I want to search for...

Permit #2023081280

Permit Details

Status: COED

Parcel Id: 05-12-31-2755-00000-0190
CONDITIONED SPACE: 2314 sqft
GARAGE: 739 sqft
OPENED PORCH (WITH ROOF) : 381 sqft
Total Square Footage: 3434 sqft
Block: 00000
Subdivision: 2313 - THE GABLES SUBDIVISION
Job Phone: (386)756-0439
Location Address: 237 HAWTHORN AVE
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/26/2023
NOC: RECORDED
Applicant name: JAMES MICHAEL MATHER
Owner: PAYZEN PC LLC

Address

SUITE 1

PORT ORANGE, FL 32127

Address

794 SANDRES ROAD

PORT ORANGE, FL 32127

Lot: 0190
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

PAYTAS HOMES INC
Status Location Address State License Number Phone
ACTIVE

PO BOX 290490

PORT ORANGE, FL 32127

CBC1261873 (Exp: 08/31/2026) (386)756-0439

Sub Contractors

GERALD EDWARD MASTERS JR
Status Location Address State License Number Phone
ACTIVE

505 HERBERT STREET

PORT ORANGE, FL 32129

EC13003217 (Exp: 08/31/2026) (386)304-2600
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
IAN MICHEAL JOHNSON
Status Location Address State License Number Phone Fax
ACTIVE

4244 JACKSON STREET

PORT ORANGE, FL 32127

CCC1325915 (Exp: 08/31/2026) 386-760-0764 386-760-3080

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/02/2024 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 04/02/2024 FINAL APPROVED JHARDING
Note: Inspector Notes from Inspection 9035 No cross connections.
ROW - FINAL APRON (AFTER POUR) 04/01/2024 APPROVED TPOLACEK
Note: 04/01/24 PAVERS ARE SET AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/01/2024 APPROVED TPOLACEK
Note: 04/01/24 CORRECTIONS TO DRAINAGE HAVE BEEN MADE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. -------------------------------------------------------------------------------------------------------------------------- 3/12/2024 - PREVIOUS INSPECTION NOTES THE DRAINAGE OFF THE BACK OF HOUSE DOESN'T MEET CITY STANDARDS OR THE SITE PLANS MASTER DRAINAGE PLAN. NEED TO HAVE MORE FALL OFF THE BACK OFF HOUSE. FBC CHAPTER4 R401.3 Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/01/2024 APPROVED TPOLACEK
Note: 04/01/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 04/01/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 03/21/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/12/2024 Disapproved - NO FEE PFLANAGAN
Note: THE DRAINAGE OFF THE BACK OF HOUSE DOESN'T MEET CITY STANDARDS OR THE SITE PLANS MASTER DRAINAGE PLAN. NEED TO HAVE MORE FALL OFF THE BACK OFF HOUSE. FBC CHAPTER4 R401.3 Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.
ELECTRIC - EARLY POWER 03/07/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 02/12/2024 APPROVED - AS NOTED FSLADISH
Note: 2/12/24 READY FOR PAVERS AT THE TIME OF THIS SECONDARY PREPOUR INNSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24 THIS SITE IS NOT READY FOR SPREAD AND COMPACTION SECONDARY INSPECTION AT THIS TIME. NO PAVER BASE HAS BEEN SPREAD.. SEE PHOTO FOR REFERENCE. I WILL NOT FEE YOU TODAY. MAKE SURE YOU ARE READY FOR INSPECTION BEFORE YOU RESUBMIT FOR SECONDARY PREPOUR INSPECTION. Inspector Notes from Inspection 9271 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 02/09/2024 Disapproved - NO FEE FSLADISH
Note: 2/9/24 THIS SITE IS NOT READY FOR SPREAD AND COMPACTION SECONDARY INSPECTION AT THIS TIME. NO PAVER BASE HAS BEEN SPREAD.. SEE PHOTO FOR REFERENCE. I WILL NOT FEE YOU TODAY. MAKE SURE YOU ARE READY FOR INSPECTION BEFORE YOU RESUBMIT FOR SECONDARY PREPOUR INSPECTION. Inspector Notes from Inspection 9271 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PAVER RESTRAINTS 02/02/2024 APPROVED - AS NOTED FSLADISH
Note: 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 02/02/2024 PARTIALLY APPROVED FSLADISH
Note: 2/2/24 YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
U - SEWER TIE IN 01/29/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 01/17/2024 Approval - Private Provider PPROVIDER
INSULATION 12/28/2023 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 12/22/2023 Approval - Private Provider PPROVIDER
ALL ROUGH 12/22/2023 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 11/27/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 11/20/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/20/2023 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 11/03/2023 Approval - Private Provider PPROVIDER
ELECTRIC - EARLY POWER 11/03/2023 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 10/31/2023 Approval - Private Provider LMUSGROVE
FOUND SURVEY APPROVED (OFFICE) 10/26/2023 APPROVED TBAKER
MONOLITHIC SLAB 10/20/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 10/18/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 10/17/2023 CANCELLED BY INSPECTOR MGIBSON
Note: CONTACT PRIVATE PROVIDER FOR THIS INSPECTION
WATER METER INSTALLATION REQUEST 10/12/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/26/2023 10/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/26/2023 10/26/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 10/03/2023 10/04/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 10/03/2023 10/03/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/03/2023 10/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/21/2023 09/25/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 09/08/2023 09/08/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Original ROW Agreement rec'd 9/1/23. Put in folder at back wall.
SW1 HOLD 09/08/2023 09/19/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. Florida Building Code, Residential, Chapter 4, R401.3
ENGIN1 COMPLETE 09/08/2023 09/08/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 08/24/2023 08/25/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/24/2023 08/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/24/2023 08/31/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 08/24/2023 09/07/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE THE RIGHT AND LEFT DRAINAGE CONVAYANCE A COMMON SWALE DO TO VACANTS
ZON HOLD 08/24/2023 08/24/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement. Please separate floor plan and elevation pages from your set of plans for review
URB COMPLETE 08/24/2023 09/01/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE - RESID PP ¤225.00 04/02/2024
CONNECTION FEES ¤25.00 09/26/2023
FIRE IMPACT FEE ADMIN ¤12.62 09/26/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/26/2023
FC IMPACT FEE EMS ¤62.00 09/26/2023
IMPACT FEE FIRE ¤420.52 09/26/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/26/2023
FC IMPACT FEE LIBRARY ¤268.00 09/26/2023
IMPACT FEE PARKS ¤1,769.15 09/26/2023
IMPACT FEE SCHOOL ¤5,450.00 09/26/2023
RECORDING FEE REIMBURSE DOC ¤44.00 09/26/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 09/26/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/26/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/26/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/26/2023
SURCHARGE FS 533.721 ¤2.00 09/26/2023
SURCHARGE - FS 468.631 ¤2.00 09/26/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/26/2023
SW ENG INSPECTION 80 ¤80.00 09/26/2023
SW ENG PRE APRON ¤30.00 09/26/2023
SW ENG - REVIEW 20 ¤20.00 09/26/2023
SW ENG RES REVIEW 200 ¤200.00 09/26/2023
TRANS IMPACT FEE ADMIN ¤99.33 09/26/2023
TRANS IMPACT FEE ADMIN (¤99.33) 09/26/2023
SEWER INSPECTION ¤25.00 09/26/2023
SITE PLAN 30 ¤30.00 09/26/2023
WATER-METER ¤505.39 09/26/2023
WATER-METER ¤419.86 09/26/2023
ADJUSTMENT 50% (¤15.00) 09/26/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/26/2023
Fees Total Due: ¤0.00 Total Paid: ¤13,166.92