Status: COED

Parcel Id: 42-10-30-3210-00000-0250
CONDITIONED SPACE: 2753 sqft
GARAGE: 702 sqft
OPENED PORCH (WITH ROOF) : 477 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
Total Square Footage: 3986 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-236-4133
Location Address: 239 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/06/2023
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 0250
Contracted Stated Job Value: ¤337,070.00
Job Description: Single family residence
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
HUGH MACDONALD
Status Location Address State License Number
INACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2024)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/10/2024 FINAL APPROVED JWALKER
Note: 4/9/2024 - PREVIOUS INSPECTION NOTES 1. Front right side bath the hot / cold is reversed at the shower 2. Seal the capped off plumbing pipes running through the garage wall. 3. left side garage door is not operating, unable to check safety reverse.
BLD - BUILDING FINAL 04/09/2024 Disapproved - NO FEE JWALKER
Note: 1. Front right side bath the hot / cold is reversed at the shower 2. Seal the capped off plumbing pipes running through the garage wall. 3. left side garage door is not operating, unable to check safety reverse.
U-CROSS CONNECTION 04/08/2024 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 04/08/2024 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/05/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 04/05/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 04/05/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 04/05/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/02/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) ALL ELEVATION AGAINST THE STRUCTURE NEED TO 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 2) NEED MORE ELEVATIONS IN THE BACK YARD PER Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern.
ELECTRIC - EARLY POWER 03/26/2024 APPROVED - AS NOTED RMARTIN
Note: 3/25/24 Did a reinspection vertual to check this inspection with super 3/25/2024 - PREVIOUS INSPECTION NOTES front guest bedroom closet outlet not safed off
ELECTRIC - EARLY POWER 03/25/2024 Disapproved - NO FEE RMARTIN
Note: front guest bedroom closet outlet not safed off
ROW- PRE-APRON (PRE-POUR) 03/06/2024 APPROVED - AS NOTED FSLADISH
Note: 3/6/24 YOU ARE READY TO LAY PAVERS AT THIS TIME. PAVER BASE SPREAD AND COMPACTION MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 02/27/24 APRON READY TO POUR WITH PAVER RESTRAINT **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PAVER RESTRAINTS 02/27/2024 APPROVED - AS NOTED EMADISON
Note: ** 02/27/24 APRON READY TO POUR WITH PAVER RESTRAINT **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 02/27/2024 PARTIALLY APPROVED EMADISON
Note: ** 02/27/24 APRON READY TO POUR WITH PAVER RESTRAINT ** READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
U - SEWER TIE IN 02/15/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 02/15/2024 APPROVED MGIBSON
INSULATION 02/06/2024 APPROVED AGAETANO
ALL ROUGH 02/01/2024 APPROVED AGAETANO
ELECTRIC-TUG 02/01/2024 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 01/31/2024 APPROVED AGAETANO
WALL SHEATHING 01/24/2024 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/18/2024 APPROVED FWILLIS
ROOF VALLEY & METAL 01/17/2024 APPROVED AGAETANO
ROOF SHEATHING 01/12/2024 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/12/2024 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 12/22/2023 APPROVED AGAETANO
Note: 12/21/2023 - PREVIOUS INSPECTION NOTES 12-21-2023 Clearance not met at rebar. Locations highlighted on drawings.
TIE BEAM / LINTEL 12/21/2023 Disapproved - NO FEE AGAETANO
Note: 12-21-2023 Clearance not met at rebar. Locations highlighted on drawings.
FOUND SURVEY APPROVED (OFFICE) 12/18/2023 APPROVED TBAKER
MONOLITHIC SLAB 12/08/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 12/08/2023 APPROVED BVITALE
Note: installed 11/17/23
PLUMBING 1ST ROUGH UNDERGROUND 12/05/2023 APPROVED LMILLER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/28/2024 02/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/28/2024 03/05/2024
Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 02/28/2024 02/28/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/15/2023 12/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/15/2023 12/18/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 10/29/2023 10/30/2023
Note: Released By: JPI
BLD HOLD 10/16/2023 10/16/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
SW1 COMPLETE 10/16/2023 10/24/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ELEC COMPLETE 10/16/2023 10/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 09/14/2023 09/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 09/01/2023 09/07/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. hour not approved
CUSVC COMPLETE 09/01/2023 09/06/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/01/2023 09/08/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/01/2023 09/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/01/2023 09/06/2023
LOCATE COMPLETE 09/01/2023 09/05/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/01/2023 09/06/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 HOLD 09/01/2023 09/12/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE PROPOSED ELEVATIONS AT THE HIGH POINT ON THE SIDE LOT LINE
ZON COMPLETE 09/01/2023 09/01/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 09/01/2023 09/06/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN COMPLETE 09/01/2023 09/08/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 11/06/2023
ADJUSTMENT 50% (¤666.29) 11/06/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/06/2023
INSPECTION - RESIDENTIAL ¤1,014.75 11/06/2023
PLAN REVIEW - RESIDENTIAL ¤287.82 11/06/2023
CONNECTION FEES ¤25.00 11/06/2023
FC IMPACT FEE EMS ¤62.00 11/06/2023
IMPACT FEE FIRE ¤428.09 11/06/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/06/2023
FC IMPACT FEE LIBRARY ¤268.00 11/06/2023
IMPACT FEE PARKS ¤1,800.99 11/06/2023
IMPACT FEE SCHOOL ¤5,450.00 11/06/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 11/06/2023
SURCHARGE FS 533.721 ¤6.66 11/06/2023
SURCHARGE - FS 468.631 ¤9.99 11/06/2023
SW ENG - FOUNDATION SURVEY ¤20.00 11/06/2023
SW ENG INSPECTION 80 ¤80.00 11/06/2023
SW ENG PRE APRON ¤30.00 11/06/2023
SW ENG - REVIEW 20 ¤20.00 11/06/2023
SW ENG RES REVIEW 200 ¤200.00 11/06/2023
SEWER INSPECTION ¤25.00 11/06/2023
SITE PLAN 30 ¤30.00 11/06/2023
Fees Total Due: ¤0.00 Total Paid: ¤13,156.40