Permit #2023090183
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00680-0020 |
| CONDITIONED SPACE: 2622 sqft |
| GARAGE: 1084 sqft |
| OPENED PORCH (WITH ROOF) : 432 sqft |
| Total Square Footage: 4138 sqft |
| Block: 00680 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-585-2654 |
| Location Address: 86 LARAMIE DR |
| Type: DU - DUPLEX |
| Issue Date: 10/02/2023 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: CARLOS DIAZ FLORES AND YAQUELIN SALAZAR |
|
Address 16 RIVERINA DRIVE PALM COAST, FL 32137 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/15/2025 | FINAL APPROVED | JSTEWART |
| Note: 4/11/2025 - PREVIOUS INSPECTION NOTES 4/8/2025 - PREVIOUS INSPECTION NOTES Both Sides: 1. No energy calcs onsite. FBC [A] 107.4 2. Bath Exhaust termination in back of units require 36" clearence from operable windows. 3. J box in garages need a cover. 4. Seal all Holes in garage ceiling. R402 5. No Insulation cert posted at attic. FBC EC R303.1.1.2 6. Seal dryer ducts for future use (unless dryer is installed) FBC M1502.4.7 7. Pep system requires GFCI Protection. NEC 422.5(A)(6 8. Spare bath Lav's not functioning (No water). FBCR P2705.1 – 4 9. spare bath tub spout needs sealed to wall. 10 Master exhaust fans our not working. FBC R303.3 11. Master Lav drain stops need adjusted to drain properly. FBCR P2705.1 – 4 Side A : Attic access needs a light bulb. Side B : Garage door saftey devices need to be max 6" off floor. per UL 325 Outlet for countertop work space is required to be 12" from top of counter (bottom of the receptacle). | |||
| BLD - BUILDING FINAL | 04/11/2025 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 4/8/2025 - PREVIOUS INSPECTION NOTES Both Sides: 1. No energy calcs onsite. FBC [A] 107.4 2. Bath Exhaust termination in back of units require 36" clearence from operable windows. 3. J box in garages need a cover. 4. Seal all Holes in garage ceiling. R402 5. No Insulation cert posted at attic. FBC EC R303.1.1.2 6. Seal dryer ducts for future use (unless dryer is installed) FBC M1502.4.7 7. Pep system requires GFCI Protection. NEC 422.5(A)(6 8. Spare bath Lav's not functioning (No water). FBCR P2705.1 – 4 9. spare bath tub spout needs sealed to wall. 10 Master exhaust fans our not working. FBC R303.3 11. Master Lav drain stops need adjusted to drain properly. FBCR P2705.1 – 4 Side A : Attic access needs a light bulb. Side B : Garage door saftey devices need to be max 6" off floor. per UL 325 Outlet for countertop work space is required to be 12" from top of counter (bottom of the receptacle). | |||
| BLD - BUILDING FINAL | 04/08/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Both Sides: 1. No energy calcs onsite. FBC [A] 107.4 2. Bath Exhaust termination in back of units require 36" clearence from operable windows. 3. J box in garages need a cover. 4. Seal all Holes in garage ceiling. R402 5. No Insulation cert posted at attic. FBC EC R303.1.1.2 6. Seal dryer ducts for future use (unless dryer is installed) FBC M1502.4.7 7. Pep system requires GFCI Protection. NEC 422.5(A)(6 8. Spare bath Lav's not functioning (No water). FBCR P2705.1 – 4 9. spare bath tub spout needs sealed to wall. 10 Master exhaust fans our not working. FBC R303.3 11. Master Lav drain stops need adjusted to drain properly. FBCR P2705.1 – 4 Side A : Attic access needs a light bulb. Side B : Garage door saftey devices need to be max 6" off floor. per UL 325 Outlet for countertop work space is required to be 12" from top of counter (bottom of the receptacle). | |||
| ROW - FINAL INSPECTION | 04/08/2025 | APPROVED | FSLADISH |
| Note: 4/8/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _________________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO CLEAN ALL DIRT FROM CULVERT PIPES. 2) NEED TO STILL REMOVE ALL ROCKS AND BEDS FROM DRAINAG PATTERNS. 3) NEED TO REMOVE ALL CORNCRETE AND CONSTRUCTION DEBRIS. -------------------------------------------------------------------------------- 2/11/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL ROCKS AND BUSHES FROM THE DRAINAGE PATTERN ON THE RIGHT. Sec 300.03 C-G. NO trees or clusters of vegetation that would restrict flow along the sidelines to the front swale, drainage ditch, or other drainage conveyance. 2) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 3) NEED TO SEED STRAW ALL BARE AREAS IN THE VACANT TO THE LEFT OF THIS LOT. Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. ------------------------------------------------------------------------------------------ Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage ----------------------------------------------------------------------------- ** 12/18/24 NEED TO CLEAN CULVERT PIPES OF SEDIMENT AND OVER POUR ** CLEAN ALL TRASH AND CONSTRUCTION DEBRIS IN VACANT AND JOB SITE ** REPAIR ROAD SIDE SWALE IN FRONT OF VACANT WILL NEED TO SOD MATCH EXISTING GRADE ** THERE MAYBE OTHER ISSUES NOT NOTED BUILDERS RESPONSIBILITY TO ENSURE SITE IS READY FOR FINAL INSPECTIONS | |||
| ROW - FINAL INSPECTION | 03/05/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO CLEAN ALL DIRT FROM CULVERT PIPES. 2) NEED TO STILL REMOVE ALL ROCKS AND BEDS FROM DRAINAG PATTERNS. 3) NEED TO REMOVE ALL CORNCRETE AND CONSTRUCTION DEBRIS. -------------------------------------------------------------------------------- 2/11/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL ROCKS AND BUSHES FROM THE DRAINAGE PATTERN ON THE RIGHT. Sec 300.03 C-G. NO trees or clusters of vegetation that would restrict flow along the sidelines to the front swale, drainage ditch, or other drainage conveyance. 2) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 3) NEED TO SEED STRAW ALL BARE AREAS IN THE VACANT TO THE LEFT OF THIS LOT. Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. ------------------------------------------------------------------------------------------ Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage ----------------------------------------------------------------------------- ** 12/18/24 NEED TO CLEAN CULVERT PIPES OF SEDIMENT AND OVER POUR ** CLEAN ALL TRASH AND CONSTRUCTION DEBRIS IN VACANT AND JOB SITE ** REPAIR ROAD SIDE SWALE IN FRONT OF VACANT WILL NEED TO SOD MATCH EXISTING GRADE ** THERE MAYBE OTHER ISSUES NOT NOTED BUILDERS RESPONSIBILITY TO ENSURE SITE IS READY FOR FINAL INSPECTIONS | |||
| ROW - FINAL INSPECTION | 02/11/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL ROCKS AND BUSHES FROM THE DRAINAGE PATTERN ON THE RIGHT. Sec 300.03 C-G. NO trees or clusters of vegetation that would restrict flow along the sidelines to the front swale, drainage ditch, or other drainage conveyance. 2) NEED TO REMOVE ALL DIRT AND OVER POURED CONCRETE FROM CULVERT PIPE. 3) NEED TO SEED STRAW ALL BARE AREAS IN THE VACANT TO THE LEFT OF THIS LOT. Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage ----------------------------------------------------------------------------- ** 12/18/24 NEED TO CLEAN CULVERT PIPES OF SEDIMENT AND OVER POUR ** CLEAN ALL TRASH AND CONSTRUCTION DEBRIS IN VACANT AND JOB SITE ** REPAIR ROAD SIDE SWALE IN FRONT OF VACANT WILL NEED TO SOD MATCH EXISTING GRADE ** THERE MAYBE OTHER ISSUES NOT NOTED BUILDERS RESPONSIBILITY TO ENSURE SITE IS READY FOR FINAL INSPECTIONS | |||
| U -UTILITY RESIDENTIAL FINAL | 02/11/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 02/11/2025 | APPROVED | PFLANAGAN |
| Note: Inspector Notes from Inspection 9465 ** 12/18/24 NEED TO CLEAN CULVERT PIPES OF SEDIMENT AND OVER POUR ** CLEAN ALL TRASH AND CONSTRUCTION DEBRIS IN VACANT AND JOB SITE ** REPAIR ROAD SIDE SWALE IN FRONT OF VACANT WILL NEED TO SOD MATCH EXISTING GRADE ** THERE MAYBE OTHER ISSUES NOT NOTED BUILDERS RESPONSIBILITY TO ENSURE SITE IS READY FOR FINAL INSPECTIONS | |||
| U-CROSS CONNECTION | 02/11/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no crosscconnection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/18/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/18/24 NEED TO CLEAN CULVERT PIPES OF SEDIMENT AND OVER POUR ** CLEAN ALL TRASH AND CONSTRUCTION DEBRIS IN VACANT AND JOB SITE ** REPAIR ROAD SIDE SWALE IN FRONT OF VACANT WILL NEED TO SOD MATCH EXISTING GRADE ** THERE MAYBE OTHER ISSUES NOT NOTED BUILDERS RESPONSIBILITY TO ENSURE SITE IS READY FOR FINAL INSPECTIONS | |||
| ELECTRIC - EARLY POWER | 12/09/2024 | APPROVED | JSTEWART |
| Note: 12/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 12/6/2024 1:46:15 PM *** 1. Side B- Missing outlet behind door (covered by drywall) Bedroom 2. per plan 2. Address posted required for emergency service. FBCR 319.1 12/4/2024 - PREVIOUS INSPECTION NOTES 12/4/24 Both sides locked. Could not access for inspection FBC(A) 110.5 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 Unit A (left Side) 1. MBR Closet light not safed off NEC E3906.9 2. No surge protection installed NEC 230.67 3. Missing sticker on panel locating AH in attic Unit B (right side) 1. Not ready (electricians working at time of inspection) FBC(A) 107.4 2. Surge protection not installed NEC 230.67 | |||
| ELECTRIC - EARLY POWER | 12/06/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 12/6/2024 1:46:15 PM *** 1. Side B- Missing outlet behind door (covered by drywall) Bedroom 2. per plan 2. Address posted required for emergency service. FBCR 319.1 12/4/2024 - PREVIOUS INSPECTION NOTES 12/4/24 Both sides locked. Could not access for inspection FBC(A) 110.5 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 Unit A (left Side) 1. MBR Closet light not safed off NEC E3906.9 2. No surge protection installed NEC 230.67 3. Missing sticker on panel locating AH in attic Unit B (right side) 1. Not ready (electricians working at time of inspection) FBC(A) 107.4 2. Surge protection not installed NEC 230.67 | |||
| ELECTRIC - EARLY POWER | 12/04/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 12/4/24 Both sides locked. Could not access for inspection FBC(A) 110.5 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 Unit A (left Side) 1. MBR Closet light not safed off NEC E3906.9 2. No surge protection installed NEC 230.67 3. Missing sticker on panel locating AH in attic Unit B (right side) 1. Not ready (electricians working at time of inspection) FBC(A) 107.4 2. Surge protection not installed NEC 230.67 | |||
| ELECTRIC - EARLY POWER | 11/27/2024 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 11/27/24 Unit A (left Side) 1. MBR Closet light not safed off NEC E3906.9 2. No surge protection installed NEC 230.67 3. Missing sticker on panel locating AH in attic Unit B (right side) 1. Not ready (electricians working at time of inspection) FBC(A) 107.4 2. Surge protection not installed NEC 230.67 | |||
| GRAVITY SEWER TEST | 10/17/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 9450 9/12/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS ON PERMIT BOARD OR POSTED CLEARLY ON 2X4 POST. NOT ABLETO SEE TIE IN DUE TO WATER FILLED DITCHES THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 10/15/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------- 10/7/2024 - PREVIOUS INSPECTION NOTES TO MUCH WATER IN POURING AREA ITS THE CONTRACTORS RESPONSIBILTY TO CALL THE INSPECTOR TO CANCEL IF THIS IS NOT READY FOR INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. ------------------------------------------------------------------- 10/4/2024 - PREVIOUS INSPECTION NOTES ** 10/04/24 NEED TO HAVE A MINIMUM OF 4 OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW ** RIGHT SIDE DRIVEWAY ADJUST FACEBOARD ALONG THE EDGE OF ROAD IN TOO CLOSE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/07/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: TO MUCH WATER IN POURING AREA ITS THE CONTRACTORS RESPONSIBILTY TO CALL THE INSPECTOR TO CANCEL IF THIS IS NOT READY FOR INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. ------------------------------------------------------------------- 10/4/2024 - PREVIOUS INSPECTION NOTES ** 10/04/24 NEED TO HAVE A MINIMUM OF 4 OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW ** RIGHT SIDE DRIVEWAY ADJUST FACEBOARD ALONG THE EDGE OF ROAD IN TOO CLOSE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/04/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/04/24 NEED TO HAVE A MINIMUM OF 4 OF CONCRETE IN THE DRIVEWAY POUR AREA ABOVE THE ROW ** RIGHT SIDE DRIVEWAY ADJUST FACEBOARD ALONG THE EDGE OF ROAD IN TOO CLOSE | |||
| GRAVITY SEWER TEST | 09/16/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: 9/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS ON PERMIT BOARD OR POSTED CLEARLY ON 2X4 POST THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 09/16/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 9/12/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS ON PERMIT BOARD OR POSTED CLEARLY ON 2X4 POST. NOT ABLETO SEE TIE IN DUE TO WATER FILLED DITCHES THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 09/13/2024 | CANCELLED BY APPLICANT | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS ON PERMIT BOARD OR POSTED CLEARLY ON 2X4 POST | |||
| FIREWALL DRYWALL NAILING | 09/12/2024 | APPROVED | FWILLIS |
| FIREWALL FINAL | 09/12/2024 | APPROVED | FWILLIS |
| U - SEWER TIE IN | 09/12/2024 | Disapproved - NO FEE | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO HAVE ADDRESS ON PERMIT BOARD OR POSTED CLEARLY ON 2X4 POST. NOT ABLETO SEE TIE IN DUE TO WATER FILLED DITCHES | |||
| PEP TANK INSTALLATION REQUEST | 09/04/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 08/06/2024 | APPROVED | FWILLIS |
| INSULATION | 07/29/2024 | APPROVED | FWILLIS |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2420 4/30/24- 1. Please obtain a revision of product approval for doors and windows installed (dont match). 2. Please obtain and submit a engineered fix letter for Firewall Penetration thru Block wall. 3. Please install all missing gasket seals at register boots. FBEC 402.4.1.1....HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the subfloor, wall covering or ceiling penetrated by the boot will check at insulation. | |||
| INSULATION | 07/26/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2420 4/30/24- 1. Please obtain a revision of product approval for doors and windows installed (dont match). 2. Please obtain and submit a engineered fix letter for Firewall Penetration thru Block wall. 3. Please install all missing gasket seals at register boots. FBEC 402.4.1.1....HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the subfloor, wall covering or ceiling penetrated by the boot will check at insulation. | |||
| ALL ROUGH | 04/30/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 4/30/24- 1. Please obtain a revision of product approval for doors and windows installed (dont match). 2. Please obtain and submit a engineered fix letter for Firewall Penetration thru Block wall. 3. Please install all missing gasket seals at register boots. FBEC 402.4.1.1....HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the subfloor, wall covering or ceiling penetrated by the boot will check at insulation. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2024 | APPROVED | FWILLIS |
| Note: 4/19/2024 - PREVIOUS INSPECTION NOTES 4/19/24- 1. incomplete plans No truss tie down schedule onsite. 2. Please install gable bracing per the plans.....2x6 on underside of top truss chord.......highlighted on plans given. 4/18/2024 - PREVIOUS INSPECTION NOTES Need building plans on site for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/19/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 4/19/24- 1. incomplete plans No truss tie down schedule onsite. 2. Please install gable bracing per the plans.....2x6 on underside of top truss chord.......highlighted on plans given. 4/18/2024 - PREVIOUS INSPECTION NOTES Need building plans on site for inspection. | |||
| ROOF VALLEY & METAL | 04/18/2024 | APPROVED | KSANDOE |
| WALL SHEATHING | 04/18/2024 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/18/2024 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Need building plans on site for inspection. | |||
| TIE BEAM / LINTEL | 03/07/2024 | APPROVED | AGAETANO |
| Note: 3/6/2024 - PREVIOUS INSPECTION NOTES 3/6/24- 1. Previous note not rectified.....PROOF OF COMPACTION AT NEXT INSPECTION AS DISCUSSED. R401.4 Soil tests. 2. Please relocate multiple footing dowels for Min 3/4" embedment. R606.3.4 CLEARANCE FROM MASONRY 3. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please Install silt fence prior to calling in inspections to avoid future fees Inspector Notes from Inspection 2250 PROOF OF COMPACTION AT NEXT INSPECTION AS DISCUSSED. | |||
| TIE BEAM / LINTEL | 03/06/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 3/6/24- 1. Previous note not rectified.....PROOF OF COMPACTION AT NEXT INSPECTION AS DISCUSSED. R401.4 Soil tests. 2. Please relocate multiple footing dowels for Min 3/4" embedment. R606.3.4 CLEARANCE FROM MASONRY 3. 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please Install silt fence prior to calling in inspections to avoid future fees Inspector Notes from Inspection 2250 PROOF OF COMPACTION AT NEXT INSPECTION AS DISCUSSED. | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/10/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/28/2023 | APPROVED - AS NOTED | FWILLIS |
| Note: PROOF OF COMPACTION AT NEXT INSPECTION AS DISCUSSED. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/14/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO HAVE ADDRESS ON PERMIT BOARD OR POSTED CLEARLY ON 2X4 POST | |||
| WATER METER INSTALLATION REQUEST | 11/22/2023 | APPROVED | CBOWERMASTER |
| Note: 10/31/2023 8:23:47 AM- PREVIOUS INSPECTION NOTES 10/5/2023 7:19:46 AM- PREVIOUS INSPECTION NOTES not cleared logs on property | |||
| WATER METER INSTALLATION REQUEST | 10/30/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: 10/5/2023 7:19:46 AM- PREVIOUS INSPECTION NOTES not cleared logs on property | |||
| ROW - DRAINAGE | 10/12/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/12/23 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE AND DRAINAGE FROM THE SITE ** TO KEEP,ALL TRASH FROM THE STORMWATER DRAINAGE SYSTEM _______________________________________________________________________________________________________________________ 10/11/2023 - PREVIOUS INSPECTION NOTES ** 10/11/23 BUILDER NEEDS TO REMOVE THE DUMPSTER FROM THE EDGE OF ROAD AND OUT OF THE SWALE IMMEDIATELY ITS CREATING A SAFTEY HAZARD FOR MOTORISTS, PEDESTRIANS, BICYCLISTS, AS WELL AS BLOCKING THE SWALE ** REMOVE PORT-A-JOHN FROM ROADSIDE SWALE AND PUT ONTO JOB SITE ** REMOVE TRASH FROM SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/12/23 DUE ROADSIDE HAZARD | |||
| ROW - DRAINAGE | 10/11/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/11/23 BUILDER NEEDS TO REMOVE THE DUMPSTER FROM THE EDGE OF ROAD AND OUT OF THE SWALE IMMEDIATELY ITS CREATING A SAFTEY HAZARD FOR MOTORISTS, PEDESTRIANS, BICYCLISTS, AS WELL AS BLOCKING THE SWALE ** REMOVE PORT-A-JOHN FROM ROADSIDE SWALE AND PUT ONTO JOB SITE ** REMOVE TRASH FROM SWALE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/12/23 DUE ROADSIDE HAZARD | |||
| WATER METER INSTALLATION REQUEST | 10/03/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: not cleared |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/14/2025 | 02/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/17/2024 | 07/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide UL fire stop system detail to be used for membrane piping penetration and provide UL detail for icemaker penetration or provide manufacturers specs for a 1Hr rated icemaker box 2. Provide detail showing the reconstruction of wall penetration will be fully grouted with no filler | |||
| BLD | HOLD | 06/06/2024 | 06/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide UL fire stop system detail to be used for membrane piping penetration and provide UL detail for icemaker penetration or provide manufacturers specs for a 1Hr rated icemaker box 2. Provide detail showing the reconstruction of wall penetration will be fully grouted with no filler | |||
| BLD | COMPLETE | 04/11/2024 | 04/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/26/2024 | 04/01/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout must have shop drawing approval stamp by engineer of record. | |||
| ENGIN1 | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/19/2023 | 09/19/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/19/2023 | 09/25/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/07/2023 | 10/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/06/2023 | 09/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/06/2023 | 09/07/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 09/06/2023 | 09/08/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calculations | |||
| ENGIN1 | COMPLETE | 09/06/2023 | 09/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/06/2023 | 09/11/2023 |
| LOCATE | COMPLETE | 09/06/2023 | 09/12/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/06/2023 | 09/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/06/2023 | 09/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/06/2023 | 09/07/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan not provided |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/22/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/22/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/22/2025 |
| REINSPECTION FEE | ¤40.00 | 04/22/2025 |
| REINSPECTION FEE | ¤40.00 | 04/22/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/22/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/22/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/22/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/22/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/22/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/02/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/02/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/02/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/02/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 10/02/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 10/02/2023 |
| SEWER CREDIT | (¤2,016.00) | 10/02/2023 |
| SEWER INSPECTION | ¤25.00 | 10/02/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 10/02/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 10/02/2023 |
| SITE PLAN 30 | ¤30.00 | 10/02/2023 |
| SURCHARGE FS 533.721 | ¤6.38 | 10/02/2023 |
| SURCHARGE - FS 468.631 | ¤9.57 | 10/02/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/02/2023 |
| WATER- TURN ON | ¤50.00 | 10/02/2023 |
| ADJUSTMENT 50% | (¤638.05) | 10/02/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/02/2023 |
| INSPECTION - RESIDENTIAL | ¤970.75 | 10/02/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤275.34 | 10/02/2023 |
| CONNECTION FEES | ¤2,332.52 | 10/02/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 10/02/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 10/02/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 10/02/2023 |
| IMPACT FEE FIRE | ¤841.04 | 10/02/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 10/02/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 10/02/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 10/02/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 10/02/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 10/02/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 10/02/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 10/02/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 10/02/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤39,655.25 |