |
| Total Square Footage: 4114 sqft |
| Block: 00550 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 386-237-5837 |
| Location Address: 21 SEPTEMBER PL |
| Type: DU - DUPLEX |
| Issue Date: 10/05/2023 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: GOUVEIA MARIA H & MARIA & EDUARDO J PACHECO W&H |
|
Address 192 JUNIPER STREET EAST PROVIDENCE, RI 02914 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤495,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
MAXIM BUDNIK
| Status | Location Address | State License Number |
| ACTIVE |
3 WAVECREST PL PALM COAST, FL 32164 |
CAC1818445 (Exp: 08/31/2026) |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| WILDLIFE CHECK - ENVIRONMENTAL | 08/14/2024 | APPROVED | DRODRIGUEZ |
| BLD - BUILDING FINAL | 08/12/2024 | FINAL APPROVED | BTAYLOR |
| ROW - FINAL INSPECTION | 08/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/12/24 REQUIRED CORRECTIONS COMPLETED. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. __________________________________________________________________________________________________________________________ 8/8/2024 - PREVIOUS INSPECTION NOTES 8/8/24 YOU NEED TO PICK UP ALL TRASH ON PROPERTY. INBETWEEN DRIVEWAYS YOU NEED TO REPAIR AND PUT SOD WHERE IT IS BARE. ON THE FAR RIGHT SIDE AT THE EDGE OF ROAD WHERE THE MACHINERY WENT ONTO THE PROPERTY IS LOW AT THE EDGE OF THE ROAD. YOU NEED TO REPAIR AND MATCH SLOPE WITH SOD FLUSH AT THE ROAD EDGE TO ALLOW DRAINAGE FROM ROAD TO DRAIN INTO SWALE. I WILL NOT FEE YOU TODAY AS I WAS HERE TO DO A AFTERPOUR INSPECTION AS WELL. PLEASE MAKE CORRECTIONS REQUIRED BEFORE RESUBMITTING FOR ROW FINAL. PHOTO FOR REFERENCE | |||
| U -UTILITY RESIDENTIAL FINAL | 08/08/2024 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 08/08/2024 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 08/08/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 8/8/24 YOU NEED TO PICK UP ALL TRASH ON PROPERTY. INBETWEEN DRIVEWAYS YOU NEED TO REPAIR AND PUT SOD WHERE IT IS BARE. ON THE FAR RIGHT SIDE AT THE EDGE OF ROAD WHERE THE MACHINERY WENT ONTO THE PROPERTY IS LOW AT THE EDGE OF THE ROAD. YOU NEED TO REPAIR AND MATCH SLOPE WITH SOD FLUSH AT THE ROAD EDGE TO ALLOW DRAINAGE FROM ROAD TO DRAIN INTO SWALE. I WILL NOT FEE YOU TODAY AS I WAS HERE TO DO A AFTERPOUR INSPECTION AS WELL. PLEASE MAKE CORRECTIONS REQUIRED BEFORE RESUBMITTING FOR ROW FINAL. PHOTO FOR REFERENCE | |||
| ROW - FINAL APRON (AFTER POUR) | 08/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/8/24 PIPE ELEVATIONS ARE OK. CUTS ALL MADE. CULVERTS CLEARED. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/07/2024 | APPROVED | PFLANAGAN |
| Note: This survey was passed yesterday plese see notes from 8/6/24 inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/06/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. --------------------------------------------------------------------------- 8/1/24 PARREN AND I MET ON SITE, SPOKE WITH ANTHONY CM AND DISCUSSED WHAT TO DO AS FAR AS GRADING AROUND THE GOPHER TURTLE BURROW AND STILL ACHIEVE POSITIVE DRAINAGE FOR THE PROPERTY. WE THEN CALLED JOE MEDDERS THE GRADER AND LET HIM KNOW WHAT WE WERE LOOKING FOR AS FAR AS GRADE. WE DETERMINED THAT HE WILL HAND CLEAR AROUND THE BURROW AND THEN IN THE REAR LEFT PROPERTY CORNER SLOPE TO DRAINAGE HORSESHOE AND CONTINUE FORWARD. FROM GOPHER BURROW FORWARD TO SWALE KEEP GRADE POSITIVE ALONG THE PROPERTY LINE WITH A TENTH EVERY 20' COPC STANDARD. LET THEM BOTH KNOW WHEN THEY HAVE ACHIEVED FINAL DIRT GRADE WE WOULD BE WILLING TO COME OUT AND MAKE SURE IT WILL WORK TO COPC REQUIREMENTS. Inspector Notes from Inspection 9270 | |||
| ROW - DRAINAGE | 08/06/2024 | APPROVED | PFLANAGAN |
| Note: final grade finished at this time ------------------------------------------------------------------- 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24= the silt fence is incorrect the fabric need to be inside and the wood sticks need to be outside. NEED TO BE BURIED 4 INCHES ON THE GROUND. NEED TO INSTALL A PHDE PIPE ON THE GROUND . SUPER ASK ME FOR MORE DAYS IS NOT READY . +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/5/2024 - PREVIOUS INSPECTION NOTES 1/5/24 YOU WILL NEED TO REMOVE WOOD AND TRASH FROM THE RIGHT OF WAY. YOU NEED TO REMOVE PORTA POTTY FROM THE ROW AND ONTO YOUR SITE. INSTALL SILT FENCE AROND ENTIRE SITE. YOU MUS EITHER KEEP THE SWALE OPEN AND GRADED DAILY AND/OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" DIAMETER. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 1/10/24. SEE PHOTO FOR REFERENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/06/2024 | APPROVED | PFLANAGAN |
| ROW- PROJECT STATUS | 08/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/1/24 PARREN AND I MET ON SITE, SPOKE WITH ANTHONY CM AND DISCUSSED WHAT TO DO AS FAR AS GRADING AROUND THE GOPHER TURTLE BURROW AND STILL ACHIEVE POSITIVE DRAINAGE FOR THE PROPERTY. WE THEN CALLED JOE MEDDERS THE GRADER AND LET HIM KNOW WHAT WE WERE LOOKING FOR AS FAR AS GRADE. WE DETERMINED THAT HE WILL HAND CLEAR AROUND THE BURROW AND THEN IN THE REAR LEFT PROPERTY CORNER SLOPE TO DRAINAGE HORSESHOE AND CONTINUE FORWARD. FROM GOPHER BURROW FORWARD TO SWALE KEEP GRADE POSITIVE ALONG THE PROPERTY LINE WITH A TENTH EVERY 20' COPC STANDARD. LET THEM BOTH KNOW WHEN THEY HAVE ACHIEVED FINAL DIRT GRADE WE WOULD BE WILLING TO COME OUT AND MAKE SURE IT WILL WORK TO COPC REQUIREMENTS. Inspector Notes from Inspection 9270 5/24/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, theCULVERT PIPE | |||
| ELECTRIC - EARLY POWER | 07/17/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7/12/2024 - PREVIOUS INSPECTION NOTES 6/25/2024 - PREVIOUS INSPECTION NOTES 7-12-24 1. Coach lights need to have weather proof covers on them. 2. Unit A outside electrical box on left side not safed off. 3. Unit A microwave not safed off. 7-17-24 1. Emailed FPL at 11:36. | |||
| ELECTRIC - EARLY POWER | 07/12/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6/25/2024 - PREVIOUS INSPECTION NOTES 7-12-24 1. Coach lights need to have weather proof covers on them. 2. Unit A outside electrical box on left side not safed off. 3. Unit A microwave not safed off. | |||
| U-CROSS CONNECTION | 07/03/2024 | APPROVED | DHANEY |
| GRAVITY SEWER TEST | 07/02/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 9450 GRAVITY SEWER TEST NEEDS TO BE SCHEDUALED FOR 7/2/24 | |||
| U - SEWER TIE IN | 07/01/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: GRAVITY SEWER TEST NEEDS TO BE SCHEDUALED FOR 7/2/24 | |||
| ELECTRIC - EARLY POWER | 06/25/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| ROW- PRE-APRON (PRE-POUR) | 05/24/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/24/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, theCULVERT PIPE | |||
| INSULATION | 05/03/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 04/25/2024 | APPROVED | BTAYLOR |
| Note: 4/23/2024 - PREVIOUS INSPECTION NOTES 4/17/2024 - PREVIOUS INSPECTION NOTES 4-23-24 1. Not ready. | |||
| ALL ROUGH | 04/23/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 4/17/2024 - PREVIOUS INSPECTION NOTES 4-23-24 1. Not ready. | |||
| ALL ROUGH | 04/17/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 04/04/2024 | APPROVED | BTAYLOR |
| FIREWALL FINAL | 04/04/2024 | FINAL APPROVED | BTAYLOR |
| WALL SHEATHING | 03/28/2024 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 03/28/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 03/15/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 03/01/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/19/2024 | APPROVED | BTAYLOR |
| ROW - DRAINAGE | 01/10/2024 | Disapproved - NO FEE | GBERTOLA |
| Note: 1/10/24= the silt fence is incorrect the fabric need to be inside and the wood sticks need to be outside. NEED TO BE BURIED 4 INCHES ON THE GROUND. NEED TO INSTALL A PHDE PIPE ON THE GROUND . SUPER ASK ME FOR MORE DAYS IS NOT READY . +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/5/2024 - PREVIOUS INSPECTION NOTES 1/5/24 YOU WILL NEED TO REMOVE WOOD AND TRASH FROM THE RIGHT OF WAY. YOU NEED TO REMOVE PORTA POTTY FROM THE ROW AND ONTO YOUR SITE. INSTALL SILT FENCE AROND ENTIRE SITE. YOU MUS EITHER KEEP THE SWALE OPEN AND GRADED DAILY AND/OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" DIAMETER. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 1/10/24. SEE PHOTO FOR REFERENCE. | |||
| ROW - DRAINAGE | 01/05/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 1/5/24 YOU WILL NEED TO REMOVE WOOD AND TRASH FROM THE RIGHT OF WAY. YOU NEED TO REMOVE PORTA POTTY FROM THE ROW AND ONTO YOUR SITE. INSTALL SILT FENCE AROND ENTIRE SITE. YOU MUS EITHER KEEP THE SWALE OPEN AND GRADED DAILY AND/OR INSTALL A TEMPORARY PIPE MINIMUM OF 12" DIAMETER. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 1/10/24. SEE PHOTO FOR REFERENCE. | |||
| MONOLITHIC SLAB | 12/08/2023 | APPROVED | BTAYLOR |
| Note: 12/7/2023 - PREVIOUS INSPECTION NOTES | |||
| MONOLITHIC SLAB | 12/07/2023 | FINAL APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 12/07/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/05/2023 | APPROVED | BTAYLOR |
| Note: 12/4/2023 - PREVIOUS INSPECTION NOTES PLUMBER STILL WORKING, NEED TO CHANGE PLUMBING CONTRACTOR TO CORRECT ONE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/04/2023 | Disapproved - NO FEE | MGIBSON |
| Note: PLUMBER STILL WORKING, NEED TO CHANGE PLUMBING CONTRACTOR TO CORRECT ONE | |||
| WATER METER INSTALLATION REQUEST | 11/08/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 08/14/2024 | 08/14/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please provide termite certificate. | |||
| ENGIN1 | COMPLETE | 03/01/2024 | 03/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/01/2024 | 03/01/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/05/2023 | 09/05/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/05/2023 | 09/07/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/21/2023 | 08/23/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/21/2023 | 08/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/21/2023 | 08/23/2023 |
| LOCATE | COMPLETE | 08/21/2023 | 08/24/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/21/2023 | 08/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by listed subcontractor | |||
| SW1 | COMPLETE | 08/21/2023 | 08/28/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/21/2023 | 08/21/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Stucco banding is required around all windows and doors facing the public right-of-way. In this case it would be the front only. 2. Unable to locate the square footage table in the plans. | |||
| BADMIN | COMPLETE | 08/21/2023 | 08/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/21/2023 | 09/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 08/13/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/13/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/13/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/13/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/13/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/13/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/13/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/05/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/05/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 10/05/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 10/05/2023 |
| SEWER INSPECTION | ¤25.00 | 10/05/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 10/05/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 10/05/2023 |
| SITE PLAN 30 | ¤30.00 | 10/05/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/05/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/05/2023 |
| WATER- TURN ON | ¤50.00 | 10/05/2023 |
| ADJUSTMENT 50% | (¤888.68) | 10/05/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/05/2023 |
| INSPECTION - RESIDENTIAL | ¤1,361.25 | 10/05/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤386.10 | 10/05/2023 |
| CONNECTION FEES | ¤2,332.52 | 10/05/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 10/05/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 10/05/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 10/05/2023 |
| IMPACT FEE FIRE | ¤841.04 | 10/05/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 10/05/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 10/05/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 10/05/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 10/05/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 10/05/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 10/05/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 10/05/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 10/05/2023 |
| SURCHARGE FS 533.721 | ¤8.89 | 10/05/2023 |
| SURCHARGE - FS 468.631 | ¤13.33 | 10/05/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/05/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤41,613.15 |