Permit #2023090344

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00580-0090
Block: 00580
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 904-535-1680
Location Address: 24 RIVERDALE LN
Type: RF - REROOF
Issue Date: 09/11/2023
NOC: RECORDED
Applicant name: DANA SUE COOLEY
Owner: MENDOZA EUFROSINA P & CHRISTOPHER MENDOZA LIFE EST

Address

24 RIVERDALE LANE

PALM COAST, FL 32164

Lot: 0090
Contracted Stated Job Value: ¤6,500.00
Job Description: Reroof
Type: CN

Contractor

FIVE STAR ROOFING OF NORTHEAST FLORIDA INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680

Inspection History

Type Request Date Result Inspector
ROOF FINAL 09/26/2023 FINAL APPROVED JWALKER
ROOF AFFIDAVIT 09/25/2023 APPROVED MRAMOS
ROOF IN PROGRESS- MIDROOF 09/21/2023 APPROVED JWALKER
Note: 9/20/2023 - PREVIOUS INSPECTION NOTES 9/20/23 Field nailing has not been done. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 Field nailing of the underlayment has not been done. Synthetic underlayment is required to be fastened at 6" o.c. and 12"o.c. in the field. The shingles that have been installed on the right side garage roof will need to have a demo inspection done to ensure the underlayment has been correctly installed. Note below asked for no shingles to be installed. See RBC 903 for fastening requirements. 9/18/2023 - PREVIOUS INSPECTION NOTES 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved.
ROOF IN PROGRESS- MIDROOF 09/20/2023 Disapproved -FEE REQUIRED JWALKER
Note: 9/20/23 Field nailing has not been done. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 Field nailing of the underlayment has not been done. Synthetic underlayment is required to be fastened at 6" o.c. and 12"o.c. in the field. The shingles that have been installed on the right side garage roof will need to have a demo inspection done to ensure the underlayment has been correctly installed. Note below asked for no shingles to be installed. See RBC 903 for fastening requirements. 9/18/2023 - PREVIOUS INSPECTION NOTES 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved.
ROOF IN PROGRESS- MIDROOF 09/19/2023 Disapproved -FEE REQUIRED JWALKER
Note: 9/19/23 Field nailing of the underlayment has not been done. Synthetic underlayment is required to be fastened at 6" o.c. and 12"o.c. in the field. The shingles that have been installed on the right side garage roof will need to have a demo inspection done to ensure the underlayment has been correctly installed. Note below asked for no shingles to be installed. See RBC 903 for fastening requirements. 9/18/2023 - PREVIOUS INSPECTION NOTES 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved.
ROOF IN PROGRESS- MIDROOF 09/18/2023 Disapproved - NO FEE JWALKER
Note: 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 09/25/2023
REINSPECTION RESIDENTIAL ¤40.00 09/19/2023
SURCHARGE FS 533.721 ¤2.00 09/11/2023
SURCHARGE - FS 468.631 ¤2.00 09/11/2023
ADJUSTMENT 50% (¤45.00) 09/11/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/11/2023
INSPECTION - RESIDENTIAL ¤60.00 09/11/2023
Fees Total Due: ¤0.00 Total Paid: ¤129.00