I want to search for...
Permit #2023090344
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00580-0090 |
| Block: 00580 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: 904-535-1680 |
| Location Address: 24 RIVERDALE LN |
| Type: RF - REROOF |
| Issue Date: 09/11/2023 |
| NOC: RECORDED |
| Applicant name: DANA SUE COOLEY |
| Owner: MENDOZA EUFROSINA P & CHRISTOPHER MENDOZA LIFE EST |
|
Address 24 RIVERDALE LANE PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤6,500.00 |
| Job Description: Reroof |
| Type: CN |
Contractor
FIVE STAR ROOFING OF NORTHEAST FLORIDA INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 09/26/2023 | FINAL APPROVED | JWALKER |
| ROOF AFFIDAVIT | 09/25/2023 | APPROVED | MRAMOS |
| ROOF IN PROGRESS- MIDROOF | 09/21/2023 | APPROVED | JWALKER |
| Note: 9/20/2023 - PREVIOUS INSPECTION NOTES 9/20/23 Field nailing has not been done. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 Field nailing of the underlayment has not been done. Synthetic underlayment is required to be fastened at 6" o.c. and 12"o.c. in the field. The shingles that have been installed on the right side garage roof will need to have a demo inspection done to ensure the underlayment has been correctly installed. Note below asked for no shingles to be installed. See RBC 903 for fastening requirements. 9/18/2023 - PREVIOUS INSPECTION NOTES 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved. | |||
| ROOF IN PROGRESS- MIDROOF | 09/20/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 9/20/23 Field nailing has not been done. 9/19/2023 - PREVIOUS INSPECTION NOTES 9/19/23 Field nailing of the underlayment has not been done. Synthetic underlayment is required to be fastened at 6" o.c. and 12"o.c. in the field. The shingles that have been installed on the right side garage roof will need to have a demo inspection done to ensure the underlayment has been correctly installed. Note below asked for no shingles to be installed. See RBC 903 for fastening requirements. 9/18/2023 - PREVIOUS INSPECTION NOTES 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved. | |||
| ROOF IN PROGRESS- MIDROOF | 09/19/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 9/19/23 Field nailing of the underlayment has not been done. Synthetic underlayment is required to be fastened at 6" o.c. and 12"o.c. in the field. The shingles that have been installed on the right side garage roof will need to have a demo inspection done to ensure the underlayment has been correctly installed. Note below asked for no shingles to be installed. See RBC 903 for fastening requirements. 9/18/2023 - PREVIOUS INSPECTION NOTES 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved. | |||
| ROOF IN PROGRESS- MIDROOF | 09/18/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Contractor marked off entire deck 2 layer synthetic on the product approval sheet.. The contractor installed 1 layer synthetic, however the plywood roof decking joints have not been sealed with the 4" self adhering tape. 2. All shingles and the existing underlayment will need to be removed and the joints taped as specifed on the product approval sheet and the RBC - 903. Do not install any shingles on the new roof underlayment until the full roof dryin has been approved. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/19/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/11/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/11/2023 |
| ADJUSTMENT 50% | (¤45.00) | 09/11/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/11/2023 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 09/11/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤129.00 |