Permit #2023081236
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00750-0220 |
| CONDITIONED SPACE: 2784 sqft |
| GARAGE: 900 sqft |
| OPENED PORCH (WITH ROOF) : 260 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 4088 sqft |
| Block: 00750 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-627-0430 |
| Location Address: 6 BUTTONWOOD PL |
| Type: DU - DUPLEX |
| Issue Date: 09/18/2023 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES LLC |
|
Address 72 HERNANDEZ AVENUE PALM COAST, FL 32137 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| WINDOW NAILING | 04/25/2024 | APPROVED | RSIMS |
| Note: 1/3/24- Master Bedroom side A only. | |||
| BLD - BUILDING FINAL | 04/25/2024 | FINAL APPROVED | RSIMS |
| Note: 4/25/24: Waiting for virtual confirmation of GFCI outlets in utility room & oven outlet protection of romex. Completed virtual confirmation via Facetime video/audio app at @ 11:12. | |||
| U-CROSS CONNECTION | 04/25/2024 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 04/25/2024 | FINAL APPROVED | DHANEY |
| ROW - DRAINAGE | 04/24/2024 | APPROVED | PFLANAGAN |
| Note: FINAL GRADE IS FINISHED AT THIS TIME ------------------------------------------------------------------------- 9/28/2023 - PREVIOUS INSPECTION NOTES ** 09/28/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND MAINTAIN AS YOU CURRENTLY HAVE IT BLOCKED PREVENTING STORMWATER TO FLOW TO THE OUTFALL DRAINAGE DITCH ** BUILDER ALSO NEEDS TO RE-INSTALL THE PERIMETER SILT FENCING AS IT IN NOT INSTALLED CORRECTLY YOU HAVE BREACHES AND FENCING NEEDS TO BE BURIED IN A 4 INCH DEEP BY 4 INCH WIDE TRENCH AND BACK FILLED TO CONTAIN SEDIMENT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/03/23 ___________________________________________________________________________________________________________________________ rjg Please Check to see if the drainage across ROW is open. Last house to the ditch. | |||
| ROW - FINAL INSPECTION | 04/24/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/24/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE TO FIELD SO EVERYTHING IS WORKING ------------------------------------------------------------------------------------------- 4/23/2024 - PREVIOUS INSPECTION NOTES ** 04/23/24 AS INDICATED IN PREVIOUS INSPECTION BUILDER HAS A LOW AREA ON RIGHT SIDE OF STRUCTURE THAT HOLDS WATER . PHOTOS WERE TAKEN AT THE TIME OF THE PREVIOUS INSPECTION SHOWING THE STANDINGING WATER THAT WAS NOT FLOWING TO THE FRONT ROAD SIDE SWALE. IT WAS ALSO INDICATED PREVIOUSLY BY I8NSPECTOR FLANNAGEN THAT THE PROPOSED SITE PLAN SHOWS A COMMON SWALE ON THE RIGHT SIDE AS BOTH STRUCTURES WERE BUILT WITHING THE SAME TIME PERIOD. ** NO CORRECTION WERE MADE TO THE RIGHT SIDE I AM ATTACHING THE PREIVIOUS NOTES EXCLUDING THE REPAIRS THAT WERE CALLED FOR ALONG REAR FENCE. I WILL ALSO ATTACH THE LETTER SENT TO ALL CONTRACTORS DATED APRIL 9, 2024 IN REGARD TO FOLLOWING YOUR PROPOSED SITE PLANS ** RIGHT SIDE BETWEEN YOUR STRUCTURE AND THE PROPERTY LINE YOUR ARE HOLDING WATER NO FLOWING FROM REAR TO FRONT ** AS NOTED IN PREVIOUS INSPECTION BUILDER NEEDS TO HAVE A COMMON SWALE ON RIGHT SIDE AS BOTH STRUCTURES WERE DEVELOPED DURING THE SAME TIME FRAME YOU PROPOSED A COMMON SWALE AND SHOW A COMMON SWALE ON YOUR FINAL SURVEY ** SEE ATTACHED PHOTOS INDICATING STANDING WATER FROM THIS INSPECTION **CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 meet with the builder. THEY MOVED AND GRADED THE SOIL 1FT AWAY FROM THE VINYL FENCE ON THE BACK OF THE PROPERTY LINE, AND NOW THEY NEED TO LAY SOD ALL THE WAY DOWN. per gbertola | |||
| ROW - FINAL APRON (AFTER POUR) | 04/24/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/23/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/23/24 AS INDICATED IN PREVIOUS INSPECTION BUILDER HAS A LOW AREA ON RIGHT SIDE OF STRUCTURE THAT HOLDS WATER . PHOTOS WERE TAKEN AT THE TIME OF THE PREVIOUS INSPECTION SHOWING THE STANDINGING WATER THAT WAS NOT FLOWING TO THE FRONT ROAD SIDE SWALE. IT WAS ALSO INDICATED PREVIOUSLY BY I8NSPECTOR FLANNAGEN THAT THE PROPOSED SITE PLAN SHOWS A COMMON SWALE ON THE RIGHT SIDE AS BOTH STRUCTURES WERE BUILT WITHING THE SAME TIME PERIOD. ** NO CORRECTION WERE MADE TO THE RIGHT SIDE I AM ATTACHING THE PREIVIOUS NOTES EXCLUDING THE REPAIRS THAT WERE CALLED FOR ALONG REAR FENCE. I WILL ALSO ATTACH THE LETTER SENT TO ALL CONTRACTORS DATED APRIL 9, 2024 IN REGARD TO FOLLOWING YOUR PROPOSED SITE PLANS ** RIGHT SIDE BETWEEN YOUR STRUCTURE AND THE PROPERTY LINE YOUR ARE HOLDING WATER NO FLOWING FROM REAR TO FRONT ** AS NOTED IN PREVIOUS INSPECTION BUILDER NEEDS TO HAVE A COMMON SWALE ON RIGHT SIDE AS BOTH STRUCTURES WERE DEVELOPED DURING THE SAME TIME FRAME YOU PROPOSED A COMMON SWALE AND SHOW A COMMON SWALE ON YOUR FINAL SURVEY ** SEE ATTACHED PHOTOS INDICATING STANDING WATER FROM THIS INSPECTION **CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9200 meet with the builder. THEY MOVED AND GRADED THE SOIL 1FT AWAY FROM THE VINYL FENCE ON THE BACK OF THE PROPERTY LINE, AND NOW THEY NEED TO LAY SOD ALL THE WAY DOWN. per gbertola | |||
| ROW- PROJECT STATUS | 04/22/2024 | APPROVED - AS NOTED | GBERTOLA |
| Note: meet with the builder. THEY MOVED AND GRADED THE SOIL 1FT AWAY FROM THE VINYL FENCE ON THE BACK OF THE PROPERTY LINE, AND NOW THEY NEED TO LAY SOD ALL THE WAY DOWN. per gbertola | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/18/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/18/24 AS INDICATED IN PREVIOUS INSPECTION BUILDER NEEDS TO INCORPORATE A 4:1 SLOPE IN REAR ALONG FENCE THAT YOU HAVE DUG OUT IS NOT MAINTAINABLE. ** RIGHT SIDE BETWEEN YOUR STRUCTURE AND THE PROPERTY LINE YOUR ARE HOLDING WATER NO FLOWING FROM REAR TO FRONT ** AS NOTED IN PREVIOUS INSPECTION BUILDER NEEDS TO HAVE A COMMON SWALE ON RIGHT SIDE AS BOTH STRUCTURES WERE DEVELOPED DURING THE SAME TIME FRAME YOU PROPOSED A COMMON SWALE AND SHOW A COMMON SWALE ON YOUR FINAL SURVEY ** SEE ATTACHED PHOTOS INDICATING STANDING WATER FROM THIS INSPECTION __________________________________________________________________________________________________________________ 4/17/2024 - PREVIOUS INSPECTION NOTES 4/17/24 UPON WALKING PROPERTY SAW THAT WHERE YOU HAD REMOVED SOD FROM AGAINST REAR FENCE THAT YOU HAVE A FOOT OR MORE BACKFILLED AGAINST THE REAR FENCE CAUSING TOO MUCH EARTH AND PRESSURE AGAINST THE FENCE. I SPOKE TO PARREN AND HE SAID HE DID NOT KNOW AT THE TIME HE TALKED TO YOU ABOUT CORRECTIONS THAT THERE WAS THAT MUCH DIRT BACKFILLED AGAINST THE REAR FENCE. YOU WILL BE REQUIRED TO CREATE A 4;1 SLOPE TO THE BOTTOM OF THE FENCE ACROSS THE REAR PROPERTY LINE. IF YOU HAVE ANY QUESTIONS PLEASE CONTACT PARREN TO DISCUSS, BUT YOU WILL NEED TO SLOPE THE REAR PROPERTY LINE 4:1 TO THE REAR PROPERTY LINE TO THE BOTTOM OF THE FENCE. I WILL NOT FEE YOU TODAY. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 4/4/2024 - PREVIOUS INSPECTION NOTES 1) THE FIELD DOSEN'T MATCH THE FINAL SURVEYS DRAINAGE ALONG THE RIGHT SIDE. IT SHOWS A COMMON ON THE SITE PLAN AND THE FINAL SURVEY BUT THE FIELD SHOWS HAS SWALE ON THE INSIDE THE PROPERTY. NEED TO MAKE YOUR FIELD MATCH WHATS ON THE FINAL SURVEY AS A COMMON SWALE. 2) NEED TO FIX THE WAS OUT ALONG THE LEFT SIDE LOOKS LIKE BEFORE THE PUT THE SOD DOWN IT WASH OUT AND THEY LAID THE SOD ON TOP. 3) NEED TO REMOVE SOD AND DIRT ON THE FENCE IN THE BACK | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/17/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 4/17/24 UPON WALKING PROPERTY SAW THAT WHERE YOU HAD REMOVED SOD FROM AGAINST REAR FENCE THAT YOU HAVE A FOOT OR MORE BACKFILLED AGAINST THE REAR FENCE CAUSING TOO MUCH EARTH AND PRESSURE AGAINST THE FENCE. I SPOKE TO PARREN AND HE SAID HE DID NOT KNOW AT THE TIME HE TALKED TO YOU ABOUT CORRECTIONS THAT THERE WAS THAT MUCH DIRT BACKFILLED AGAINST THE REAR FENCE. YOU WILL BE REQUIRED TO CREATE A 4;1 SLOPE TO THE BOTTOM OF THE FENCE ACROSS THE REAR PROPERTY LINE. IF YOU HAVE ANY QUESTIONS PLEASE CONTACT PARREN TO DISCUSS, BUT YOU WILL NEED TO SLOPE THE REAR PROPERTY LINE 4:1 TO THE REAR PROPERTY LINE TO THE BOTTOM OF THE FENCE. I WILL NOT FEE YOU TODAY. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. 4/4/2024 - PREVIOUS INSPECTION NOTES 1) THE FIELD DOSEN'T MATCH THE FINAL SURVEYS DRAINAGE ALONG THE RIGHT SIDE. IT SHOWS A COMMON ON THE SITE PLAN AND THE FINAL SURVEY BUT THE FIELD SHOWS HAS SWALE ON THE INSIDE THE PROPERTY. NEED TO MAKE YOUR FIELD MATCH WHATS ON THE FINAL SURVEY AS A COMMON SWALE. 2) NEED TO FIX THE WAS OUT ALONG THE LEFT SIDE LOOKS LIKE BEFORE THE PUT THE SOD DOWN IT WASH OUT AND THEY LAID THE SOD ON TOP. 3) NEED TO REMOVE SOD AND DIRT ON THE FENCE IN THE BACK | |||
| ROW- PROJECT STATUS | 04/10/2024 | APPROVED | PFLANAGAN |
| Note: MEET WITH COREY ABOUT THE GRADING ON THIS HOUSE SHOWED HIM WHAT TO DO ON RIGHT SIDE AND THE SOD ON THE FENCE AND THE WASH OUT ON THE LEFT SIDE OF HOME | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/04/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/04/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE FIELD DOSEN'T MATCH THE FINAL SURVEYS DRAINAGE ALONG THE RIGHT SIDE. IT SHOWS A COMMON ON THE SITE PLAN AND THE FINAL SURVEY BUT THE FIELD SHOWS HAS SWALE ON THE INSIDE THE PROPERTY. NEED TO MAKE YOUR FIELD MATCH WHATS ON THE FINAL SURVEY AS A COMMON SWALE. 2) NEED TO FIX THE WAS OUT ALONG THE LEFT SIDE LOOKS LIKE BEFORE THE PUT THE SOD DOWN IT WASH OUT AND THEY LAID THE SOD ON TOP. 3) NEED TO REMOVE SOD AND DIRT ON THE FENCE IN THE BACK | |||
| ROW- PRE-APRON (PRE-POUR) | 03/05/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/5/24 PIPES ARE GOOD. FORM MODIFICATION HAS BEEN COMPLETED AS REQUIRED BY PREVIOUS INSPECTOR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. _________________________________________________________________________________________________________________________ 3/4/2024 - PREVIOUS INSPECTION NOTES 3/1/2024 - PREVIOUS INSPECTION NOTES 03/01/24 right side driveway is better however the driveway on the left still needs correction. see attached photo 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 DRIVEWAY DOES NOT MATCH SITE PLAN. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/04/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 3/1/2024 - PREVIOUS INSPECTION NOTES 03/01/24 right side driveway is better however the driveway on the left still needs correction. see attached photo 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 DRIVEWAY DOES NOT MATCH SITE PLAN. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/01/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 03/01/24 right side driveway is better however the driveway on the left still needs correction. see attached photo. also culvert ends can not be any closer than 5' to edge of road. 2/29/2024 - PREVIOUS INSPECTION NOTES 02/29/24 DRIVEWAY DOES NOT MATCH SITE PLAN. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/29/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 02/29/24 DRIVEWAY DOES NOT MATCH SITE PLAN. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/28/2024 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 02/08/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 2/8/24- Authorize release of email to FPL @ 12:15p 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please Repair Silt fence prior to calling in inspections to avoid future fees | |||
| GRAVITY SEWER TEST | 02/07/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: GRAVITY SEWER AND U-SEWER TIE IN ARE APPROVED HOWEVER UPON INSPECTION PEP-TANKS ARE SITTING AT REAR OF PROPERY CLOSE TO STORMWATER DRAINAGE CANAL. PEP TANKS MAY OR MAY NOT WASH OUT DURING A HEAVY RAIN AND IF BUYER CHOOSES TO INSTALL A FENCE ACCESS TO PEP TANKS MAY BE IN VIOLATION OF UTILITY EASEMENT | |||
| U - SEWER TIE IN | 02/07/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: SEE GRAVITY SEWER NOTE | |||
| PEP TANK INSTALLATION REQUEST | 01/17/2024 | APPROVED | BVITALE |
| FIREWALL FINAL | 01/12/2024 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 1/3/24- Added a Window Nailing Inspection for Master Bed side A. (only). | |||
| INSULATION | 01/12/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 1/3/24- Added a Window Nailing Inspection for Master Bed side A. (only). | |||
| ALL ROUGH | 01/03/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/3/24- Added a Window Nailing Inspection for Master Bed side A. (only). | |||
| LATH/BRICK/ WATER BARRIER | 12/27/2023 | APPROVED | FWILLIS |
| FIREWALL FINAL | 12/27/2023 | Disapproved - NO FEE | LMILLER |
| Note: need documentation on site for installation and use of Cantex PVC pipe wire chase at fire wall (no documents on site showing the use of this material). FBC107.3 | |||
| FIREWALL DRYWALL NAILING | 12/21/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/18/2023 | APPROVED | JSTEWART |
| Note: 12/12/2023 - PREVIOUS INSPECTION NOTES 12/12/23- Missing nails at both H8 hips connection into THJA26 hanger for uplift. Need tie down Info for triple girder at interior bearing wall (Canteliver) not specified on truss layout spec sheet. Note: Roof sheathing is aproved. | |||
| ROOF VALLEY & METAL | 12/12/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 12/12/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/12/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 12/12/23- Missing nails at both H8 hips connection into THJA26 hanger for uplift. Need tie down Info for triple girder at interior bearing wall (Canteliver) not specified on truss layout spec sheet. Note: Roof sheathing is aproved. | |||
| TIE BEAM / LINTEL | 11/22/2023 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/08/2023 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/06/2023 | APPROVED | JSTEWART |
| WATER METER INSTALLATION REQUEST | 09/28/2023 | APPROVED | CBOWERMASTER |
| ROW - DRAINAGE | 09/28/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/28/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND MAINTAIN AS YOU CURRENTLY HAVE IT BLOCKED PREVENTING STORMWATER TO FLOW TO THE OUTFALL DRAINAGE DITCH ** BUILDER ALSO NEEDS TO RE-INSTALL THE PERIMETER SILT FENCING AS IT IN NOT INSTALLED CORRECTLY YOU HAVE BREACHES AND FENCING NEEDS TO BE BURIED IN A 4 INCH DEEP BY 4 INCH WIDE TRENCH AND BACK FILLED TO CONTAIN SEDIMENT ONTO YOUR SITE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/03/23 ___________________________________________________________________________________________________________________________ rjg Please Check to see if the drainage across ROW is open. Last house to the ditch. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/15/2023 | 12/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/16/2023 | 11/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/16/2023 | 11/16/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/02/2023 | 10/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/02/2023 | 10/03/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/02/2023 | 10/02/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM On revised site plan, please provide setback to both driveways - to ensure the one on the left meets the minimum 10' required (easement) and the right side the minimum 5' required. | |||
| BLD | COMPLETE | 08/23/2023 | 08/24/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 08/23/2023 | 08/25/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/23/2023 | 08/28/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/23/2023 | 08/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/23/2023 | 08/28/2023 |
| LOCATE | COMPLETE | 08/23/2023 | 08/24/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/23/2023 | 08/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/23/2023 | 08/31/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2023 | 08/24/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 08/23/2023 | 08/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/23/2023 | 10/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/25/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/25/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/25/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/25/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/04/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/04/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/18/2023 |
| SW ENG PRE APRON | ¤30.00 | 09/18/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/18/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/18/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 09/18/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 09/18/2023 |
| SEWER CREDIT | (¤1,700.00) | 09/18/2023 |
| SEWER INSPECTION | ¤25.00 | 09/18/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 09/18/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 09/18/2023 |
| SITE PLAN 30 | ¤30.00 | 09/18/2023 |
| WATER- TURN ON | ¤50.00 | 09/18/2023 |
| ADJUSTMENT 50% | (¤653.93) | 09/18/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/18/2023 |
| INSPECTION - RESIDENTIAL | ¤995.50 | 09/18/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤282.36 | 09/18/2023 |
| CONNECTION FEES | ¤2,332.52 | 09/18/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 09/18/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 09/18/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 09/18/2023 |
| IMPACT FEE FIRE | ¤841.04 | 09/18/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 09/18/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 09/18/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 09/18/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 09/18/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 09/18/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 09/18/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 09/18/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 09/18/2023 |
| SURCHARGE FS 533.721 | ¤6.54 | 09/18/2023 |
| SURCHARGE - FS 468.631 | ¤9.81 | 09/18/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/18/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤39,682.54 |