I want to search for...

Permit #2023081324

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00050-0050
CONDITIONED SPACE: 2526 sqft
GARAGE: 711 sqft
OPENED PORCH (WITH ROOF) : 368 sqft
Total Square Footage: 3605 sqft
Block: 00050
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 229-375-9123
Location Address: 11 FARMSWORTH DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/12/2023
NOC: RECORDED
Applicant name: WILLIAM ROBERT BARRICK
Owner: RIVERA DOMINGO & NORMA

Address

13136 BROOKSIDE MOSS DRIVE

RIVERVIEW, FL 33579

Lot: 0050
Contracted Stated Job Value: ¤348,855.00
Job Description: Single Family Residence
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
CANCEL

21 CEDARWOOD CT

PALM COAST, FL 32137

RB29003845 (Exp: 08/31/2025) 386-585-4097

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
WILLIAM ROBERT BARRICK
Status Location Address Mailing Address State License Number Phone
CANCEL

50 LEANNI WAY

PALM COAST, FL 32137

STE E2

PALM COAST, FL 32137

RC29027799 (Exp: 08/31/2025) 229-375-9123
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/24/2024 FINAL APPROVED MKRASKI
ROW - STORMWATER FINAL 05/16/2024 APPROVED EMADISON
Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 05/15/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/15/24 NO CORRECTIONS HAVE BEEN MADE SINCE PREVVIOUS INSPECTION ON 05/13/23 ** RIGHT SIDE IN THE RIGHT OF WAY NEED TO REPAIR AND SOD UP TO POWER POLE ** ALONG RIGHT SIDE PROPERTY LINE NEED TO SOD ALONG EDGE ALL BARE EARTH AND MATCH GRADE ** ACROSS REAR PROPERTY LINE NEED TO FILL HOLE NEAR RIGHT REAR CORNER AND SOD ALL BAR AREAS ** LEFT REAR CORNER NEED TO REMOVE ALL TRASH IN RIGHT OF WAY (ROW) ** REPAIR RUTS IN ROW ALONG FARISTON ON LEFT SIDE ___________________________________________________________________________________________________________________ 5/13/2024 - PREVIOUS INSPECTION NOTES ** 05/13/24 RIGHT SIDE IN THE RIGHT OF WAY NEED TO REPAIR AND SOD UP TO POWER POLE ** ALONG RIGHT SIDE PROPERTY LINE NEED TO SOD ALONG EDGE ALL BARE EARTH AND MATCH GRADE ** ACROSS REAR PROPERTY LINE NEED TO FILL HOLE NEAR RIGHT REAR CORNER AND SOD ALL BAR AREAS ** LEFT REAR CORNER NEED TO REMOVE ALL TRASH IN RIGHT OF WAY (ROW) ** REPAIR RUTS IN ROW ALONG FARISTON ON LEFT SIDE
U -UTILITY RESIDENTIAL FINAL 05/13/2024 FINAL APPROVED DHANEY
ROW - STORMWATER FINAL 05/13/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/13/24 RIGHT SIDE IN THE RIGHT OF WAY NEED TO REPAIR AND SOD UP TO POWER POLE ** ALONG RIGHT SIDE PROPERTY LINE NEED TO SOD ALONG EDGE ALL BARE EARTH AND MATCH GRADE ** ACROSS REAR PROPERTY LINE NEED TO FILL HOLE NEAR RIGHT REAR CORNER AND SOD ALL BAR AREAS ** LEFT REAR CORNER NEED TO REMOVE ALL TRASH IN RIGHT OF WAY (ROW) ** REPAIR RUTS IN ROW ALONG FARISTON ON LEFT SIDE
ROW - FINAL APRON (AFTER POUR) 05/13/2024 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 05/10/2024 APPROVED GBERTOLA
Note: AT THE CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/9/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY GBERTOLA 5/9/2024 8:27:27 AM *** IN ORDER TO PERFORM THE INSPECTION, THE INSPECTOR NEEDS TO WALK THE PERIMETER. HOWEVER, THE SPRINKLERS ARE ON AND THE INSPECTOR CANNOT ACCESS THE RIGHT SIDE.
U-CROSS CONNECTION 05/10/2024 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/09/2024 APPROVED GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 5/9/2024 8:23:23 AM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9270 4/10/24 BOTH CULVERT PIPES ARE 7.15 FLAT. GOING TO PASS THIS AS NOTED DUE TO THE FACT THAT WHILE FLAT, WITH ALL THE DIFFICULTY TRYING TO GET THIS PIPE SET IT IS STILL WITHIN TOLERANCE. . YOU NEED TO MAKE SURE ALL AREAS ABOVE ROW ARE 4" OF CONCRETE COVERAGE SPOKE WITH BUILDER ONSITE AND LET THEM KNOW I WOULD PASS THIS AS NOTED BUT A COUPLE SMALL AREAS WILL NEED TO BE SHAVED DOWN TO 4". AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 4/8/2024 - PREVIOUS INSPECTION NOTES 4/4/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT ON THE LEFT IS STILL LOWER THAN THE CULVERT ON THE RIGHT. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2) THE CULVERT ON THE LEFT IS FLOWING THE WRONG DIRECTION. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 3) THE CULVERT TO THE RIGHT IS PITCHED TO MUCH. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 4) WITH THE RAIN YESTERDAY FOOTERS ARE FULL OF WATER. 5) WITH THE RAIN YESTERDAY THE SOIL ALONG THE CULVERTS ARE TO SOFT. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) 6) ALL FOOTER AT THE MITER ENDS NEED TO BE 6"X6". SEE DRAWING IN TECHNICAL MANUAL Sec 300.E --------------------------------------------------------------------------------------- 4/1/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE ON THE LEFT IS LOWER THAN THE RIGHT CULVERT THE FLOW IS FROM LEFT TO RIGHT NEED TO RESET CULVERT SO WATER WILL FLOW TO OUTFALL DOWN THE STREET. 2) BOTH CULVERTS ARE FLOWING IN THE WRONG DIRECTION NEED TO RESET CULVERT SO THE FLOW FROM LEFT TO RIGHT. ------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 NOTHING HAS CHANGED SINCE LAST INSPECTION CULVERT PIPE ELEVATIONS HAVE NOT CHANGED. BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ________________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW FIELD SURVEY /GRADING CERTIFICATION 05/09/2024 Disapproved - NO FEE GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 5/9/2024 8:27:27 AM *** IN ORDER TO PERFORM THE INSPECTION, THE INSPECTOR NEEDS TO WALK THE PERIMETER. HOWEVER, THE SPRINKLERS ARE ON AND THE INSPECTOR CANNOT ACCESS THE RIGHT SIDE.
ROW- PRE-APRON (PRE-POUR) 04/10/2024 APPROVED - AS NOTED FSLADISH
Note: 4/10/24 BOTH CULVERT PIPES ARE 7.15 FLAT. GOING TO PASS THIS AS NOTED DUE TO THE FACT THAT WHILE FLAT, WITH ALL THE DIFFICULTY TRYING TO GET THIS PIPE SET IT IS STILL WITHIN TOLERANCE. . YOU NEED TO MAKE SURE ALL AREAS ABOVE ROW ARE 4" OF CONCRETE COVERAGE SPOKE WITH BUILDER ONSITE AND LET THEM KNOW I WOULD PASS THIS AS NOTED BUT A COUPLE SMALL AREAS WILL NEED TO BE SHAVED DOWN TO 4". AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 4/8/2024 - PREVIOUS INSPECTION NOTES 4/4/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT ON THE LEFT IS STILL LOWER THAN THE CULVERT ON THE RIGHT. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2) THE CULVERT ON THE LEFT IS FLOWING THE WRONG DIRECTION. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 3) THE CULVERT TO THE RIGHT IS PITCHED TO MUCH. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 4) WITH THE RAIN YESTERDAY FOOTERS ARE FULL OF WATER. 5) WITH THE RAIN YESTERDAY THE SOIL ALONG THE CULVERTS ARE TO SOFT. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) 6) ALL FOOTER AT THE MITER ENDS NEED TO BE 6"X6". SEE DRAWING IN TECHNICAL MANUAL Sec 300.E --------------------------------------------------------------------------------------- 4/1/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE ON THE LEFT IS LOWER THAN THE RIGHT CULVERT THE FLOW IS FROM LEFT TO RIGHT NEED TO RESET CULVERT SO WATER WILL FLOW TO OUTFALL DOWN THE STREET. 2) BOTH CULVERTS ARE FLOWING IN THE WRONG DIRECTION NEED TO RESET CULVERT SO THE FLOW FROM LEFT TO RIGHT. ------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 NOTHING HAS CHANGED SINCE LAST INSPECTION CULVERT PIPE ELEVATIONS HAVE NOT CHANGED. BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ________________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 04/08/2024 CANCELLED BY APPLICANT FSLADISH
Note: 4/4/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT ON THE LEFT IS STILL LOWER THAN THE CULVERT ON THE RIGHT. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2) THE CULVERT ON THE LEFT IS FLOWING THE WRONG DIRECTION. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 3) THE CULVERT TO THE RIGHT IS PITCHED TO MUCH. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 4) WITH THE RAIN YESTERDAY FOOTERS ARE FULL OF WATER. 5) WITH THE RAIN YESTERDAY THE SOIL ALONG THE CULVERTS ARE TO SOFT. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) 6) ALL FOOTER AT THE MITER ENDS NEED TO BE 6"X6". SEE DRAWING IN TECHNICAL MANUAL Sec 300.E --------------------------------------------------------------------------------------- 4/1/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE ON THE LEFT IS LOWER THAN THE RIGHT CULVERT THE FLOW IS FROM LEFT TO RIGHT NEED TO RESET CULVERT SO WATER WILL FLOW TO OUTFALL DOWN THE STREET. 2) BOTH CULVERTS ARE FLOWING IN THE WRONG DIRECTION NEED TO RESET CULVERT SO THE FLOW FROM LEFT TO RIGHT. ------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 NOTHING HAS CHANGED SINCE LAST INSPECTION CULVERT PIPE ELEVATIONS HAVE NOT CHANGED. BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ________________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 04/04/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THE CULVERT ON THE LEFT IS STILL LOWER THAN THE CULVERT ON THE RIGHT. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2) THE CULVERT ON THE LEFT IS FLOWING THE WRONG DIRECTION. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 3) THE CULVERT TO THE RIGHT IS PITCHED TO MUCH. Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 4) WITH THE RAIN YESTERDAY FOOTERS ARE FULL OF WATER. 5) WITH THE RAIN YESTERDAY THE SOIL ALONG THE CULVERTS ARE TO SOFT. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) 6) ALL FOOTER AT THE MITER ENDS NEED TO BE 6"X6". SEE DRAWING IN TECHNICAL MANUAL Sec 300.E --------------------------------------------------------------------------------------- 4/1/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE ON THE LEFT IS LOWER THAN THE RIGHT CULVERT THE FLOW IS FROM LEFT TO RIGHT NEED TO RESET CULVERT SO WATER WILL FLOW TO OUTFALL DOWN THE STREET. 2) BOTH CULVERTS ARE FLOWING IN THE WRONG DIRECTION NEED TO RESET CULVERT SO THE FLOW FROM LEFT TO RIGHT. ------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 NOTHING HAS CHANGED SINCE LAST INSPECTION CULVERT PIPE ELEVATIONS HAVE NOT CHANGED. BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ________________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PROJECT STATUS 04/04/2024 APPROVED PFLANAGAN
Note: MEETING PIPE GUY FOR DRIVEWAY CULVERTS
ROW- PRE-APRON (PRE-POUR) 04/01/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THE CULVERT PIPE ON THE LEFT IS LOWER THAN THE RIGHT CULVERT THE FLOW IS FROM LEFT TO RIGHT NEED TO RESET CULVERT SO WATER WILL FLOW TO OUTFALL DOWN THE STREET. 2) BOTH CULVERTS ARE FLOWING IN THE WRONG DIRECTION NEED TO RESET CULVERT SO THE FLOW FROM LEFT TO RIGHT. ------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 NOTHING HAS CHANGED SINCE LAST INSPECTION CULVERT PIPE ELEVATIONS HAVE NOT CHANGED. BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ________________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 03/28/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 3/28/24 NOTHING HAS CHANGED SINCE LAST INSPECTION CULVERT PIPE ELEVATIONS HAVE NOT CHANGED. BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE COPC SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place ________________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 03/27/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 3/27/24 BOTH CULVERT PIPES ARE OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM. THEY WILL HAVE TO BE RESET TO WITHIN THE SWALE PLAN DIAGRAM'S TOLERANCE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ELECTRIC - EARLY POWER 03/21/2024 APPROVED RMARTIN
GRAVITY SEWER TEST 03/01/2024 APPROVED MGIBSON
U - SEWER TIE IN 03/01/2024 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 01/29/2024 APPROVED AGAETANO
INSULATION 01/24/2024 APPROVED AGAETANO
ALL ROUGH 01/18/2024 APPROVED AGAETANO
ROOF VALLEY & METAL 01/10/2024 APPROVED AGAETANO
WALL SHEATHING 12/27/2023 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/27/2023 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 12/07/2023 APPROVED TBAKER
TIE BEAM / LINTEL 11/09/2023 APPROVED AGAETANO
Note: 11/8/2023 - PREVIOUS INSPECTION NOTES 11-8-2023
TIE BEAM / LINTEL 11/08/2023 Disapproved - NO FEE AGAETANO
Note: 11-8-2023 Two missed dowels, highlighted on drawings.
MONOLITHIC SLAB 10/27/2023 APPROVED FWILLIS
Note: 10/26/2023 - PREVIOUS INSPECTION NOTES 10/25/2023 - PREVIOUS INSPECTION NOTES 20-25-2023 AC chase cannot be in column area. FRC 403 10-26-2023 Above issue has not been resolved. AC chase cannot be in column area. FRC 403.
MONOLITHIC SLAB 10/26/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 10/25/2023 - PREVIOUS INSPECTION NOTES 20-25-2023 AC chase cannot be in column area. FRC 403 10-26-2023 Above issue has not been resolved. AC chase cannot be in column area. FRC 403.
MONOLITHIC SLAB 10/25/2023 Disapproved - NO FEE AGAETANO
Note: 20-25-2023 AC chase cannot be in column area. FRC 403
PLUMBING 1ST ROUGH UNDERGROUND 10/20/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/09/2023 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 08/30/2023 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/27/2024 04/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 03/27/2024 04/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/27/2024 04/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/27/2024 03/27/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/07/2023 12/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/07/2023 12/07/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 11/13/2023 11/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/23/2023 10/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/23/2023 10/30/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 10/23/2023 10/23/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 09/08/2023 09/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/08/2023 09/11/2023
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ZON HOLD 08/29/2023 08/29/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM LOT SIZE REQUIRES TOTAL OF 7 TREES. ONLY 5 DEPICTED ON LANDSCAPE PLAN.
BADMIN COMPLETE 08/29/2023 09/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 08/25/2023 10/04/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLENV COMPLETE 08/25/2023 08/29/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 08/29/2023 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BLD COMPLETE 08/24/2023 08/30/2023
Note: Released By: JPI
CUSVC COMPLETE 08/24/2023 08/25/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 08/24/2023 08/29/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/24/2023 08/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/24/2023 08/29/2023
LOCATE COMPLETE 08/24/2023 08/25/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 08/24/2023 08/29/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout signed by the AC contractor
SW1 COMPLETE 08/24/2023 08/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/24/2023 08/25/2023
Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM LOT SIZE REQUIRES TOTAL OF 7 TREES. ONLY 5 DEPICTED ON LANDSCAPE PLAN.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 05/24/2024
REINSPECTION RESIDENTIAL ¤40.00 05/24/2024
SW ENG REINSPECTION 20 ¤20.00 05/24/2024
SW ENG REINSPECTION 20 ¤20.00 05/24/2024
SW ENG REINSPECTION 20 ¤20.00 05/24/2024
SW ENG REINSPECTION 30 ¤30.00 05/24/2024
SW ENG REINSPECTION 30 ¤30.00 05/24/2024
SW ENG REINSPECTION 30 ¤30.00 05/24/2024
SW ENG REINSPECTION 30 ¤30.00 05/24/2024
SW ENG - REVIEW 20 ¤20.00 09/12/2023
SW ENG RES REVIEW 200 ¤200.00 09/12/2023
TRANS IMPACT FEE ADMIN ¤54.36 09/12/2023
TRANS IMPACT FEE ADMIN (¤54.36) 09/12/2023
SEWER CREDIT (¤2,465.75) 09/12/2023
SEWER INSPECTION ¤25.00 09/12/2023
SEWER CAPITAL FACILITY ¤5,344.82 09/12/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 09/12/2023
SITE PLAN 30 ¤30.00 09/12/2023
CONNECTION FEES ¤1,166.26 09/12/2023
FIRE IMPACT FEE ADMIN ¤12.62 09/12/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/12/2023
FC IMPACT FEE EMS ¤62.00 09/12/2023
IMPACT FEE FIRE ¤420.52 09/12/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/12/2023
FC IMPACT FEE LIBRARY ¤268.00 09/12/2023
IMPACT FEE PARKS ¤1,769.15 09/12/2023
IMPACT FEE SCHOOL ¤5,450.00 09/12/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 09/12/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/12/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/12/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/12/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/12/2023
SURCHARGE FS 533.721 ¤6.31 09/12/2023
SURCHARGE - FS 468.631 ¤9.47 09/12/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/12/2023
SW ENG INSPECTION 80 ¤80.00 09/12/2023
SW ENG PRE APRON ¤30.00 09/12/2023
WATER-METER ¤505.39 09/12/2023
WATER- TURN ON ¤25.00 09/12/2023
WATER- TURN ON ¤25.00 09/12/2023
ADJUSTMENT 50% (¤630.99) 09/12/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/12/2023
INSPECTION - RESIDENTIAL ¤959.75 09/12/2023
PLAN REVIEW - RESIDENTIAL ¤272.22 09/12/2023
Fees Total Due: ¤0.00 Total Paid: ¤19,878.53