Permit #2023081550

Permit Details

Status: COED

Parcel Id: 07-11-31-7065-00550-0050
CONDITIONED SPACE: 1650 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2158 sqft
Block: 00550
Subdivision: -
Job Phone: 202-494-2019
Location Address: 54 KARAS TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/01/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: STROZIER CHRISTOPHER W & STEPHANIE H&W

Address

56 KARAS TRAIL

PALMC OAST, FL 32164

Lot: 0050
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/10/2024 FINAL APPROVED RSIMS
ROW - FINAL APRON (AFTER POUR) 05/07/2024 APPROVED - AS NOTED FSLADISH
Note: *** NOTES ADDED BY FSLADISH 5/7/2024 10:28:47 AM *** 5/7/24 PREVIOUS INSPECTION REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY PFLANAGAN 5/3/2024 10:15:48 AM *** NEED TO HAVE SAW CUTS ON DRIVEWAY ------------------------------------------------ New inspection due to canceled inspection Inspector Notes from Inspection 9465 4/25/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 05/07/2024 APPROVED - AS NOTED FSLADISH
Note: *** NOTES ADDED BY FSLADISH 5/7/2024 10:30:32 AM *** 5/7/24 REQUIRED CORRECTION FROM PREVIOUS INSPECTION COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING THIS INSPECTION AS NOTED.AS NOTED 4/29/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE A MINIMUM OF SEED AND STRAW ON ALL BARE AREAS IN THE BACK ON THE VACANT LOT BEHIND YOUR LOT.
ROW - FINAL APRON (AFTER POUR) 05/03/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: *** NOTES ADDED BY PFLANAGAN 5/3/2024 10:15:48 AM *** NEED TO HAVE SAW CUTS ON DRIVEWAY ------------------------------------------------ New inspection due to canceled inspection Inspector Notes from Inspection 9465 4/25/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
LATH/BRICK/ WATER BARRIER 05/03/2024 APPROVED BTAYLOR
Note: 2/8/2024 - PREVIOUS INSPECTION NOTES 2-8-24 1. Can not approve due to wood beams in front and rear are covered. Need to see beams to be sure they are secured properly.
ROW - FINAL APRON (AFTER POUR) 04/29/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 9465 4/25/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U-CROSS CONNECTION 04/29/2024 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U -UTILITY RESIDENTIAL FINAL 04/29/2024 APPROVED - AS NOTED JHARDING
Note: Must cut sewer clean out down and install cleanout cap.
ROW - STORMWATER FINAL 04/29/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE A MINIMUM OF SEED AND STRAW ON ALL BARE AREAS IN THE BACK ON THE VACANT LOT BEHIND YOUR LOT.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/25/2024 APPROVED - AS NOTED FSLADISH
Note: 4/25/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/24/2024 APPROVED FSLADISH
U - SEWER TIE IN 04/01/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 04/01/2024 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 03/15/2024 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 03/12/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 2/2/24: FPL emailed to release power at @ 13:15. 3-12-24 1. Emailed FPL at 11:27.
PEP TANK INSTALLATION REQUEST 02/28/2024 APPROVED CBOWERMASTER
INSULATION 02/16/2024 APPROVED BTAYLOR
ALL ROUGH 02/14/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/14/2024 APPROVED BTAYLOR
Note: 2/8/2024 - PREVIOUS INSPECTION NOTES 1/25/2024 - PREVIOUS INSPECTION NOTES 1/25/24: * Roof sheathing - bump checked / Tie Down / Down Cell checked & Approved. * Will need revision submitted to & approved by the City for the different truss layout than what MiTek plan shows. Bracing/Engineering part stopped. 2-8-24 1. Need to add second strap to double trusses without. 2. Missing engineering. Circled in engineering packet. 3. need to uncover beams so connections can be seen.
LATH/BRICK/ WATER BARRIER 02/08/2024 Disapproved - NO FEE BTAYLOR
Note: 2-8-24 1. Can not approve due to wood beams in front and rear are covered. Need to see beams to be sure they are secured properly.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/08/2024 Disapproved - NO FEE BTAYLOR
Note: 1/25/2024 - PREVIOUS INSPECTION NOTES 1/25/24: * Roof sheathing - bump checked / Tie Down / Down Cell checked & Approved. * Will need revision submitted to & approved by the City for the different truss layout than what MiTek plan shows. Bracing/Engineering part stopped. 2-8-24 1. Need to add second strap to double trusses without. 2. Missing engineering. Circled in engineering packet. 3. need to uncover beams so connections can be seen.
ROOF VALLEY & METAL 02/06/2024 APPROVED BTAYLOR
ELECTRIC-TUG 02/02/2024 APPROVED - AS NOTED RSIMS
Note: 2/2/24: FPL emailed to release power at @ 13:15.
WALL SHEATHING 01/25/2024 APPROVED RSIMS
WALL SHEATHING 01/25/2024 CANCELLED BY INSPECTOR RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/25/2024 Disapproved - NO FEE RSIMS
Note: 1/25/24: * Roof sheathing - bump checked / Tie Down / Down Cell checked & Approved. * Will need revision submitted to & approved by the City for the different truss layout than what MiTek plan shows. Bracing/Engineering part stopped.
FOUND SURVEY APPROVED (OFFICE) 01/19/2024 APPROVED TBAKER
TIE BEAM / LINTEL 01/16/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 12/19/2023 APPROVED RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 12/14/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/22/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 04/11/2024 04/12/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/19/2024 01/19/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/19/2024 01/19/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
CUSVC COMPLETE 01/04/2024 01/09/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
SW1 COMPLETE 01/04/2024 01/11/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 01/04/2024 01/04/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 09/25/2023 09/25/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/25/2023 09/25/2023
Note: Released By: JPI
BLD COMPLETE 09/05/2023 09/05/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 08/31/2023 10/19/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 08/29/2023 08/30/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 08/29/2023 09/01/2023
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 08/29/2023 09/05/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/29/2023 08/31/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/29/2023 09/05/2023
LOCATE COMPLETE 08/29/2023 09/05/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/29/2023 09/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/29/2023 09/07/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 08/29/2023 08/31/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation plan Please add banding to the Garage
BADMIN COMPLETE 08/29/2023 09/05/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 05/06/2024
SW ENG REINSPECTION 20 ¤20.00 05/01/2024
PLAN REVIEW - REVISION ¤32.50 05/01/2024
CONNECTION FEES ¤1,166.26 11/01/2023
FIRE IMPACT FEE ADMIN ¤12.62 11/01/2023
FIRE IMPACT FEE ADMIN (¤12.62) 11/01/2023
FC IMPACT FEE EMS ¤62.00 11/01/2023
IMPACT FEE FIRE ¤420.52 11/01/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/01/2023
FC IMPACT FEE LIBRARY ¤268.00 11/01/2023
IMPACT FEE PARKS ¤1,769.15 11/01/2023
IMPACT FEE SCHOOL ¤5,450.00 11/01/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 11/01/2023
WATER -IRRIGATION INSPECTION ¤25.00 11/01/2023
PARKS IMPACT FEE ADMIN ¤53.07 11/01/2023
PARKS IMPACT FEE ADMIN (¤53.07) 11/01/2023
SURCHARGE FS 533.721 ¤3.75 11/01/2023
SURCHARGE - FS 468.631 ¤5.63 11/01/2023
SW ENG - FOUNDATION SURVEY ¤20.00 11/01/2023
SW ENG INSPECTION 80 ¤80.00 11/01/2023
SW ENG PRE APRON ¤30.00 11/01/2023
WATER- TURN ON ¤25.00 11/01/2023
ADJUSTMENT 50% (¤375.06) 11/01/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/01/2023
INSPECTION - RESIDENTIAL ¤561.00 11/01/2023
PLAN REVIEW - RESIDENTIAL ¤159.12 11/01/2023
SW ENG - REVIEW 20 ¤20.00 11/01/2023
SW ENG RES REVIEW 200 ¤200.00 11/01/2023
TRANS IMPACT FEE ADMIN ¤54.36 11/01/2023
TRANS IMPACT FEE ADMIN (¤54.36) 11/01/2023
SEWER CREDIT (¤1,070.49) 11/01/2023
SEWER INSPECTION ¤25.00 11/01/2023
SEWER CAPITAL FACILITY ¤5,344.82 11/01/2023
WATER CREDIT (¤179.66) 11/01/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 11/01/2023
SITE PLAN 30 ¤30.00 11/01/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,096.42