Permit #2023081333
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-0820 |
| GARAGE: 816 sqft |
| GARAGE: 538 sqft |
| CONDITIONED SPACE: 3964 sqft |
| OPENED PORCH (WITH ROOF) : 685 sqft |
| OPENED PORCH (WITH ROOF) : 121 sqft |
| Total Square Footage: 6124 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: (386)445-9393 |
| Location Address: 46 SABAL BEND |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2023 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: AMARAL PAULO M & ROSELINDA R H&W |
|
Address 155 SAND SPRING RD MORRISTOWN, NJ 07960 |
| Lot: 0820 |
| Contracted Stated Job Value: ¤365,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE # 2022060241 |
| Type: CN |
| Original Permit #: 2022060241 |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/26/2025 | FINAL APPROVED | HCAMACHO |
| BLD - BUILDING FINAL | 03/25/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Need locking breakers on ovens and cooktop NEC 422.31 &110.25 2. Need GFCI in pantry, and finish triming.NEC 210.8 3. Need attic access in the house due to Spary foam. No access to the house from Garage. FBCR 807.1 4. Trim romex Wire in Lanai. NEC 110.27(A) | |||
| ROW - STORMWATER FINAL | 02/26/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: NEED TO REMOVE SILT FENCE IN THE BACK ALONG SEAWALL AND PICK UP ALL TRASH ON LOT. PASSING AS NOTED THAT THIS WILL BE TAKEN CARE OF. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/26/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 well irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 02/26/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 02/25/2025 | APPROVED | JMYERS |
| U-CROSS CONNECTION | 02/13/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irr-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/06/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THE FINAL SURVEY DOESN'T SHOW THE BERM AND DRAINAGE IN THE BACK ACROSSED THE ENTIRE BACK YARD PASSING AS NOTED THAT THE DRAINAGE WILL WORK CORRECT IN THE FIELD | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/06/2025 | APPROVED | PFLANAGAN |
| ROW - DRAINAGE | 02/06/2025 | APPROVED | PFLANAGAN |
| Note: 4/28/2023 - PREVIOUS INSPECTION NOTES ** 04/28/23 BUILDER NEEDS TO INSTALL A SILT FENCE ON LEFT SIDE FROM PROPERTY LINE TO RIGHT SIDE PROPERTY LINE ** FOLLOW UP INSPECTION 05/05/23 __________________________________________________________________________________________________________________________ rjg. Concerned residence. Please check for silt fence compliance. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/05/2024 | APPROVED | PFLANAGAN |
| Note: READY TO LAY PAVERS ------------------------------------------------------------- 10/21/2024 - PREVIOUS INSPECTION NOTES ** 10/21/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ELECTRIC - EARLY POWER | 11/05/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2200 7/18/2024 - PREVIOUS INSPECTION NOTES The Electrical riser installed does not match the electrical rise shown on the plan page E1. Please submit a revision to the building department for the change. Plans call for 300 amp service. Contractor installed. 400 amp 8-8-24 1. Emailed FPL at 9:13. | |||
| ROW- PAVER RESTRAINTS | 10/21/2024 | APPROVED | EMADISON |
| Note: ** 10/21/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 10/21/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| LATH/BRICK/ WATER BARRIER | 08/23/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/14/2024 2:51:11 PM *** 1. Please install Nail guard in laundry in left corner of washer water supply. 2. Please install nail guards at master bath shower wall for water supplys (multiple TP). 3. Please install anchors at head of front entry double door to florida product approval code. will check at insulation 7/2/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection Inspector Notes from Inspection 2460 06/18/24 Inspection administratively approved by CBO based on Architect's inspection letter. 5/20/2024 - PREVIOUS INSPECTION NOTES 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| INSULATION | 08/23/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/14/2024 2:51:11 PM *** 1. Please install Nail guard in laundry in left corner of washer water supply. 2. Please install nail guards at master bath shower wall for water supplys (multiple TP). 3. Please install anchors at head of front entry double door to florida product approval code. will check at insulation 7/2/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection Inspector Notes from Inspection 2460 06/18/24 Inspection administratively approved by CBO based on Architect's inspection letter. 5/20/2024 - PREVIOUS INSPECTION NOTES 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ALL ROUGH | 08/14/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/14/2024 2:51:11 PM *** 1. Please install Nail guard in laundry in left corner of washer water supply. 2. Please install nail guards at master bath shower wall for water supplys (multiple TP). 3. Please install anchors at head of front entry double door to florida product approval code. will check at insulation 7/2/2024 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection Inspector Notes from Inspection 2460 06/18/24 Inspection administratively approved by CBO based on Architect's inspection letter. 5/20/2024 - PREVIOUS INSPECTION NOTES 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ELECTRIC-TUG | 08/08/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7/18/2024 - PREVIOUS INSPECTION NOTES The Electrical riser installed does not match the electrical rise shown on the plan page E1. Please submit a revision to the building department for the change. Plans call for 300 amp service. Contractor installed. 400 amp 8-8-24 1. Emailed FPL at 9:13. | |||
| GRAVITY SEWER TEST | 08/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 08/08/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC-TUG | 07/18/2024 | Disapproved - NO FEE | JWALKER |
| Note: The Electrical riser installed does not match the electrical rise shown on the plan page E1. Please submit a revision to the building department for the change. Plans call for 300 amp service. Contractor installed. 400 amp | |||
| WINDOW NAILING | 07/02/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 07/02/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 06/18/24 Inspection administratively approved by CBO based on Architect's inspection letter. 5/20/2024 - PREVIOUS INSPECTION NOTES 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ALL ROUGH | 06/20/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 06/18/24 Inspection administratively approved by CBO based on Architect's inspection letter. 5/20/2024 - PREVIOUS INSPECTION NOTES 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/18/2024 | APPROVED - AS NOTED | PBUCKLEY |
| Note: 06/18/24 Inspection administratively approved by CBO based on Architect's inspection letter. 5/20/2024 - PREVIOUS INSPECTION NOTES 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ROOF VALLEY & METAL | 06/12/2024 | APPROVED | KSANDOE |
| Note: 6/11/2024 - PREVIOUS INSPECTION NOTES 6/10/2024 - PREVIOUS INSPECTION NOTES 5/20/2024 - PREVIOUS INSPECTION NOTES 4/20/24 Due to the listed item below the contractor will need to contact Robert Martin or Alpanette Waters at the building department for further instructions. 4/23/2024 - PREVIOUS INSPECTION NOTES Roof sheating was not inspected. Tile has been installed Both sides and rear. | |||
| ROOF VALLEY & METAL | 06/11/2024 | CANCELLED BY APPLICANT | JWALKER |
| Note: 6/10/2024 - PREVIOUS INSPECTION NOTES 5/20/2024 - PREVIOUS INSPECTION NOTES 4/20/24 Due to the listed item below the contractor will need to contact Robert Martin or Alpanette Waters at the building department for further instructions. 4/23/2024 - PREVIOUS INSPECTION NOTES Roof sheating was not inspected. Tile has been installed Both sides and rear. | |||
| ROOF VALLEY & METAL | 06/10/2024 | CANCELLED BY APPLICANT | JWALKER |
| Note: 5/20/2024 - PREVIOUS INSPECTION NOTES 4/20/24 Due to the listed item below the contractor will need to contact Robert Martin or Alpanette Waters at the building department for further instructions. 4/23/2024 - PREVIOUS INSPECTION NOTES Roof sheating was not inspected. Tile has been installed Both sides and rear. | |||
| ROOF VALLEY & METAL | 05/20/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 4/20/24 Due to the listed item below the contractor will need to contact Robert Martin or Alpanette Waters at the building department for further instructions. 4/23/2024 - PREVIOUS INSPECTION NOTES Roof sheating was not inspected. Tile has been installed Both sides and rear. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/20/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. The truss engineering packets provided are out of order and have gotten wet. The one packet in the job box is from 15 serpent trl. Please have a full set of approved engineered drawing onsite and in order. Ensure the cover page with the listed pages is included. 2. Items 2 and 4 listed below from the 4/23 inspection have also not been corrected. 4/23/2024 - PREVIOUS INSPECTION NOTES 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/23/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Multiple trusses are missing engineering. A01 through A27 have been inspected A06, 7, 22, 23,24,25 and 27 are missing engineering. Truss engineering inspection was stopped at the B trusses. The rest of the trusses starting at the B's still need to be inspected. 2. Max truss spacing is 2' o.c. two areas at the right side front and garage trusses have been spaced greater than 2' for the attic access. Please have the engineer submitt a detail showing the needed over framing in the two areas. 3. Multiple girder trusses call for VGT hold downs that have not been installed. locations circled on the plans. 4. Roof sheating was unable to be inspected. Roof tile has been installed. Inspection has been stopped. The contractor will need to contact the building department for further instruction on how to proceed. 12/19/2023 - PREVIOUS INSPECTION NOTES 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| ROOF VALLEY & METAL | 04/23/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Roof sheating was not inspected. Tile has been installed Both sides and rear. | |||
| ELECTRIC-TUG | 04/23/2024 | CANCELLED BY APPLICANT | JWALKER |
| ELECTRIC - EARLY POWER | 04/23/2024 | CANCELLED BY APPLICANT | JWALKER |
| WALL SHEATHING | 12/19/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/19/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 132-19-2023 1. Truss layout is not readable. Please have a readable layout on site. 2. Please provide an anchor schedule. 3. Bearing walls are not indicated. | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 12/18/2023 | APPROVED | DRODRIGUEZ |
| ELEV CERT-FOUNDATION APPROVAL | 11/27/2023 | APPROVED - AS NOTED | JMYERS |
| Note: The Foundation elevation certificate has been approved, please leave measurement boxes blank in C2 if there are no elevations moving forward. However, starting November 1st, the new form must be used. | |||
| TIE BEAM / LINTEL | 10/25/2023 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 10/09/2023 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 09/18/2023 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/25/2023 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 04/28/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/28/23 BUILDER NEEDS TO INSTALL A SILT FENCE ON LEFT SIDE FROM PROPERTY LINE TO RIGHT SIDE PROPERTY LINE ** FOLLOW UP INSPECTION 05/05/23 __________________________________________________________________________________________________________________________ rjg. Concerned residence. Please check for silt fence compliance. | |||
| RETAINING WALL | 02/06/2023 | APPROVED | AGAETANO |
| Note: 2/2/2023 - PREVIOUS INSPECTION NOTES 02-02-2023 | |||
| RETAINING WALL | 02/02/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 02-02-2023 A1 Table 1 indicates #4 rebar at 32" oc. Please install as per plans or revise to the building department. Check all retaining wall vertical rebar. | |||
| RETAINING WALL FOUNDATION | 01/13/2023 | APPROVED | AGAETANO |
| WATER METER INSTALLATION REQUEST | 10/12/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/26/2025 | 03/26/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/13/2025 | 03/13/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RENAME TO ENERGY CALCS.PDF 2. SCAN INCOMPLETE. SCANNED IN LANDSCAPE INSTEAD PORTRAIT. MISSING TOP/BOTTOM PORTIONS | |||
| MECH | COMPLETE | 03/13/2025 | 03/14/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 02/24/2025 | 02/25/2025 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| ELEC | COMPLETE | 07/30/2024 | 08/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2024 | 06/18/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM KS | |||
| BLD | COMPLETE | 03/21/2024 | 03/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/09/2023 | 10/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/09/2023 | 10/12/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved, please leave measurement boxes blank in C2 if there are no elevations moving forward. However, starting November 1st, the new form must be used. | |||
| ZON | COMPLETE | 10/09/2023 | 10/09/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 06/13/2022 | 06/13/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. However, please leave the measurement box blank if there is no elevation C2b at Foundation EC. | |||
| BLD | COMPLETE | 06/13/2022 | 06/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/13/2022 | 06/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/07/2022 | 06/08/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| PLFM | HOLD | 06/07/2022 | 06/07/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 6/6/22, the structure will fall inside of the Special Flood Hazard Area. Elevation certificates will be required at construction, foundation, and final. | |||
| PLENV | COMPLETE | 06/07/2022 | 06/09/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 6/9/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. | |||
| BLD | HOLD | 06/06/2022 | 06/09/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM All comments from FBC Residential 2020 7th edition 1. Provide product approval number for casement windows or revise plans to show single hung 2. Provide details showing casement window in Bed 3 meets egress requirements per R311.1 | |||
| CUSVC | COMPLETE | 06/06/2022 | 06/06/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/06/2022 | 06/07/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in bed 2. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 06/06/2022 | 06/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/06/2022 | 06/08/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/06/2022 | 06/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/06/2022 | 06/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/06/2022 | 06/07/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/26/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/26/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/26/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/26/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 03/26/2025 |
| SURCHARGE FS 533.721 | ¤7.42 | 08/24/2023 |
| SURCHARGE - FS 468.631 | ¤11.14 | 08/24/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/24/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/24/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/24/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/24/2023 |
| ADJUSTMENT 50% | (¤742.38) | 08/24/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/24/2023 |
| INSPECTION - RESIDENTIAL | ¤1,454.75 | 08/24/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,090.93 |