I want to search for...

Permit #2023090230

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00240-0130
CONDITIONED SPACE: 2052 sqft
GARAGE: 407 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2475 sqft
Block: 00240
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 904-268-7730
Location Address: 18 WHITTIER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/25/2023
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: FOCUS HOMES LLC OF FLORIDA

Address

5220 SHAD ROAD

JACKSONVILLE, FL 32257

Lot: 0130
Contracted Stated Job Value: ¤195,000.00
Job Description: Single Family Residence
Type: CN

Contractor

FOCUS HOMES LLC OF FLORIDA
Status Location Address Mailing Address State License Number Phone
ACTIVE

5220 SHAD RD

JACKSONVILLE, FL 32257

# 202

JACKSONVILLE, FL 32257

CRC1332443 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 03/06/2024 APPROVED EMADISON
Note:
ROW - STORMWATER FINAL 03/01/2024 CANCELLED BY APPLICANT WEB
Note: 2/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola
ROW - STORMWATER FINAL 03/01/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 03/01/24 recieved text cancelling inspection 2/29/2024 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO DO HOT PATCH FOR ROAD DAMAGE ----------------------------------------------------------------------------------------- 2/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola
ROW - STORMWATER FINAL 02/29/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) STILL NEED TO DO HOT PATCH FOR ROAD DAMAGE ----------------------------------------------------------------------------------------- 2/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola
BLD - BUILDING FINAL 02/29/2024 FINAL APPROVED MKRASKI
ROW - FINAL APRON (AFTER POUR) 02/28/2024 APPROVED - AS NOTED FSLADISH
Note: 2/28/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH NOT COMPLETED, WILL NEED TO BE COMPLETED BEFORE ROW FINAL PASSAGE. Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola
BLD - BUILDING FINAL 02/28/2024 Disapproved - NO FEE MKRASKI
Note: Drywall repair in garage needs to be finished
U -UTILITY RESIDENTIAL FINAL 02/28/2024 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9035 lower sewer C/O-pic it to me when done no irr-no cross connection
ROW - STORMWATER FINAL 02/28/2024 CANCELLED BY APPLICANT FSLADISH
Note: Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola Inspector Notes from Inspection 9465 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/27/2024 APPROVED TPOLACEK
Note: 02/27/24 SURVEY IS GOOD Inspector Notes from Inspection 9200 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. Meeting with Larry Joe 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. meeting with Larry Joe 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/27/2024 APPROVED - AS NOTED TPOLACEK
Note: 02/27/24 PLEASE READ PREVIOUS NOTES AND MAKE CORRECTION TO LEFT SIDE SWALE. SOD MUST MATCH GRADE AT PROPERTY LINE. ** STILL NEEDS HOT PATCH BEFORE AFTER POUR AND FINAL ROW ** APPROVING AS NOTED TO MAKE CORRECTIONS 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola
U-CROSS CONNECTION 02/27/2024 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW- PROJECT STATUS 02/15/2024 APPROVED - AS NOTED GBERTOLA
Note: 2/15/24= ON THE LEFT SIDE, FACING THE HOUSE, THE SWALE SHOULD BE MADE SLIGHTLY DEEPER. THE LOCATION OF THE SWALE IS CORRECT, SO DO NOT CHANGE IT.per gbertola 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. Meeting with Larry Joe 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. meeting with Larry Joe 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 02/12/2024 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 02/09/2024 APPROVED - AS NOTED TPOLACEK
Note: 02/09/24 NOTE TO CONTRACTOR* RIGHT SIDE OF APRON BOARD IS JUST OUTSIDE THE EXISTING EDGE OF PAVEMENT. IF YOU COULD JUST MOVE THIS BACK AN INCH OR TWO TO MATCH THE EXISTING EDGE BEFORE POURING. ALL OTHER REQUIRMENTS ARE GOOD. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ELECTRIC - EARLY POWER 01/30/2024 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 2pm
ELECTRIC - EARLY POWER 01/29/2024 Disapproved - NO FEE MKRASKI
Note: Silt fence needs to be maintained in orginal condition FBC 3307.1
GRAVITY SEWER TEST 01/23/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 01/23/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 01/02/2024 APPROVED TCHURCHILL
INSULATION 12/20/2023 APPROVED MKRASKI
ALL ROUGH 12/15/2023 APPROVED RSIMS
Note: 12/12/2023 - PREVIOUS INSPECTION NOTES 12/2/23 Items 1 and 4 not repaired, Item 1 stud on load bearing wall can not exceed 16'' o.c. per detail, item 4 has not been approved by BUilding Dept. 12/11/2023 - PREVIOUS INSPECTION NOTES 12/11/23 1. Item 1 not repaired 2. Dryer duct needs to be sealed at roof decking 3. Master bathroom missing A/C supply per e-cals duct layout 4. Product approval sheet does not match windows installed 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 1. Load bearing stud that was installed for stud that was cut is short of top plate 2. Failed 5' head pressure 3. Ufer has been cut, no ground rods installed Stopped inspection not ready 12/7/2023 - PREVIOUS INSPECTION NOTES 12/7/23 Previous items not repaired, stopped inspection 12/6/2023 - PREVIOUS INSPECTION NOTES 1. Metalic boxes ground screw needs to be tightened down to ensure bond 2. Flat straps required where notch has been cut SER cable above panel 3. Load bearinf stud has been cut and needs to be replaced @ ufer ground Stopped inspection in garage not ready
ALL ROUGH 12/12/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 12/2/23 Items 1 and 4 not repaired, Item 1 stud on load bearing wall can not exceed 16'' o.c. per detail, item 4 has not been approved by BUilding Dept. 12/11/2023 - PREVIOUS INSPECTION NOTES 12/11/23 1. Item 1 not repaired 2. Dryer duct needs to be sealed at roof decking 3. Master bathroom missing A/C supply per e-cals duct layout 4. Product approval sheet does not match windows installed 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 1. Load bearing stud that was installed for stud that was cut is short of top plate 2. Failed 5' head pressure 3. Ufer has been cut, no ground rods installed Stopped inspection not ready 12/7/2023 - PREVIOUS INSPECTION NOTES 12/7/23 Previous items not repaired, stopped inspection 12/6/2023 - PREVIOUS INSPECTION NOTES 1. Metalic boxes ground screw needs to be tightened down to ensure bond 2. Flat straps required where notch has been cut SER cable above panel 3. Load bearinf stud has been cut and needs to be replaced @ ufer ground Stopped inspection in garage not ready
ALL ROUGH 12/11/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 12/11/23 1. Item 1 not repaired 2. Dryer duct needs to be sealed at roof decking 3. Master bathroom missing A/C supply per e-cals duct layout 4. Product approval sheet does not match windows installed 12/8/2023 - PREVIOUS INSPECTION NOTES 12/8/23 1. Load bearing stud that was installed for stud that was cut is short of top plate 2. Failed 5' head pressure 3. Ufer has been cut, no ground rods installed Stopped inspection not ready 12/7/2023 - PREVIOUS INSPECTION NOTES 12/7/23 Previous items not repaired, stopped inspection 12/6/2023 - PREVIOUS INSPECTION NOTES 1. Metalic boxes ground screw needs to be tightened down to ensure bond 2. Flat straps required where notch has been cut SER cable above panel 3. Load bearinf stud has been cut and needs to be replaced @ ufer ground Stopped inspection in garage not ready
LATH/BRICK/ WATER BARRIER 12/11/2023 APPROVED MKRASKI
LATH/BRICK/ WATER BARRIER 12/08/2023 Disapproved - NO FEE MKRASKI
Note: Back of home has joints exposed, taper required around outlet box 12/7/2023 - PREVIOUS INSPECTION NOTES 1. Zip tape needs to cover all joints and areas where membrain has been damaged(along the bottomof sheathing) 2. Right front corner woof is showing and needs to be sealed
ALL ROUGH 12/08/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 12/8/23 1. Load bearing stud that was installed for stud that was cut is short of top plate 2. Failed 5' head pressure 3. Ufer has been cut, no ground rods installed Stopped inspection not ready 12/7/2023 - PREVIOUS INSPECTION NOTES 12/7/23 Previous items not repaired, stopped inspection 12/6/2023 - PREVIOUS INSPECTION NOTES 1. Metalic boxes ground screw needs to be tightened down to ensure bond 2. Flat straps required where notch has been cut SER cable above panel 3. Load bearinf stud has been cut and needs to be replaced @ ufer ground Stopped inspection in garage not ready
ALL ROUGH 12/07/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 12/7/23 Previous items not repaired, stopped inspection 12/6/2023 - PREVIOUS INSPECTION NOTES 1. Metalic boxes ground screw needs to be tightened down to ensure bond 2. Flat straps required where notch has been cut SER cable above panel 3. Load bearinf stud has been cut and needs to be replaced @ ufer ground Stopped inspection in garage not ready
LATH/BRICK/ WATER BARRIER 12/07/2023 Disapproved - NO FEE MKRASKI
Note: 1. Zip tape needs to cover all joints and areas where membrain has been damaged(along the bottomof sheathing) 2. Right front corner woof is showing and needs to be sealed
ALL ROUGH 12/06/2023 Disapproved - NO FEE MKRASKI
Note: 1. Metalic boxes ground screw needs to be tightened down to ensure bond 2. Flat straps required where notch has been cut SER cable above panel 3. Load bearinf stud has been cut and needs to be replaced @ ufer ground Stopped inspection in garage not ready
ROOF VALLEY & METAL 11/29/2023 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 11/28/2023 APPROVED JWALKER
ROOF VALLEY & METAL 11/28/2023 CANCELLED BY APPLICANT WEB
ELECTRIC-TUG 11/22/2023 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 12:15pm
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/21/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/17/2023 APPROVED FWILLIS
ROOF SHEATHING 11/17/2023 APPROVED FWILLIS
WALL SHEATHING 11/17/2023 APPROVED FWILLIS
MONOLITHIC SLAB 11/02/2023 APPROVED MKRASKI
PLUMBING 1ST ROUGH UNDERGROUND 10/30/2023 APPROVED JWALKER
Note: 10/27/2023 - PREVIOUS INSPECTION NOTES
FOUND SURVEY APPROVED (OFFICE) 10/27/2023 APPROVED TBAKER
PLUMBING 1ST ROUGH UNDERGROUND 10/27/2023 CANCELLED BY APPLICANT MGIBSON
WATER METER INSTALLATION REQUEST 10/06/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 12/11/2023 12/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/27/2023 10/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/27/2023 10/27/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 09/08/2023 10/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 09/07/2023 09/10/2023
Note: Released By: JPI
CUSVC COMPLETE 09/07/2023 09/11/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/07/2023 09/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/07/2023 09/08/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/07/2023 09/11/2023
LOCATE COMPLETE 09/07/2023 09/12/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 09/07/2023 09/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/07/2023 09/19/2023
Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM
ZON COMPLETE 09/07/2023 09/08/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN COMPLETE 09/07/2023 09/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 03/06/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
REINSPECTION RESIDENTIAL ¤40.00 02/28/2024
CONTRACTOR CHANGE ¤20.00 02/28/2024
CONTRACTOR CHANGE ¤20.00 02/28/2024
CONTRACTOR CHANGE ¤20.00 02/28/2024
CONTRACTOR CHANGE ¤20.00 02/28/2024
CONTRACTOR CHANGE ¤20.00 02/28/2024
CONTRACTOR CHANGE ¤20.00 02/28/2024
SW ENG REINSPECTION 20 ¤20.00 02/28/2024
FIRE IMPACT FEE ADMIN ¤12.62 09/25/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/25/2023
FC IMPACT FEE EMS ¤62.00 09/25/2023
IMPACT FEE FIRE ¤420.52 09/25/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/25/2023
FC IMPACT FEE LIBRARY ¤268.00 09/25/2023
IMPACT FEE PARKS ¤1,769.15 09/25/2023
IMPACT FEE SCHOOL ¤5,450.00 09/25/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 09/25/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/25/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/25/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/25/2023
SURCHARGE FS 533.721 ¤6.72 09/25/2023
SURCHARGE - FS 468.631 ¤10.07 09/25/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/25/2023
SW ENG INSPECTION 80 ¤80.00 09/25/2023
SW ENG PRE APRON ¤30.00 09/25/2023
CONNECTION FEES ¤1,166.26 09/25/2023
CONTRACTOR CHANGE ¤20.00 09/25/2023
WATER- TURN ON ¤25.00 09/25/2023
ADJUSTMENT 50% (¤671.58) 09/25/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/25/2023
INSPECTION - RESIDENTIAL ¤1,023.00 09/25/2023
PLAN REVIEW - RESIDENTIAL ¤290.16 09/25/2023
SW ENG - REVIEW 20 ¤20.00 09/25/2023
SW ENG RES REVIEW 200 ¤200.00 09/25/2023
TRANS IMPACT FEE ADMIN ¤54.36 09/25/2023
TRANS IMPACT FEE ADMIN (¤54.36) 09/25/2023
SEWER CREDIT (¤1,466.00) 09/25/2023
SEWER INSPECTION ¤25.00 09/25/2023
SEWER CAPITAL FACILITY ¤5,344.82 09/25/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 09/25/2023
SITE PLAN 30 ¤30.00 09/25/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,452.00