Permit #2023090191

Permit Details

Status: COED

Parcel Id: 05-12-31-2755-00000-1980
CONDITIONED SPACE: 1806 sqft
GARAGE: 458 sqft
OPENED PORCH (WITH ROOF) : 248 sqft
Total Square Footage: 2512 sqft
Block: 00000
Subdivision: 2313 - THE GABLES SUBDIVISION
Job Phone: (386)756-0439
Location Address: 220 HAWTHORN AVE
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/26/2023
NOC: RECORDED
Applicant name: JAMES MICHAEL MATHER
Owner: PAYTAS HOMES INC

Address

PO BOX 290490

PORT ORANGE, FL 32127

Lot: 1980
Contracted Stated Job Value: ¤275,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

PAYTAS HOMES INC
Status Location Address State License Number Phone
ACTIVE

PO BOX 290490

PORT ORANGE, FL 32127

CBC1261873 (Exp: 08/31/2026) (386)756-0439

Sub Contractors

GERALD EDWARD MASTERS JR
Status Location Address State License Number Phone
ACTIVE

505 HERBERT STREET

PORT ORANGE, FL 32129

EC13003217 (Exp: 08/31/2026) (386)304-2600
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
IAN MICHEAL JOHNSON
Status Location Address State License Number Phone Fax
ACTIVE

4244 JACKSON STREET

PORT ORANGE, FL 32127

CCC1325915 (Exp: 08/31/2026) 386-760-0764 386-760-3080

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/11/2024 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 03/08/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
U -UTILITY RESIDENTIAL FINAL 03/08/2024 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 03/06/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/06/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/06/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 03/06/2024 APPROVED - AS NOTED PFLANAGAN
Note: THE LEFT OVER PAVER BASE IS BEING USED ON ANOTHER SITE PASSING AS NOTED THAT THERE ARE GOING TO USE IT AND NOT LEAVING IT
ROW- PRE-APRON (PRE-POUR) 02/12/2024 APPROVED - AS NOTED FSLADISH
Note: 2/12/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24 THIS SITE IS NOT READY FOR SPREAD AND COMPACTION SECONDARY INSPECTION AT THIS TIME. NO PAVER BASE HAS BEEN SPREAD.. SEE PHOTO FOR REFERENCE. I WILL NOT FEE YOU TODAY. MAKE SURE YOU ARE READY FOR INSPECTION BEFORE YOU RESUBMIT FOR SECONDARY PREPOUR INSPECTION Inspector Notes from Inspection 9271 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***DO NOT LAY ANY PAVERS UNTIL A SPREAD AND COMPACTION INSPECTION HAS BEEN PASSED.***
ROW- PRE-APRON (PRE-POUR) 02/09/2024 Disapproved - NO FEE FSLADISH
Note: 2/9/24 THIS SITE IS NOT READY FOR SPREAD AND COMPACTION SECONDARY INSPECTION AT THIS TIME. NO PAVER BASE HAS BEEN SPREAD.. SEE PHOTO FOR REFERENCE. I WILL NOT FEE YOU TODAY. MAKE SURE YOU ARE READY FOR INSPECTION BEFORE YOU RESUBMIT FOR SECONDARY PREPOUR INSPECTION Inspector Notes from Inspection 9271 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***DO NOT LAY ANY PAVERS UNTIL A SPREAD AND COMPACTION INSPECTION HAS BEEN PASSED.***
ROW- PAVER RESTRAINTS 02/02/2024 APPROVED - AS NOTED FSLADISH
Note: 2/2/24 YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***DO NOT LAY ANY PAVERS UNTIL A SPREAD AND COMPACTION INSPECTION HAS BEEN PASSED.***
ROW- PRE-APRON (PRE-POUR) 02/02/2024 PARTIALLY APPROVED FSLADISH
Note: 2/2/24 YOU ARE PARTIALLY APPROVED AND READY TO POUR THE DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. **DO NOT LAY ANY PAVERS UNTIL YOU HAVE SUBMITTED AND PASSED A SECONDARY SPREAD AND COMPACTION INSPECTION** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
GRAVITY SEWER TEST 02/01/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 02/01/2024 Approval - Private Provider PPROVIDER
U - SEWER TIE IN 02/01/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 12/22/2023 Approval - Private Provider PPROVIDER
INSULATION 12/19/2023 Approval - Private Provider PPROVIDER
ALL ROUGH 12/14/2023 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 11/27/2023 Approval - Private Provider PPROVIDER
DOWN CELL 11/14/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 11/14/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/14/2023 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 11/06/2023 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 10/27/2023 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 10/24/2023 APPROVED TBAKER
WATER METER INSTALLATION REQUEST 10/12/2023 APPROVED CBOWERMASTER
MONOLITHIC SLAB 10/10/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 10/06/2023 Approval - Private Provider PPROVIDER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/24/2023 10/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/24/2023 10/24/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 09/19/2023 09/20/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 09/19/2023 09/21/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/12/2023 09/12/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Repeat Comments: Survey/Site plan is missing setbacks,property lines etc Horizontal trim bands must wrap corners at least two feet Please separate the floor and elevation pages for review **Original ROW Agreement received 9/12/23**
CUSVC COMPLETE 09/07/2023 09/08/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/07/2023 09/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/07/2023 09/12/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 09/07/2023 09/19/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO SUBMIT A SITE PLAN THAT HAS PROPOSED ELEVATIONS
ZON HOLD 09/07/2023 09/07/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement Survey/Site plan is missing setbacks,property lines etc Horizontal trim bands must wrap corners at least two feet Please separate the floor and elevation pages for review
URB COMPLETE 09/07/2023 09/08/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 09/26/2023
WATER-METER ¤419.86 09/26/2023
ADJUSTMENT 50% (¤15.00) 09/26/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/26/2023
CONNECTION FEES ¤25.00 09/26/2023
FIRE IMPACT FEE ADMIN ¤12.62 09/26/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/26/2023
FC IMPACT FEE EMS ¤62.00 09/26/2023
IMPACT FEE FIRE ¤420.52 09/26/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/26/2023
FC IMPACT FEE LIBRARY ¤268.00 09/26/2023
IMPACT FEE PARKS ¤1,769.15 09/26/2023
IMPACT FEE SCHOOL ¤5,450.00 09/26/2023
RECORDING FEE REIMBURSE DOC ¤44.00 09/26/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 09/26/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/26/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/26/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/26/2023
SURCHARGE FS 533.721 ¤2.00 09/26/2023
SURCHARGE - FS 468.631 ¤2.00 09/26/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/26/2023
SW ENG INSPECTION 80 ¤80.00 09/26/2023
SW ENG PRE APRON ¤30.00 09/26/2023
SW ENG - REVIEW 20 ¤20.00 09/26/2023
SW ENG RES REVIEW 200 ¤200.00 09/26/2023
TRANS IMPACT FEE ADMIN ¤99.33 09/26/2023
TRANS IMPACT FEE ADMIN (¤99.33) 09/26/2023
SEWER INSPECTION ¤25.00 09/26/2023
SITE PLAN 30 ¤30.00 09/26/2023
Fees Total Due: ¤0.00 Total Paid: ¤12,941.92