Permit #2023090222
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00460-0030 |
| CONDITIONED SPACE: 2052 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2475 sqft |
| Block: 00460 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 904-268-7730 |
| Location Address: 111 PRITCHARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/25/2023 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC OF FLORIDA |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
DANIEL GREGORY PUGLISI
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
EC13011195 (Exp: 08/31/2024) | 407-302-7800 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/28/2024 | FINAL APPROVED | RSIMS |
| Note: New inspection due to canceled inspection 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24: Please walk your house in entirety to verify it is 100% ready before calling in Building Final Inspections as Building Inspectors are not required to provide Punch Lists for Superintendents and/or Builders. 1). Range anti-tip device is not installed properly. (large gap between bottom & floor and anchors pulling out). Please secure properly to the bottom plate or tapcon to the floor as required by the Manufacturer. 2). Garage door opener - safety eyes are above the 6" (From Finished Floor) maximum as required by UL 325.6 / 16CFR part 1211. 3). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 4). Missing termite final certification. 5). #6 ground wire needs to be fully protected from footer steel into the Meter panel per NEC 250-92. 6). OD Condensing Unit: Anchor has a broken tapcon into pad. M1307.2 7). Hall bathroom: Tub spout is not sealed as required. FBC-P2705.1(3) (Where fixtures come in contact with walls and floors, the contact shall be water tight.) 8). TUG Outlet is not identified as required. NEC 408.4 (A) 9). Missing 'J' channel at all exterior outlet boxes (including front entry) and hose bibbs allowing water to penetrate behind the siding. Plaster ring style boxes installed are designed for stucco but not vinyl siding as they are too deep and not adjustable. 7). | |||
| ROW - FINAL APRON (AFTER POUR) | 02/28/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THE APRON IS STILL EXCEEDS THE 8% SLOPE BUT WE A LETTING THE BUILDER TO CO THIS HOUSE THEY HAVE PULLED A DRIVEWAY PERMIT FOR THE CORRECTION OF THE APRON THE PERMIT NUMBER IS 2024021189. WE WILL BE INSPECTING THIS UNDER THE DRIVEWAY PERMIT FROM HERE ON OUT. ---------------------------------------------------------------------------------------------- 2/22/2024 - PREVIOUS INSPECTION NOTES THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE ----------------------------------------------------------------------------- 2/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX PLEASE SEE NOTES ON THE SWALE PLAN DETAIL FOR ALL THINGS REQUIRED FOR THE PRE POUR --------------------------------------------------------------------------------------------- 2/15/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX | |||
| BLD - BUILDING FINAL | 02/27/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24: Please walk your house in entirety to verify it is 100% ready before calling in Building Final Inspections as Building Inspectors are not required to provide Punch Lists for Superintendents and/or Builders. 1). Range anti-tip device is not installed properly. (large gap between bottom & floor and anchors pulling out). Please secure properly to the bottom plate or tapcon to the floor as required by the Manufacturer. 2). Garage door opener - safety eyes are above the 6" (From Finished Floor) maximum as required by UL 325.6 / 16CFR part 1211. 3). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 4). Missing termite final certification. 5). #6 ground wire needs to be fully protected from footer steel into the Meter panel per NEC 250-92. 6). OD Condensing Unit: Anchor has a broken tapcon into pad. M1307.2 7). Hall bathroom: Tub spout is not sealed as required. FBC-P2705.1(3) (Where fixtures come in contact with walls and floors, the contact shall be water tight.) 8). TUG Outlet is not identified as required. NEC 408.4 (A) 9). Missing 'J' channel at all exterior outlet boxes (including front entry) and hose bibbs allowing water to penetrate behind the siding. Plaster ring style boxes installed are designed for stucco but not vinyl siding as they are too deep and not adjustable. 7). | |||
| ROW- PROJECT STATUS | 02/26/2024 | APPROVED | PFLANAGAN |
| Note: MEETING DOYAL ON SITE ABOUT DRIVEWAY APRON | |||
| ROW - FINAL APRON (AFTER POUR) | 02/22/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE ----------------------------------------------------------------------------- 2/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX PLEASE SEE NOTES ON THE SWALE PLAN DETAIL FOR ALL THINGS REQUIRED FOR THE PRE POUR --------------------------------------------------------------------------------------------- 2/15/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX | |||
| U -UTILITY RESIDENTIAL FINAL | 02/22/2024 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 02/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| BLD - BUILDING FINAL | 02/22/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/22/24: Please walk your house in entirety to verify it is 100% ready before calling in Building Final Inspections as Building Inspectors are not required to provide Punch Lists for Superintendents and/or Builders. 1). Range anti-tip device is not installed properly. (large gap between bottom & floor and anchors pulling out). Please secure properly to the bottom plate or tapcon to the floor as required by the Manufacturer. 2). Garage door opener - safety eyes are above the 6" (From Finished Floor) maximum as required by UL 325.6 / 16CFR part 1211. 3). Water Heater Relief Valve Discharge tube is too long per FBC- P504.6 (1.5" min / 6" max 0ff floor). 4). Missing termite final certification. 5). #6 ground wire needs to be fully protected from footer steel into the Meter panel per NEC 250-92. 6). OD Condensing Unit: Anchor has a broken tapcon into pad. M1307.2 7). Hall bathroom: Tub spout is not sealed as required. FBC-P2705.1(3) (Where fixtures come in contact with walls and floors, the contact shall be water tight.) 8). TUG Outlet is not identified as required. NEC 408.4 (A) 9). Missing 'J' channel at all exterior outlet boxes (including front entry) and hose bibbs allowing water to penetrate behind the siding. Plaster ring style boxes installed are designed for stucco but not vinyl siding as they are too deep and not adjustable. 7). | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/21/2024 | APPROVED | PFLANAGAN |
| Note: THIS FINAL SURVEY HAS PASS ALREADY | |||
| U - SEWER TIE IN | 02/20/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 New inspection due to canceled inspection 1/12/2024 - PREVIOUS INSPECTION NOTES 1/10/2024 - PREVIOUS INSPECTION NOTES 10/20/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET NO TEST ON SEWER SEWER RAN ACROSS DRIVEWAY TAP IS ON THE SAME SIDE AS WATER METER PIT | |||
| ROW - STORMWATER FINAL | 02/16/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE -------------------------------------------------------------- 2/15/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS SURROUNDING YOUR LOT | |||
| ROW - FINAL APRON (AFTER POUR) | 02/16/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX PLEASE SEE NOTES ON THE SWALE PLAN DETAIL FOR ALL THINGS REQUIRED FOR THE PRE POUR --------------------------------------------------------------------------------------------- 2/15/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX | |||
| ROW - FINAL APRON (AFTER POUR) | 02/15/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO DO THE HOT PATCH FOR THE ROAD DAMAGE 2) THE APRON OF THE DRIVEWAY EXCEEDS THE 8% SLOPE NEED TO FIX | |||
| ROW - STORMWATER FINAL | 02/15/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS SURROUNDING YOUR LOT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/13/2024 | APPROVED | TPOLACEK |
| Note: 02/13/24 Inspector Notes from Inspection 9270 1/26/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/13/2024 | APPROVED | TPOLACEK |
| Note: 02/13/24 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AS A NOTE THE DRIVEWAY APRON IN THE CENTER LINE EXCEEDS THE 8% SLOPE MAX. PLEASE SEE ATTACHED 300E CITY TECH CODE. APRON MAY NOT EXCEED 8% SLOPE THE SLOPE AT 111 PRITCHARD IS 9.1%. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/30/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 01/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/26/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| U - SEWER TIE IN | 01/25/2024 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection 1/12/2024 - PREVIOUS INSPECTION NOTES 1/10/2024 - PREVIOUS INSPECTION NOTES TAP NOT MADE | |||
| GRAVITY SEWER TEST | 01/25/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: New inspection due to canceled inspection 1/12/2024 - PREVIOUS INSPECTION NOTES 1/10/2024 - PREVIOUS INSPECTION NOTES 10/20/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET NO TEST ON SEWER SEWER RAN ACROSS DRIVEWAY TAP IS ON THE SAME SIDE AS WATER METER PIT | |||
| GRAVITY SEWER TEST | 01/23/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 1/12/2024 - PREVIOUS INSPECTION NOTES 1/10/2024 - PREVIOUS INSPECTION NOTES 10/20/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET NO TEST ON SEWER | |||
| U - SEWER TIE IN | 01/23/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 1/12/2024 - PREVIOUS INSPECTION NOTES 1/10/2024 - PREVIOUS INSPECTION NOTES TAP NOT MADE | |||
| ELECTRIC - EARLY POWER | 01/17/2024 | APPROVED | JWALKER |
| Note: 1/16/2024 - PREVIOUS INSPECTION NOTES Panel cover is not installed 11/17/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed | |||
| ELECTRIC - EARLY POWER | 01/16/2024 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: Panel cover is not installed 11/17/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed | |||
| GRAVITY SEWER TEST | 01/12/2024 | CANCELLED BY APPLICANT | MGIBSON |
| Note: 1/10/2024 - PREVIOUS INSPECTION NOTES 10/20/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET NO TEST ON SEWER | |||
| U - SEWER TIE IN | 01/12/2024 | CANCELLED BY APPLICANT | MGIBSON |
| Note: 1/10/2024 - PREVIOUS INSPECTION NOTES TAP NOT MADE | |||
| U - SEWER TIE IN | 01/10/2024 | Disapproved - NO FEE | MGIBSON |
| Note: TAP NOT MADE | |||
| GRAVITY SEWER TEST | 01/10/2024 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: 10/20/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET NO TEST ON SEWER | |||
| INSULATION | 12/07/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 Missing wall stud between owner suite and great room. | |||
| LATH/BRICK/ WATER BARRIER | 11/30/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 11/30/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Missing wall stud between owner suite and great room. | |||
| ROOF VALLEY & METAL | 11/27/2023 | APPROVED | BTAYLOR |
| Note: 11/22/2023 - PREVIOUS INSPECTION NOTES Not ready. No drip edge or valley metal | |||
| ROOF VALLEY & METAL | 11/22/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Not ready. No drip edge or valley metal | |||
| ELECTRIC-TUG | 11/22/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1052. Release Power New inspection due to canceled inspection 11/17/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed | |||
| ELECTRIC-TUG | 11/21/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 11/17/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed | |||
| ELECTRIC-TUG | 11/17/2023 | Disapproved - NO FEE | KSANDOE |
| Note: No meter can or pedestal installed | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/17/2023 | APPROVED | KSANDOE |
| Note: 11/15/2023 - PREVIOUS INSPECTION NOTES | |||
| WALL SHEATHING | 11/15/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2465 11/13/23: Roof Sheathing approved during seperate Roof Sheathing Inspection. I could not add this note to 2460 Roof Sheathing/Braces/Ties/Down Cell because it is already scheduled for 11/15/23. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2023 | CANCELLED BY APPLICANT | KSANDOE |
| ROOF SHEATHING | 11/13/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 11/13/23: Roof Sheathing approved during seperate Roof Sheathing Inspection. I could not add this note to 2460 Roof Sheathing/Braces/Ties/Down Cell because it is already scheduled for 11/15/23. | |||
| WALL SHEATHING | 11/13/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/13/23: Need dumpster on site and trash piles cleaned up prior to any further approved inspections. Wall Sheathing not attached at Garage Door Portal Frame as required on plan page SD-1. | |||
| MONOLITHIC SLAB | 10/27/2023 | APPROVED | KSANDOE |
| Note: 10/26/2023 - PREVIOUS INSPECTION NOTES No change 10/25/2023 - PREVIOUS INSPECTION NOTES Cave ins noted yesterday are still present. Large root on righ side protruding into foundation must be removed Root sticking up from below nearf hose bib on left side must be removed 10/24/2023 - PREVIOUS INSPECTION NOTES Several areas of foundation wall have caved in | |||
| MONOLITHIC SLAB | 10/27/2023 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 10/26/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: No change 10/25/2023 - PREVIOUS INSPECTION NOTES Cave ins noted yesterday are still present. Large root on righ side protruding into foundation must be removed Root sticking up from below nearf hose bib on left side must be removed 10/24/2023 - PREVIOUS INSPECTION NOTES Several areas of foundation wall have caved in | |||
| MONOLITHIC SLAB | 10/25/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Cave ins noted yesterday are still present. Large root on righ side protruding into foundation must be removed Root sticking up from below nearf hose bib on left side must be removed 10/24/2023 - PREVIOUS INSPECTION NOTES Several areas of foundation wall have caved in | |||
| MONOLITHIC SLAB | 10/24/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Several areas of foundation wall have caved in | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/23/2023 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/23/2023 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 10/23/2023 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 10/20/2023 | Disapproved - NO FEE | MGIBSON |
| Note: SEWER NOT RAN YET | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/20/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/04/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/23/2023 | 10/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/23/2023 | 10/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/05/2023 | 10/06/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/05/2023 | 10/05/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 09/08/2023 | 10/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/08/2023 | 09/08/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/07/2023 | 09/10/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/07/2023 | 09/08/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/07/2023 | 09/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/07/2023 | 09/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/07/2023 | 09/11/2023 |
| LOCATE | COMPLETE | 09/07/2023 | 09/12/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/07/2023 | 09/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/07/2023 | 09/19/2023 |
| Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 09/07/2023 | 09/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/28/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/28/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/28/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/28/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/28/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/25/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/25/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 09/25/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 09/25/2023 |
| SEWER INSPECTION | ¤25.00 | 09/25/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 09/25/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 09/25/2023 |
| SITE PLAN 30 | ¤30.00 | 09/25/2023 |
| CONNECTION FEES | ¤1,166.26 | 09/25/2023 |
| WATER- TURN ON | ¤25.00 | 09/25/2023 |
| ADJUSTMENT 50% | (¤671.58) | 09/25/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/25/2023 |
| INSPECTION - RESIDENTIAL | ¤1,023.00 | 09/25/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤290.16 | 09/25/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 09/25/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 09/25/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 09/25/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 09/25/2023 |
| IMPACT FEE FIRE | ¤420.52 | 09/25/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/25/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/25/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 09/25/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/25/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 09/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/25/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 09/25/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 09/25/2023 |
| SURCHARGE FS 533.721 | ¤6.72 | 09/25/2023 |
| SURCHARGE - FS 468.631 | ¤10.07 | 09/25/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/25/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/25/2023 |
| SW ENG PRE APRON | ¤30.00 | 09/25/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,938.00 |