Permit #2023090194
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00820-0030 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00820 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 912-258-2201 |
| Location Address: 13 BUFFALO GROVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/20/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤215,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 03/04/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/4/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| BLD - BUILDING FINAL | 03/01/2024 | FINAL APPROVED | JSTEWART |
| Note: 2/29/2024 - PREVIOUS INSPECTION NOTES 2/29/24- 1. Master bath lav on left Fixture hot water is reversed. FPBC 607.4 Flow of hot water to fixtures. Fixture fittings, faucets and diverters shall be installed and adjusted so that the flow of hot water from the fittings corresponds to the left-hand side of the fixture fitting. 2. Master Shower mixing valve Hot water is oposite of fixture indication stamp. FPBC 607.4 Flow of hot water to fixtures.Shower and tub/shower mixing valves conforming to ASSE 1016/ASME A112.1016/CSA B125.16 or ASME A112.18.1/CSA B125.1, where the flow of hot water corresponds to the markings on the device. 3. Lanai bath Shower mixing valve Hot water is oposite of fixture indication stamp. FPBC 607.4 Flow of hot water to fixtures. 4. Please seal or cap dryer exhaust duct (unless dryer is installed) M1502.4.7 Exhaust duct required......Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates... | |||
| BLD - BUILDING FINAL | 02/29/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 2/29/24- 1. Master bath lav on left Fixture hot water is reversed. FPBC 607.4 Flow of hot water to fixtures. Fixture fittings, faucets and diverters shall be installed and adjusted so that the flow of hot water from the fittings corresponds to the left-hand side of the fixture fitting. 2. Master Shower mixing valve Hot water is oposite of fixture indication stamp. FPBC 607.4 Flow of hot water to fixtures.Shower and tub/shower mixing valves conforming to ASSE 1016/ASME A112.1016/CSA B125.16 or ASME A112.18.1/CSA B125.1, where the flow of hot water corresponds to the markings on the device. 3. Lanai bath Shower mixing valve Hot water is oposite of fixture indication stamp. FPBC 607.4 Flow of hot water to fixtures. 4. Please seal or cap dryer exhaust duct (unless dryer is installed) M1502.4.7 Exhaust duct required......Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates... | |||
| U-CROSS CONNECTION | 02/29/2024 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 02/29/2024 | APPROVED | TPOLACEK |
| Note: 02/29/24 AT TIME OF INSPECTION THE HOT PATCH IS STILL NOT COMPLETE. I WILL APPROVE THE FINAL ROW BUT YOU NEED TO COMPLETE BEFORE THE AFTER POUR. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/29/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/28/2024 | APPROVED | TPOLACEK |
| Note: 02/28/27 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/28/2024 | APPROVED | TPOLACEK |
| Note: 02/28/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 01/30/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/30/24- Authorize release of email to FPL @ 1:18p 1/29/2024 - PREVIOUS INSPECTION NOTES 1/29/24-via text | |||
| ELECTRIC - EARLY POWER | 01/29/2024 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 1/29/24-via text | |||
| ROW- PRE-APRON (PRE-POUR) | 01/29/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. --------------------------------------------------------------------------------------- 1/26/2024 - PREVIOUS INSPECTION NOTES 01/26/24 JOB BOX MUST BE REMOVED FROM POLE. CANNOT GET TO THE BENCHMARK TO SHOOT THE ELEVATIONS. JOB BOXES ARE NOT ALLOWED TO MOUNTED TO ANY POLES FOR FUTURE REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/26/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 01/26/24 JOB BOX MUST BE REMOVED FROM POLE. CANNOT GET TO THE BENCHMARK TO SHOOT THE ELEVATIONS. JOB BOXES ARE NOT ALLOWED TO MOUNTED TO ANY POLES FOR FUTURE REFERENCE. | |||
| U - SEWER TIE IN | 01/23/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/23/2024 | APPROVED | MGIBSON |
| Note: 11/14/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES sewer not ran yet | |||
| PEP TANK INSTALLATION REQUEST | 12/28/2023 | APPROVED | TCHURCHILL |
| INSULATION | 12/21/2023 | APPROVED | FWILLIS |
| Note: 12/21/23 - ITEMS CORRECTED Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 12/18/23- Please install Plumbing NP at spare bath vent pipe at top plate. Please install Blocking at top of Breaker panel chase for romex protection and firestop. will check at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 12/19/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 12/18/23- Please install Plumbing NP at spare bath vent pipe at top plate. Please install Blocking at top of Breaker panel chase for romex protection and firestop. will check at insulation. | |||
| ALL ROUGH | 12/18/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 12/18/23- Please install Plumbing NP at spare bath vent pipe at top plate. Please install Blocking at top of Breaker panel chase for romex protection and firestop. will check at insulation. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/11/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 12/08/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING | 12/06/2023 | APPROVED | FWILLIS |
| WALL SHEATHING | 12/06/2023 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 12/05/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/28/2023 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 11/16/2023 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 11/14/2023 | Disapproved - NO FEE | MGIBSON |
| Note: 11/13/2023 - PREVIOUS INSPECTION NOTES sewer not ran yet | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/14/2023 | APPROVED | MGIBSON |
| Note: 11/13/2023 - PREVIOUS INSPECTION NOTES | |||
| GRAVITY SEWER TEST | 11/13/2023 | CANCELLED BY APPLICANT | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/13/2023 | CANCELLED BY APPLICANT | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/31/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/05/2023 | 12/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/05/2023 | 12/05/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 11/08/2023 | 11/13/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. What are the changes in the plan? there were no comments asking for changes? | |||
| ZON | COMPLETE | 10/12/2023 | 10/13/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/12/2023 | 10/14/2023 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 10/12/2023 | 10/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/12/2023 | 10/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/10/2023 | 10/10/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan missing rear setback All windows and doors facing right of way must have banding. This house backs to a street. Additional foundation plantings required along the rear as this backs to a right of way | |||
| ELEC | COMPLETE | 10/10/2023 | 10/10/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/10/2023 | 10/10/2023 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 10/10/2023 | 10/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 09/07/2023 | 09/11/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 09/07/2023 | 09/08/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 09/07/2023 | 09/11/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need switch for exterior lights in hallway by bed 2. NEC 2017 210.70 | |||
| ENGIN1 | COMPLETE | 09/07/2023 | 09/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/07/2023 | 09/11/2023 |
| LOCATE | COMPLETE | 09/07/2023 | 09/12/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/07/2023 | 09/12/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 09/07/2023 | 09/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/07/2023 | 09/07/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: please add i shade tree to the plan as there are 4 understorys and no shade tree Site plan: missing rear setback please provide | |||
| BADMIN | COMPLETE | 09/07/2023 | 09/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/07/2023 | 10/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 03/05/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/05/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/20/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/20/2023 |
| SEWER CREDIT | (¤850.00) | 10/20/2023 |
| SEWER INSPECTION | ¤25.00 | 10/20/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 10/20/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 10/20/2023 |
| SITE PLAN 30 | ¤30.00 | 10/20/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/20/2023 |
| IMPACT FEE FIRE | ¤428.09 | 10/20/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/20/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/20/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 10/20/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/20/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 10/20/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/20/2023 |
| SURCHARGE FS 533.721 | ¤5.34 | 10/20/2023 |
| SURCHARGE - FS 468.631 | ¤8.01 | 10/20/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/20/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/20/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/20/2023 |
| WATER- TURN ON | ¤25.00 | 10/20/2023 |
| ADJUSTMENT 50% | (¤533.91) | 10/20/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/20/2023 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 10/20/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 10/20/2023 |
| CONNECTION FEES | ¤1,166.26 | 10/20/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,676.30 |