I want to search for...
Permit #2023081241
Permit Details
Status: COED
| Parcel Id: 19-11-31-0330-00000-00B0 |
| Total Square Footage: 1050 sqft |
| Block: 00000 |
| Subdivision: 330 - |
| Job Phone: 386-237-0328 |
| Location Address: 67 GREEN CIR |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 08/23/2023 |
| NOC: RECORDED |
| Applicant name: JAMES JOSEPH ALBANO |
| Owner: AMERICAN VILLAGE HOMEOWNERS ASSOCIATION INC |
|
Address 25 OLD KINGS ROAD PALM COAST, FL 32137 |
|
Address SUITE 2B PALM COAST, FL 32137 |
| Lot: 00B0 |
| Contracted Stated Job Value: ¤2,500.00 |
| Job Description: POOL PAVILION - AMENITY BUILDING 2022081367 |
| Type: CN |
| Original Permit #: 2022081367 |
Contractor
ALBANO DESIGNS STUDIOS, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
82 LEE DR PALM COAST, FL 32137 |
CBC050078 (Exp: 08/31/2026) | 386-237-0328 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
SCOTT DALE CRIDER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 353092 PALM COAST, FL 32137 |
CCC1333991 (Exp: 08/31/2026) | 386-276-0758 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 07/21/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: 11/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/25/2024 8:56:16 AM *** not ready-need to walk with as-built/see note om pre-as built inspection this for building so ok-site inspections still need walk thru-as buits etc | |||
| FIRE FINAL | 07/18/2025 | APPROVED | RMARTIN |
| Note: 11/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 11/25/2024 2:32:09 PM *** Need approved plans on site for inspection FBC 107.3 | |||
| HVAC FINAL | 07/18/2025 | FINAL APPROVED | CPISCITELLI |
| Note: virtual inspection with robert martin | |||
| HVAC FINAL | 11/25/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/25/2024 2:13:32 PM *** 11/25/24: 1). Incomplete documents provided for inspection. Need complete set of plans/documents to determine locations, specifications, etc. FBC [A]107.3.1 2). Utility room: No access. FBC[A] 110.5 Please have utility room access available for Re-inspection. | |||
| INSULATION | 11/25/2024 | Disapproved - NO FEE | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 11/25/2024 2:31:29 PM *** Need approved plans on site for inspection FBC 107.3 | |||
| EXTERIOR ARCHITECTURAL FEATURES | 11/25/2024 | APPROVED | RPICATAGI |
| FIRE FINAL | 11/25/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 11/25/2024 2:32:09 PM *** Need approved plans on site for inspection FBC 107.3 | |||
| U - UTILITY COMMERCIAL FINAL | 11/25/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/25/2024 8:56:16 AM *** not ready-need to walk with as-built/see note om pre-as built inspection | |||
| BUILDING FINAL | 05/29/2024 | FINAL APPROVED | FWILLIS |
| Note: 4/11/2024 - PREVIOUS INSPECTION NOTES Note to contractor there are multiple inspections still open. 1. Please have a full set of approved plans on site at the time of inspection. FBC 107.5 | |||
| ELECTRIC FINAL | 05/20/2024 | APPROVED | RMARTIN |
| Note: 5/1/2024 - PREVIOUS INSPECTION NOTES 5/1/24 SAME NOTES FROM PREVIOUS INSPECTION, CONTRACTOR AND ELECTRICIAN NEED TO SET UP A TIME TO MEET ME ON SITE TO DISCUSS ISSUES... ROBERT MARTIN 386-986-7848 2/6/24 NEED TO HAVE CORRECT COVERS ON SWITCHES/OUTLETS FOR FINAL (WEATHERPROOF) ALSO CAN NOT USE ROMEX TO FEED POOL EQUIPMENT NEC 680 1/5/2024 - PREVIOUS INSPECTION NOTES ALL CONDUCTORS NEED TO BE SAFED OFF FOR EARLY POWER, NOT READY | |||
| ELECTRIC FINAL | 05/01/2024 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: 5/1/24 SAME NOTES FROM PREVIOUS INSPECTION, CONTRACTOR AND ELECTRICIAN NEED TO SET UP A TIME TO MEET ME ON SITE TO DISCUSS ISSUES... ROBERT MARTIN 386-986-7848 2/6/24 NEED TO HAVE CORRECT COVERS ON SWITCHES/OUTLETS FOR FINAL (WEATHERPROOF) ALSO CAN NOT USE ROMEX TO FEED POOL EQUIPMENT NEC 680 1/5/2024 - PREVIOUS INSPECTION NOTES ALL CONDUCTORS NEED TO BE SAFED OFF FOR EARLY POWER, NOT READY | |||
| PLUMBING FINAL | 05/01/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED CLEANING UP PERMIT | |||
| BUILDING FINAL | 04/11/2024 | Disapproved - NO FEE | JWALKER |
| Note: Note to contractor there are multiple inspections still open. 1. Please have a full set of approved plans on site at the time of inspection. FBC 107.5 | |||
| PLUMBING 2ND ROUGH | 03/11/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 3100 11/9/2023 - PREVIOUS INSPECTION NOTES PROBLEMS WITH NOC. MAKE CORRECTION FOR RESULTING INSPECTION DUE TO NOC. NOC HAS BEEN RECORDED | |||
| ELECTRIC 2ND ROUGH | 02/06/2024 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED TO HAVE CORRECT COVERS ON SWITCHES/OUTLETS FOR FINAL (WEATHERPROOF) ALSO CAN NOT USE ROMEX TO FEED POOL EQUIPMENT NEC 680 | |||
| ELECTRIC - EARLY POWER | 02/06/2024 | APPROVED - AS NOTED | RMARTIN |
| Note: 2/6/24 NEED TO HAVE CORRECT COVERS ON SWITCHES/OUTLETS FOR FINAL (WEATHERPROOF) ALSO CAN NOT USE ROMEX TO FEED POOL EQUIPMENT NEC 680 1/5/2024 - PREVIOUS INSPECTION NOTES ALL CONDUCTORS NEED TO BE SAFED OFF FOR EARLY POWER, NOT READY | |||
| FRAMING | 01/09/2024 | APPROVED | FWILLIS |
| ELECTRIC 1ST ROUGH | 01/05/2024 | APPROVED | RMARTIN |
| Note: 1/3/2024 - PREVIOUS INSPECTION NOTES COULD NOT VERIFY DEPTH OF CONDUIT TO POOL EQUIPMENT, OK TO HAVE SITE STICK TO MEASURE DEPTH | |||
| ELECTRIC - EARLY POWER | 01/05/2024 | Disapproved - NO FEE | RMARTIN |
| Note: ALL CONDUCTORS NEED TO BE SAFED OFF FOR EARLY POWER, NOT READY | |||
| HVAC ROUGH | 01/05/2024 | APPROVED | PBUCKLEY |
| ELECTRIC 1ST ROUGH | 01/03/2024 | Disapproved - NO FEE | RMARTIN |
| Note: COULD NOT VERIFY DEPTH OF CONDUIT TO POOL EQUIPMENT, OK TO HAVE SITE STICK TO MEASURE DEPTH | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 12/29/2023 | APPROVED | DLEAP |
| GRAVITY SEWER | 11/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 11/9/2023 - PREVIOUS INSPECTION NOTES NOC HAS EXPIRED. PLEASE MAKE CORRECTION TO NOC FOR INSPECTION PURPOSES NOC HAS BEEN RECORDED | |||
| BLD - SEWER TIE IN | 11/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 11/9/2023 - PREVIOUS INSPECTION NOTES PROBLEMS WITH NOC. MAKE CORRECTION FOR RESULTING INSPECTION DUE TO NOC. NOC HAS BEEN RECORDED | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 11/16/2023 | APPROVED | FWILLIS |
| Note: 11/16/23 - ITEMS CORRECTED 9/27/2023 - PREVIOUS INSPECTION NOTES 9/27/23 The listed notes below from the previous inspections have not corrected. Please have the revision submitted before scheduling the reinspection. 1. Please have engineer specifi if P.T. rafter and collar ties are to be used. Or if the existing non P.T. grade #2 rafters and collars ties can remain. 2. Anchor detail for LVLs to block colums has not been provided. Please provide nail patter for fastening the two LVLs together. 3. Gable end framing and anchoring detail has not been provided. Submitt changes and revisions to the building department. Inspector Notes from Inspection 3490 The strapping holding 2x rafter to the LVL beam are approved. The anchors holding the LVL to the block columns still need to be detailed and submitted to the building department by the engineer. More notes can be found on the 2/15/23 roof braced inspection. | |||
| BLD - SEWER TIE IN | 11/09/2023 | Disapproved - NO FEE | MGIBSON |
| Note: PROBLEMS WITH NOC. MAKE CORRECTION FOR RESULTING INSPECTION DUE TO NOC. | |||
| GRAVITY SEWER | 11/09/2023 | Disapproved - NO FEE | MGIBSON |
| Note: NOC HAS EXPIRED. PLEASE MAKE CORRECTION TO NOC FOR INSPECTION PURPOSES | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 09/27/2023 | Disapproved - NO FEE | JWALKER |
| Note: 9/27/23 The listed notes below from the previous inspections have not corrected. Please have the revision submitted before scheduling the reinspection. 1. Please have engineer specifi if P.T. rafter and collar ties are to be used. Or if the existing non P.T. grade #2 rafters and collars ties can remain. 2. Anchor detail for LVLs to block colums has not been provided. Please provide nail patter for fastening the two LVLs together. 3. Gable end framing and anchoring detail has not been provided. Submitt changes and revisions to the building department. Inspector Notes from Inspection 3490 The strapping holding 2x rafter to the LVL beam are approved. The anchors holding the LVL to the block columns still need to be detailed and submitted to the building department by the engineer. More notes can be found on the 2/15/23 roof braced inspection. | |||
| EXTERIOR STRAP/CLIP | 02/16/2023 | APPROVED - AS NOTED | JWALKER |
| Note: The strapping holding 2x rafter to the LVL beam are approved. The anchors holding the LVL to the block columns still need to be detailed and submitted to the building department by the engineer. More notes can be found on the 2/15/23 roof braced inspection. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 02/15/2023 | Disapproved - NO FEE | JWALKER |
| Note: 2/15/23 1. Please have engineer specifi if P.T. rafter and collar ties are to be used. Or if the existing non P.T. grade #2 rafters and collars ties can remain. 2. Anchor detail for LVLs to block colums has not been provided. Please provide nail patter for fastening the two LVLs together. 3. Gable end framing and anchoring detail has not been provided. Submitt changes and revisions to the building department. 2/13/2023 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 02/13/2023 | CANCELLED BY APPLICANT | JWALKER |
| Note: THIS IS A REINSPECTION Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department. | |||
| WATER METER INSTALLATION REQUEST | 06/17/2022 | CANCELLED BY INSPECTOR | LFITZGERALD |
| Note: to be inspected on the site permit | |||
| WATER SERVICE | 06/16/2022 | CANCELLED BY INSPECTOR | MGIBSON |
| Note: WRONG INSPECTION CALLED, CONTRACTOR WAS LOOKING FOR A METER TO BE SET, SPOKE TO CONTRACTOR AND EXPLAINED TO HIM THAT REQUIRED A RPZ BACKFLOW DEVICE AND THAT PLUMBER NEEDS TO GO TO THE UTILITY DEPARTMENT | |||
| ELECTRIC OTHER | 05/11/2022 | CANCELLED BY INSPECTOR | JMUNSON |
| Note: Dont do TUGs on commercial buildings must set temp pole or wait till early power. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 04/28/2022 | Disapproved - NO FEE | JWALKER |
| Note: Conventional framing details shows 2 x 12 rafter at 16" o.c. and 2 x 10 Pt collar ties. Contractor use 2x8s for rafters and 2x6 for collar ties. Only 2 of the rafters installed are of the Pressure treated type. Please provdide details of how the Versa Lam 16" beam are to be fastened to the block wall. And the connections to the 4 Block columns. The print is also lacking a detail for the gable end and how it is to be connected to the Versa Lam beam please provide details. 2 of the 2x8 rafters in the back area of the building are missing the hold down straps. Right side of building. Please submitt above listed detail and revisons of materials to the building department. | |||
| LATH/BRICK/WATER BARRIER | 12/29/2021 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 06/30/2021 | APPROVED | MMESSER |
| PLUMBING 1ST ROUGH | 06/18/2021 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION NOT READY NO TEST ON WATER OR SANITARY | |||
| PLUMBING 1ST ROUGH | 06/11/2021 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NOT READY NO TEST ON WATER OR SANITARY |
Review History
| Department | Status | Date In | Date Out |
| PLENG | COMPLETE | 11/25/2024 | 12/03/2024 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 11/25/2024 | 12/03/2024 |
| Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 12/28/2023 | 12/29/2023 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/23/2023 | 11/03/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/29/2022 | 12/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/24/2022 | 08/29/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Revised Cross Section Detail calls-out #2 Grade Lumber. Provide Grade of Lumber to be installed. | |||
| DSD | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | CANCEL | 08/24/2022 | 08/25/2022 |
| Note: not needed | |||
| MECH | CANCEL | 08/24/2022 | 08/25/2022 |
| Note: not needed | |||
| PLLA | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 08/24/2022 | 08/30/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 08/24/2022 | 08/25/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 05/04/2021 | 05/06/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 04/22/2021 | 04/22/2021 |
| Note: Released By: CHRIS JOHNSON - - CJOHNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/22/2021 | 05/06/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| ARCHR | HOLD | 04/22/2021 | 04/23/2021 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Architectural plan is missing the color chart. Please provide colors to be used for the building and roof. | |||
| PLLA | COMPLETE | 03/17/2021 | 03/31/2021 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - dramirez@ci.palm-coast.fl.us Landscaping for this site will be part of the site permit. | |||
| ARCHR | HOLD | 03/12/2021 | 03/31/2021 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - dramirez@ci.palm-coast.fl.us Provide DO approved architectural plans. | |||
| BLD | HOLD | 03/12/2021 | 03/26/2021 |
| Note: Held By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us 1. Clarify footer detail as to the number of # 5 rebar and depth as there are (2) different details per FBC 7th Ed. Sec. 107.2.1. 2. Provide truss layout per FBCR 7th Ed. Sec. R802.10.2. | |||
| DSD | COMPLETE | 03/12/2021 | 03/18/2021 |
| Note: Released By: JACQUELINE GONZALEZ - - JGONZALEZ@CI.PALM-COAST.FL.US | |||
| ELEC | COMPLETE | 03/12/2021 | 03/17/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 03/12/2021 | 03/23/2021 |
| Note: Released By: WILLIAM MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/12/2021 | 03/18/2021 |
| Note: Released By: CHRIS PISCITELLI - - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 03/12/2021 | 03/26/2021 |
| Note: Released By: FRED REODICA - (386)986-4734 - FReodica@ci.palm-coast.fl.us | |||
| UD1 | HOLD | 03/12/2021 | 03/16/2021 |
| Note: Held By: CHRIS JOHNSON - - cjohnson@ci.palm-coast.fl.us Utility fees, agreements and FDEP permits or Design Engineers letter of determination must be completed before a building permit will be issued. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 07/21/2025 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 07/21/2025 |
| REINSPECTION - COMMERCIAL | ¤60.00 | 07/21/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 07/21/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 07/21/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/23/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/23/2023 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 08/23/2023 |
| INSPECTION COMMERCIAL | ¤60.00 | 08/23/2023 |
| INSPECTION - FIRE COMMERCIAL | ¤0.75 | 08/23/2023 |
| PLAN REVIEW - COMMERCIAL | ¤65.00 | 08/23/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/23/2023 |
| ADJUSTMENT 50% | (¤100.38) | 08/23/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤336.87 |