I want to search for...

Permit #2023090235

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0250
CONDITIONED SPACE: 2376 sqft
GARAGE: 776 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
PATIO/DECK (NO ROOF) : 474 sqft
OPENED PORCH (WITH ROOF) : 162 sqft
Total Square Footage: 3864 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 126 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/29/2023
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0250
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

WARLEY BELTRAME VITAL
Status Location Address State License Number Phone
INACTIVE

45 S WICKHAM RD SUITE A

MELBOURNE, FL 32904

CAC1820085 (Exp: 08/31/2024) 321-259-6070
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/26/2024 FINAL APPROVED BTAYLOR
Note: 6/21/2024 - PREVIOUS INSPECTION NOTES
ROW - FINAL APRON (AFTER POUR) 06/21/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - STORMWATER FINAL 06/21/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
U -UTILITY RESIDENTIAL FINAL 06/21/2024 FINAL APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/21/2024 9:50:46 AM *** 8inch man line valve in drive apron missing brass ID Tab-mason informed to acquire and attach Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 6/7/2024 1:08:50 PM *** has reclaim irrigation-no cross connection ALSO-REMOVE TRASH FROM PIT
BLD - BUILDING FINAL 06/21/2024 CANCELLED BY APPLICANT BTAYLOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/12/2024 APPROVED TPOLACEK
Note: Inspector Notes from Inspection 9270 04/12/24 PAVER RESTRAINTS ARE GOOD I WOULD RECCOMEND TO RUN THE PLATE TAMPER OVER THE BASE ONE MORE TIME BEFORE SETTING PAVERS. IT IS JUST A LITTLE LOOSE. I WILL APPROVE AS NOTED. Inspector Notes from Inspection 9270 04/12/24 PAVER RESTRAINTS ARE GOOD I WOULD RECCOMEND TO RUN THE PLATE TAMPER OVER THE BASE ONE MORE TIME BEFORE SETTING PAVERS. IT IS JUST A LITTLE LOOSE. I WILL APPROVE AS NOTED.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/12/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 06/07/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/7/2024 1:08:50 PM *** has reclaim irrigation-no cross connection ALSO-REMOVE TRASH FROM PIT
ELECTRIC - EARLY POWER 04/25/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 11-21-23 1. Emailed FPL at 9:13. 4-25-24 1. Emailed FPL at 3:18.
ROW- PRE-APRON (PRE-POUR) 04/12/2024 APPROVED - AS NOTED TPOLACEK
Note: 04/12/24 PAVER RESTRAINTS ARE GOOD I WOULD RECCOMEND TO RUN THE PLATE TAMPER OVER THE BASE ONE MORE TIME BEFORE SETTING PAVERS. IT IS JUST A LITTLE LOOSE. I WILL APPROVE AS NOTED.
ROW- PAVER RESTRAINTS 04/08/2024 APPROVED TPOLACEK
Note: 04/08/24 AT TIME OF INSPECTION, YOU ARE GOOD TO POUR PAVER RESTRAINTS, APRON AND SIDEWALK ONLY. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- PRE-APRON (PRE-POUR) 04/08/2024 APPROVED TPOLACEK
Note: 04/08/24 AT TIME OF INSPECTION, YOU ARE GOOD TO POUR PAVER RESTRAINTS, APRON AND SIDEWALK ONLY. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
TIE BEAM / LINTEL 03/18/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 01/23/2024 APPROVED BTAYLOR
INSULATION 01/09/2024 APPROVED BTAYLOR
ALL ROUGH 01/04/2024 APPROVED BTAYLOR
Note: 1/3/2024 - PREVIOUS INSPECTION NOTES
GRAVITY SEWER TEST 01/04/2024 APPROVED MGIBSON
U - SEWER TIE IN 01/04/2024 APPROVED MGIBSON
ALL ROUGH 01/03/2024 CANCELLED BY APPLICANT AGAETANO
ROOF VALLEY & METAL 12/06/2023 APPROVED BTAYLOR
ELECTRIC-TUG 11/21/2023 APPROVED - AS NOTED BTAYLOR
Note: 11-21-23 1. Emailed FPL at 9:13.
WALL SHEATHING 11/17/2023 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/16/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 11/14/2023 APPROVED TBAKER
TIE BEAM / LINTEL 11/09/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 10/31/2023 APPROVED RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 10/27/2023 APPROVED MGIBSON
FOOTER 10/12/2023 APPROVED MKRASKI
FOOTER 10/11/2023 CANCELLED BY APPLICANT BTAYLOR
WATER METER INSTALLATION REQUEST 10/05/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/13/2023 11/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/13/2023 11/13/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/28/2023 09/28/2023
Note: Released By: JPI
ZON COMPLETE 09/27/2023 09/27/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 09/27/2023 09/27/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
ENGIN1 COMPLETE 09/27/2023 09/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/27/2023 09/28/2023
Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM
URB COMPLETE 09/08/2023 09/14/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BLD HOLD 09/07/2023 09/10/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 09/07/2023 09/08/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/07/2023 09/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/07/2023 09/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/07/2023 09/11/2023
LOCATE COMPLETE 09/07/2023 09/12/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 09/07/2023 09/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/07/2023 09/19/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/07/2023 09/08/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Survey / site plan: Square ft of lot is incorrect should be 13447. Mechanical equiptment missing. Please include on the plan
BADMIN COMPLETE 09/07/2023 09/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 09/29/2023
WATER-METER ¤419.86 09/29/2023
ADJUSTMENT 50% (¤872.79) 09/29/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/29/2023
INSPECTION - RESIDENTIAL ¤1,336.50 09/29/2023
PLAN REVIEW - RESIDENTIAL ¤379.08 09/29/2023
CONNECTION FEES ¤25.00 09/29/2023
FIRE IMPACT FEE ADMIN ¤12.62 09/29/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/29/2023
FC IMPACT FEE EMS ¤62.00 09/29/2023
IMPACT FEE FIRE ¤420.52 09/29/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/29/2023
FC IMPACT FEE LIBRARY ¤268.00 09/29/2023
IMPACT FEE PARKS ¤1,769.15 09/29/2023
IMPACT FEE SCHOOL ¤5,450.00 09/29/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 09/29/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/29/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/29/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/29/2023
SURCHARGE FS 533.721 ¤8.73 09/29/2023
SURCHARGE - FS 468.631 ¤13.09 09/29/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/29/2023
SW ENG INSPECTION 80 ¤80.00 09/29/2023
SW ENG PRE APRON ¤30.00 09/29/2023
SW ENG - REVIEW 20 ¤20.00 09/29/2023
SW ENG RES REVIEW 200 ¤200.00 09/29/2023
TRANS IMPACT FEE ADMIN ¤99.33 09/29/2023
TRANS IMPACT FEE ADMIN (¤99.33) 09/29/2023
SEWER INSPECTION ¤25.00 09/29/2023
SEWER CAPITAL FACILITY ¤1,682.11 09/29/2023
WATER CAPITAL FACILITY FEE ¤1,398.48 09/29/2023
SITE PLAN 30 ¤30.00 09/29/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,854.12