I want to search for...
Permit #2023081552
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00210-0020 |
| CONDITIONED SPACE: 1903 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2590 sqft |
| Block: 00210 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 202-494-2019 |
| Location Address: 18 ZINNIA CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/01/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BLVD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 07/15/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR. No CC | |||
| BLD - BUILDING FINAL | 07/12/2024 | FINAL APPROVED | KSANDOE |
| ROW - FINAL APRON (AFTER POUR) | 07/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/12/24 PIPE ELEVATION IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/11/24 UPON WALKING PROPERTY DETERMINED THAT YOUR DRAINAGE PATTERN IS ACCURATELY DEPICTED ON YOUR FINAL SURVEY. PASSING THIS FIELD INSPECTION AS NOTED. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 7/11/24 WHILE YOUR SURVEY DOES MATCH YOUR LATEST REVISED SITE PLAN, DUE TO THE COPC APPROVING YOUR SITE PLAN AND THE FACT THAT THE REAR ADJOING PROPERTY IS A RESERVED PARCEL WE ARE APPROVING YOUR FINAL SURVEY DRAINAGE AS NOTED. Inspector Notes from Inspection 9270 6/12/25 AFTER DISCUSSION WITH TIM DETERMINED WE WERE TO USE THE BM TO SHOOT THE PIPE NO WORRIE ABOUT IT MATCHING THE CL ON SWALE PLAN. PIPE ELEVATION IS IN TOLERANCE TO THE BM AT THIS INSPECTION. APPROVING AS NOTED BASED ON MY DISCUSSION WITH TIM. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. INSPECTORS NOTE PER GABE WE ARE ALLOWING 5' ON LEFT SIDE CULVERT PIPE AND 8' ON RIGHT SIDE CULVERT DUE TO SITE SPECIFIC CONDITIONS.. 6/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RGROSS 6/3/2024 9:26:13 AM *** This inspection was canceled by Robert Gross because the BM does not match the centerline of the road. Also the BM was moved on the pole but not by the Surveyor. Any questions call Tim Baker. Do not inpsect this culvert until verification that the BM was reestablished by the Surveyor and matches the centerline. 5/31/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW - STORMWATER FINAL | 07/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/12/24 SEE PREVIOUS FINAL SURVEY INSPECTION NOTES. DRAINAGE PATTERN ALLOWED DUE TO COPC REVISED SITE PLAN APPROVAL AND SITE SPECIFIC CONDITIONS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. APPROVING THIS INSPECTION AS NOTED. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/11/24 UPON WALKING PROPERTY DETERMINED THAT YOUR DRAINAGE PATTERN IS ACCURATELY DEPICTED ON YOUR FINAL SURVEY. PASSING THIS FIELD INSPECTION AS NOTED. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 7/11/24 WHILE YOUR SURVEY DOES MATCH YOUR LATEST REVISED SITE PLAN, DUE TO THE COPC APPROVING YOUR SITE PLAN AND THE FACT THAT THE REAR ADJOING PROPERTY IS A RESERVED PARCEL WE ARE APPROVING YOUR FINAL SURVEY DRAINAGE AS NOTED. Inspector Notes from Inspection 9270 6/12/25 AFTER DISCUSSION WITH TIM DETERMINED WE WERE TO USE THE BM TO SHOOT THE PIPE NO WORRIE ABOUT IT MATCHING THE CL ON SWALE PLAN. PIPE ELEVATION IS IN TOLERANCE TO THE BM AT THIS INSPECTION. APPROVING AS NOTED BASED ON MY DISCUSSION WITH TIM. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. INSPECTORS NOTE PER GABE WE ARE ALLOWING 5' ON LEFT SIDE CULVERT PIPE AND 8' ON RIGHT SIDE CULVERT DUE TO SITE SPECIFIC CONDITIONS.. 6/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RGROSS 6/3/2024 9:26:13 AM *** This inspection was canceled by Robert Gross because the BM does not match the centerline of the road. Also the BM was moved on the pole but not by the Surveyor. Any questions call Tim Baker. Do not inpsect this culvert until verification that the BM was reestablished by the Surveyor and matches the centerline. 5/31/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/12/2024 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/11/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/11/24 WHILE YOUR SURVEY DOES MATCH YOUR LATEST REVISED SITE PLAN, DUE TO THE COPC APPROVING YOUR SITE PLAN AND THE FACT THAT THE REAR ADJOING PROPERTY IS A RESERVED PARCEL WE ARE APPROVING YOUR FINAL SURVEY DRAINAGE AS NOTED. Inspector Notes from Inspection 9270 6/12/25 AFTER DISCUSSION WITH TIM DETERMINED WE WERE TO USE THE BM TO SHOOT THE PIPE NO WORRIE ABOUT IT MATCHING THE CL ON SWALE PLAN. PIPE ELEVATION IS IN TOLERANCE TO THE BM AT THIS INSPECTION. APPROVING AS NOTED BASED ON MY DISCUSSION WITH TIM. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. INSPECTORS NOTE PER GABE WE ARE ALLOWING 5' ON LEFT SIDE CULVERT PIPE AND 8' ON RIGHT SIDE CULVERT DUE TO SITE SPECIFIC CONDITIONS.. 6/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RGROSS 6/3/2024 9:26:13 AM *** This inspection was canceled by Robert Gross because the BM does not match the centerline of the road. Also the BM was moved on the pole but not by the Surveyor. Any questions call Tim Baker. Do not inpsect this culvert until verification that the BM was reestablished by the Surveyor and matches the centerline. 5/31/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/11/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/11/24 UPON WALKING PROPERTY DETERMINED THAT YOUR DRAINAGE PATTERN IS ACCURATELY DEPICTED ON YOUR FINAL SURVEY. PASSING THIS FIELD INSPECTION AS NOTED. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 7/11/24 WHILE YOUR SURVEY DOES MATCH YOUR LATEST REVISED SITE PLAN, DUE TO THE COPC APPROVING YOUR SITE PLAN AND THE FACT THAT THE REAR ADJOING PROPERTY IS A RESERVED PARCEL WE ARE APPROVING YOUR FINAL SURVEY DRAINAGE AS NOTED. Inspector Notes from Inspection 9270 6/12/25 AFTER DISCUSSION WITH TIM DETERMINED WE WERE TO USE THE BM TO SHOOT THE PIPE NO WORRIE ABOUT IT MATCHING THE CL ON SWALE PLAN. PIPE ELEVATION IS IN TOLERANCE TO THE BM AT THIS INSPECTION. APPROVING AS NOTED BASED ON MY DISCUSSION WITH TIM. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. INSPECTORS NOTE PER GABE WE ARE ALLOWING 5' ON LEFT SIDE CULVERT PIPE AND 8' ON RIGHT SIDE CULVERT DUE TO SITE SPECIFIC CONDITIONS.. 6/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RGROSS 6/3/2024 9:26:13 AM *** This inspection was canceled by Robert Gross because the BM does not match the centerline of the road. Also the BM was moved on the pole but not by the Surveyor. Any questions call Tim Baker. Do not inpsect this culvert until verification that the BM was reestablished by the Surveyor and matches the centerline. 5/31/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/12/25 AFTER DISCUSSION WITH TIM DETERMINED WE WERE TO USE THE BM TO SHOOT THE PIPE NO WORRIE ABOUT IT MATCHING THE CL ON SWALE PLAN. PIPE ELEVATION IS IN TOLERANCE TO THE BM AT THIS INSPECTION. APPROVING AS NOTED BASED ON MY DISCUSSION WITH TIM. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. INSPECTORS NOTE PER GABE WE ARE ALLOWING 5' ON LEFT SIDE CULVERT PIPE AND 8' ON RIGHT SIDE CULVERT DUE TO SITE SPECIFIC CONDITIONS.. 6/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RGROSS 6/3/2024 9:26:13 AM *** This inspection was canceled by Robert Gross because the BM does not match the centerline of the road. Also the BM was moved on the pole but not by the Surveyor. Any questions call Tim Baker. Do not inpsect this culvert until verification that the BM was reestablished by the Surveyor and matches the centerline. 5/31/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/04/2024 | CANCELLED BY APPLICANT | RGROSS |
| Note: *** NOTES ADDED BY RGROSS 6/3/2024 9:26:13 AM *** This inspection was canceled by Robert Gross because the BM does not match the centerline of the road. Also the BM was moved on the pole but not by the Surveyor. Any questions call Tim Baker. Do not inpsect this culvert until verification that the BM was reestablished by the Surveyor and matches the centerline. 5/31/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/31/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE BENCHMARK DOESN'T MATCH THE CENTERLINE ELEVATION OF THE SWALE PLAN DETAIL. NEED TO GET YOUR SURVEYOR TO RE-ESTABLISH THE BENCHMARK TO MATCH THE SWALE PLAN DETAIL AND YOUR SITE PLAN. THE NEW BENCHMARK IS MAKING YOUR CULVERT OUT OF TOLERANCE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| U-CROSS CONNECTION | 05/31/2024 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 05/21/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 05/21/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 05/14/2024 | APPROVED | CBOWERMASTER |
| ELECTRIC - EARLY POWER | 05/13/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 2/27/24: FPL emailed - Approved for TUG. 5-13-24 1. Emailed FPL at 12:09. | |||
| PEP TANK INSTALLATION REQUEST | 05/02/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 04/26/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2490 4/18/24: Approved as noted to keep project moving. Must be complete prior to Early Power Inspection. Previously listed item 3 for the different windows from All Rough Inspection still needs to be resolved. Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). Wire for AHU is not phased out as required. 2). Hole in Slab at kitchen Island needs to be repaired with cement. 3). Need a revision for the different windows (Ply-Gem 16103) installed than what was originally submitted & approved on the Florida Product Approval document. 4). Please fill the bathtub to the overflow to test overflow piping. Inspector Notes from Inspection 2460 4/9/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Revision for tie downs at entry checked & approved. Still missing the required straps at the inside corners as required on engineer's revision. Also, still missing hold downs from the stud wall to blocking between trusses like any typical overvalley framing. ** These two items were explained in detail to the framer on 4/1/24. 4/1/2024 - PREVIOUS INSPECTION NOTES 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). Wire for AHU is not phased out as required. 2). Hole in Slab at kitchen Island needs to be repaired with cement. 3). Need a revision for the different windows (Ply-Gem 16103) installed than what was originally submitted & approved on the Florida Product Approval document. 4). Please fill the bathtub to the overflow to test overflow piping. Inspector Notes from Inspection 2460 4/9/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Revision for tie downs at entry checked & approved. Still missing the required straps at the inside corners as required on engineer's revision. Also, still missing hold downs from the stud wall to blocking between trusses like any typical overvalley framing. ** These two items were explained in detail to the framer on 4/1/24. 4/1/2024 - PREVIOUS INSPECTION NOTES 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| INSULATION | 04/18/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/18/24: Approved as noted to keep project moving. Must be complete prior to Early Power Inspection. Previously listed item 3 for the different windows from All Rough Inspection still needs to be resolved. Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). Wire for AHU is not phased out as required. 2). Hole in Slab at kitchen Island needs to be repaired with cement. 3). Need a revision for the different windows (Ply-Gem 16103) installed than what was originally submitted & approved on the Florida Product Approval document. 4). Please fill the bathtub to the overflow to test overflow piping. Inspector Notes from Inspection 2460 4/9/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Revision for tie downs at entry checked & approved. Still missing the required straps at the inside corners as required on engineer's revision. Also, still missing hold downs from the stud wall to blocking between trusses like any typical overvalley framing. ** These two items were explained in detail to the framer on 4/1/24. 4/1/2024 - PREVIOUS INSPECTION NOTES 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. Inspector Notes from Inspection 2420 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). Wire for AHU is not phased out as required. 2). Hole in Slab at kitchen Island needs to be repaired with cement. 3). Need a revision for the different windows (Ply-Gem 16103) installed than what was originally submitted & approved on the Florida Product Approval document. 4). Please fill the bathtub to the overflow to test overflow piping. Inspector Notes from Inspection 2460 4/9/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Revision for tie downs at entry checked & approved. Still missing the required straps at the inside corners as required on engineer's revision. Also, still missing hold downs from the stud wall to blocking between trusses like any typical overvalley framing. ** These two items were explained in detail to the framer on 4/1/24. 4/1/2024 - PREVIOUS INSPECTION NOTES 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| ALL ROUGH | 04/15/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/15/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Check at next inspection. 1). Wire for AHU is not phased out as required. 2). Hole in Slab at kitchen Island needs to be repaired with cement. 3). Need a revision for the different windows (Ply-Gem 16103) installed than what was originally submitted & approved on the Florida Product Approval document. 4). Please fill the bathtub to the overflow to test overflow piping. Inspector Notes from Inspection 2460 4/9/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Revision for tie downs at entry checked & approved. Still missing the required straps at the inside corners as required on engineer's revision. Also, still missing hold downs from the stud wall to blocking between trusses like any typical overvalley framing. ** These two items were explained in detail to the framer on 4/1/24. 4/1/2024 - PREVIOUS INSPECTION NOTES 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/9/24: Approved as noted to keep project moving. Must be complete prior to next inspection. Revision for tie downs at entry checked & approved. Still missing the required straps at the inside corners as required on engineer's revision. Also, still missing hold downs from the stud wall to blocking between trusses like any typical overvalley framing. ** These two items were explained in detail to the framer on 4/1/24. 4/1/2024 - PREVIOUS INSPECTION NOTES 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/01/2024 | CANCELLED BY APPLICANT | RSIMS |
| Note: 4/1/24: Cancelled by Applicant verbally. Contractor will submit a new revision for the different straps/tie down used at entry. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/27/24: Previous deficiencies remain unresolved. Also, Please repair your silt fence barrier as soon as possible & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. 3/18/2024 - PREVIOUS INSPECTION NOTES 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| ROOF VALLEY & METAL | 03/18/2024 | APPROVED | RSIMS |
| Note: 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24: Must have an Approved Inspection 2460 (RS/B/T/DC) prior to this inspection. | |||
| WALL SHEATHING | 03/18/2024 | APPROVED | RSIMS |
| Note: 2/23/2024 - PREVIOUS INSPECTION NOTES 2/23/24: Must have an Approved Inspection 2460 (RS/B/T/DC) prior to this inspection due to the details of the deficiencies concerning the entry. Also, wall sheathing is incomplete. 2/22/2024 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/18/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/18/24: 1). Front porch area is not installed per revision requirements. Missing straps in the corner. Wrong straps used from Truss to header tie down. Missing tie downs/straps for conventionally framed rafters/wall on right side overvalley. 2/22/2024 - PREVIOUS INSPECTION NOTES 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| ELECTRIC-TUG | 02/27/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 2/27/24: FPL emailed - Approved for TUG. | |||
| WALL SHEATHING | 02/23/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/23/24: Must have an Approved Inspection 2460 (RS/B/T/DC) prior to this inspection due to the details of the deficiencies concerning the entry. Also, wall sheathing is incomplete. 2/22/2024 - PREVIOUS INSPECTION NOTES | |||
| ROOF VALLEY & METAL | 02/23/2024 | Disapproved - NO FEE | RSIMS |
| Note: 2/23/24: Must have an Approved Inspection 2460 (RS/B/T/DC) prior to this inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/22/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-22-24 1. Front porch is built wrong. Either need to take apart and add another corse of block or have engineer write a letter stating construction is good. 2. Wrong straps are used for porch trusses. | |||
| WALL SHEATHING | 02/22/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 02/20/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/08/2024 | APPROVED | BTAYLOR |
| Note: 2/7/2024 - PREVIOUS INSPECTION NOTES 2/7/24: 1). Missing down rod & dowel (or it is not exposed) at front left column. Marked on plan. 2). Window sill mortar beds exceed the 1/2" maximum thickness per FBC-R606.3.1. Highlighted on plans. | |||
| TIE BEAM / LINTEL | 02/07/2024 | Disapproved - NO FEE | RSIMS |
| Note: 2/7/24: 1). Missing down rod & dowel (or it is not exposed) at front left column. Marked on plan. 2). Window sill mortar beds exceed the 1/2" maximum thickness per FBC-R606.3.1. Highlighted on plans. | |||
| MONOLITHIC SLAB | 01/29/2024 | APPROVED | RSIMS |
| Note: 1/26/2024 - PREVIOUS INSPECTION NOTES 1/26/24: INSPECTION STOPPED! No termite bond in permit box or on-site. | |||
| MONOLITHIC SLAB | 01/26/2024 | Disapproved - NO FEE | RSIMS |
| Note: 1/26/24: INSPECTION STOPPED! No termite bond in permit box or on-site. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/19/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/05/2024 | APPROVED | TCHURCHILL |
| WILDLIFE CHECK - ENVIRONMENTAL | 12/05/2023 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/24/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2024 | 06/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/07/2024 | 06/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Permit is on HOLD until COPC gets verification of benchmark elevation. | |||
| SW1 | COMPLETE | 06/07/2024 | 06/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 approval valid with the following notes: Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lids/covers SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | HOLD | 05/31/2024 | 06/03/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Permit is on HOLD until COPC gets verification of benchmark elevation. | |||
| SW1 | HOLD | 05/31/2024 | 06/06/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Northwest corner of lot, adjacent to rear corner of lot 3 - a few proposed elevations appear to be a typo marked '29.90' and '29.80'. Please revise | |||
| ZON | COMPLETE | 05/31/2024 | 05/31/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/02/2024 | 04/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/02/2024 | 04/02/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/08/2024 | 03/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/15/2024 | 02/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/15/2024 | 02/15/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/29/2024 | 01/29/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 01/29/2024 | 01/29/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/26/2024 | 01/26/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT FOUNDATION SURVEY, NOT FORMBOARD | |||
| BLD | COMPLETE | 01/26/2024 | 01/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 12/05/2023 | 12/05/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM The provided document appears to meet the requirement for avoiding impact within 25 feet of the Gopher Tortoise burrow located on site. If any future impacts were to encroach this 25 feet buffer from the burrow, further coordination may be needed. | |||
| ZON | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2023 | 11/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/15/2023 | 11/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | HOLD | 11/15/2023 | 11/16/2023 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 11/16/23 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| SWALE | COMPLETE | 08/31/2023 | 10/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/29/2023 | 09/05/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/29/2023 | 08/30/2023 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 08/29/2023 | 09/05/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/29/2023 | 08/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/29/2023 | 09/05/2023 |
| LOCATE | COMPLETE | 08/29/2023 | 09/05/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/29/2023 | 09/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/29/2023 | 09/07/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/29/2023 | 08/31/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/01/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/01/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/01/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 11/01/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 11/01/2023 |
| SEWER CREDIT | (¤850.00) | 11/01/2023 |
| SEWER INSPECTION | ¤25.00 | 11/01/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/01/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/01/2023 |
| SITE PLAN 30 | ¤30.00 | 11/01/2023 |
| WATER- TURN ON | ¤25.00 | 11/01/2023 |
| ADJUSTMENT 50% | (¤436.84) | 11/01/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/01/2023 |
| INSPECTION - RESIDENTIAL | ¤657.25 | 11/01/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤186.42 | 11/01/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/01/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 11/01/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 11/01/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/01/2023 |
| IMPACT FEE FIRE | ¤420.52 | 11/01/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/01/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/01/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 11/01/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/01/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/01/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/01/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 11/01/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 11/01/2023 |
| SURCHARGE FS 533.721 | ¤4.37 | 11/01/2023 |
| SURCHARGE - FS 468.631 | ¤6.55 | 11/01/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/01/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/01/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/01/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,669.88 |