I want to search for...
Permit #2023081280
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0190 |
| CONDITIONED SPACE: 2314 sqft |
| GARAGE: 739 sqft |
| OPENED PORCH (WITH ROOF) : 381 sqft |
| Total Square Footage: 3434 sqft |
| Block: 00000 |
| Subdivision: 2313 - THE GABLES SUBDIVISION |
| Job Phone: (386)756-0439 |
| Location Address: 237 HAWTHORN AVE |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/26/2023 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYZEN PC LLC |
|
Address SUITE 1 PORT ORANGE, FL 32127 |
|
Address 794 SANDRES ROAD PORT ORANGE, FL 32127 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
IAN MICHEAL JOHNSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4244 JACKSON STREET PORT ORANGE, FL 32127 |
CCC1325915 (Exp: 08/31/2026) | 386-760-0764 | 386-760-3080 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/02/2024 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 04/02/2024 | FINAL APPROVED | JHARDING |
| Note: Inspector Notes from Inspection 9035 No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/01/2024 | APPROVED | TPOLACEK |
| Note: 04/01/24 PAVERS ARE SET AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/01/2024 | APPROVED | TPOLACEK |
| Note: 04/01/24 CORRECTIONS TO DRAINAGE HAVE BEEN MADE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. -------------------------------------------------------------------------------------------------------------------------- 3/12/2024 - PREVIOUS INSPECTION NOTES THE DRAINAGE OFF THE BACK OF HOUSE DOESN'T MEET CITY STANDARDS OR THE SITE PLANS MASTER DRAINAGE PLAN. NEED TO HAVE MORE FALL OFF THE BACK OFF HOUSE. FBC CHAPTER4 R401.3 Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/01/2024 | APPROVED | TPOLACEK |
| Note: 04/01/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 04/01/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 03/21/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/12/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE DRAINAGE OFF THE BACK OF HOUSE DOESN'T MEET CITY STANDARDS OR THE SITE PLANS MASTER DRAINAGE PLAN. NEED TO HAVE MORE FALL OFF THE BACK OFF HOUSE. FBC CHAPTER4 R401.3 Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. | |||
| ELECTRIC - EARLY POWER | 03/07/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 02/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/12/24 READY FOR PAVERS AT THE TIME OF THIS SECONDARY PREPOUR INNSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24 THIS SITE IS NOT READY FOR SPREAD AND COMPACTION SECONDARY INSPECTION AT THIS TIME. NO PAVER BASE HAS BEEN SPREAD.. SEE PHOTO FOR REFERENCE. I WILL NOT FEE YOU TODAY. MAKE SURE YOU ARE READY FOR INSPECTION BEFORE YOU RESUBMIT FOR SECONDARY PREPOUR INSPECTION. Inspector Notes from Inspection 9271 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/09/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 2/9/24 THIS SITE IS NOT READY FOR SPREAD AND COMPACTION SECONDARY INSPECTION AT THIS TIME. NO PAVER BASE HAS BEEN SPREAD.. SEE PHOTO FOR REFERENCE. I WILL NOT FEE YOU TODAY. MAKE SURE YOU ARE READY FOR INSPECTION BEFORE YOU RESUBMIT FOR SECONDARY PREPOUR INSPECTION. Inspector Notes from Inspection 9271 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW- PAVER RESTRAINTS | 02/02/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/02/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 2/2/24 YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTAINTS AT THE TIME OF THIS INSPECTION. *** DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY INSPECTION HES BEEN PASSED*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| U - SEWER TIE IN | 01/29/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/17/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 12/28/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/22/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/22/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/27/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 11/20/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/20/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 11/03/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 11/03/2023 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 10/31/2023 | Approval - Private Provider | LMUSGROVE |
| FOUND SURVEY APPROVED (OFFICE) | 10/26/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/20/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/18/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/17/2023 | CANCELLED BY INSPECTOR | MGIBSON |
| Note: CONTACT PRIVATE PROVIDER FOR THIS INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 10/12/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/26/2023 | 10/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/26/2023 | 10/26/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/03/2023 | 10/04/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/03/2023 | 10/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/21/2023 | 09/25/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/08/2023 | 09/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Original ROW Agreement rec'd 9/1/23. Put in folder at back wall. | |||
| SW1 | HOLD | 09/08/2023 | 09/19/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. Florida Building Code, Residential, Chapter 4, R401.3 | |||
| ENGIN1 | COMPLETE | 09/08/2023 | 09/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/24/2023 | 08/25/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/24/2023 | 08/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/24/2023 | 08/31/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/24/2023 | 09/07/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE THE RIGHT AND LEFT DRAINAGE CONVAYANCE A COMMON SWALE DO TO VACANTS | |||
| ZON | HOLD | 08/24/2023 | 08/24/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement. Please separate floor plan and elevation pages from your set of plans for review | |||
| URB | COMPLETE | 08/24/2023 | 09/01/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 04/02/2024 |
| CONNECTION FEES | ¤25.00 | 09/26/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 09/26/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 09/26/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 09/26/2023 |
| IMPACT FEE FIRE | ¤420.52 | 09/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/26/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/26/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 09/26/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/26/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 09/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 09/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/26/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 09/26/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 09/26/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/26/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/26/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 09/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/26/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 09/26/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 09/26/2023 |
| SEWER INSPECTION | ¤25.00 | 09/26/2023 |
| SITE PLAN 30 | ¤30.00 | 09/26/2023 |
| WATER-METER | ¤505.39 | 09/26/2023 |
| WATER-METER | ¤419.86 | 09/26/2023 |
| ADJUSTMENT 50% | (¤15.00) | 09/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,166.92 |