I want to search for...

Permit #2023090433

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00620-0120
GARAGE: 797 sqft
CONDITIONED SPACE: 2298 sqft
OPENED PORCH (WITH ROOF) : 365 sqft
OPENED PORCH (WITH ROOF) : 88 sqft
Total Square Footage: 3548 sqft
Block: 00620
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: 386-931-5935
Location Address: 63 UNDERSHIRE PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/03/2023
NOC: RECORDED
Applicant name: RYAN JAMES PERRY
Owner: DURKIN JAMES & SANDRA H&W

Address

148 KENDALL AVENUE

PITTSBURGH, PA 15202

Lot: 0120
Contracted Stated Job Value: ¤500,000.00
Job Description: Single Family Residence
Type: CN

Contractor

WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
Status Location Address State License Number Phone
ACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CBC1263021 (Exp: 08/31/2026) 386-931-5395

Sub Contractors

RYAN JAMES PERRY
Status Location Address State License Number Phone
INACTIVE

10 BISCAYNE DRIVE

PALM COAST, FL 32137

CCC1334569 (Exp: 08/31/2026) 386-931-5935
DILLON CARRERAS
Status Location Address State License Number
ACTIVE

3504 LUNDY ROAD

PALATKA, FL 32177

EC13010133 (Exp: 08/31/2026)
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/05/2024 Approval - Private Provider PPROVIDER
ROW - FINAL APRON (AFTER POUR) 11/05/2024 APPROVED FSLADISH
Note: 11/5/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 11/05/2024 APPROVED FSLADISH
Note: 11/5/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 11/05/2024 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 IRR with well. No CC
ROW FIELD SURVEY /GRADING CERTIFICATION 11/04/2024 APPROVED FSLADISH
Note: 11/4/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 11/1/24 ELEVATION CORRECTIONS MADE ON LATEST FINAL SURVEY AT THE TIME OF THIS INSPECTION. REAR YARD DRAINAGE ACCEPTABLE AS IT WILL DRAIN DOWN AND RIGHT TOWARD UNDERWOOD. WHEN VACANT IS BUILT ON IN REAR NEED TO MAKE SURE DRAINAGE PATTERN IS PARALLEL. APPROVING AS NOTED ________________________________________________________________________________________________________________________ 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 YOUR SURVEY SHOWS ELEVATIONS ON THE REAR CORNERS OF THE STRUCTURE AT 25.00 AND 25.11. YOU ARE REQUIRED TO BE A MINIMUM OF 4" BELOW FFE FOR BLOCK AND 6" FOR WOOD. YOUR ELEVATION MUBERS IN THE REAR SHOW ALL DRAINAGE FALLING BACK ONTO THE REAR ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. YOUR SWALE ELEVATION SHOTS ARE INCONSISTENT. YOUR DRAINAGE FLOWS FROM LEFT TO RIGHT FROM UNDERSHIRE AROUND THE CORNER TO UNDERWOOD. THE LAST ELEVATION SHOT ON UNDERSHIRE SHOWS A 22.39 AND THEN AROUND THE CORNER YOUR NEXT SWALE SHOT IS 22.48 GOING UPHILL AND UP AND DOWN THROUGHOUT THE SWALE CAUSING DRAINAGE TO POOL HERE AND NOT FLOW. YOU NEED TO PROVIDE FFE FOR ADJOINING OCCUPIED PROPERTY Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. FFE of adjacent improved properties. (F) Inspector Notes from Inspection 9270 4/25/24 CORRECTIOONS MADE. PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 4/18/2024 - PREVIOUS INSPECTION NOTES 04/18/24 THERE IS NO REBAR ON SITE FOR FOOTERS One (1) #4 rebar, a with a minimum length equal to the width of the culvert is required in the center of the footer. (A) ** DRIVEWAY FACE BOARD IS SET TOO FAR BEHIND EDGE OF ROAD. PIPE MUST BE SET 8' FROM EXISTING RDGE OF ROAD. ** CULVERT PIPE FROM EDGE OF DRIVEWAY TO MITERED CUT CAN BE NO LONGER THAN 18" MINIMUM 6" PLEASE MAKE CORRECTIONS BEFORE RESUBMITTING INSPECTION.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/01/2024 APPROVED - AS NOTED FSLADISH
Note: 11/1/24 ELEVATION CORRECTIONS MADE ON LATEST FINAL SURVEY AT THE TIME OF THIS INSPECTION. REAR YARD DRAINAGE ACCEPTABLE AS IT WILL DRAIN DOWN AND RIGHT TOWARD UNDERWOOD. WHEN VACANT IS BUILT ON IN REAR NEED TO MAKE SURE DRAINAGE PATTERN IS PARALLEL. APPROVING AS NOTED ________________________________________________________________________________________________________________________ 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 YOUR SURVEY SHOWS ELEVATIONS ON THE REAR CORNERS OF THE STRUCTURE AT 25.00 AND 25.11. YOU ARE REQUIRED TO BE A MINIMUM OF 4" BELOW FFE FOR BLOCK AND 6" FOR WOOD. YOUR ELEVATION MUBERS IN THE REAR SHOW ALL DRAINAGE FALLING BACK ONTO THE REAR ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. YOUR SWALE ELEVATION SHOTS ARE INCONSISTENT. YOUR DRAINAGE FLOWS FROM LEFT TO RIGHT FROM UNDERSHIRE AROUND THE CORNER TO UNDERWOOD. THE LAST ELEVATION SHOT ON UNDERSHIRE SHOWS A 22.39 AND THEN AROUND THE CORNER YOUR NEXT SWALE SHOT IS 22.48 GOING UPHILL AND UP AND DOWN THROUGHOUT THE SWALE CAUSING DRAINAGE TO POOL HERE AND NOT FLOW. YOU NEED TO PROVIDE FFE FOR ADJOINING OCCUPIED PROPERTY Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. FFE of adjacent improved properties. (F) Inspector Notes from Inspection 9270 4/25/24 CORRECTIOONS MADE. PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 4/18/2024 - PREVIOUS INSPECTION NOTES 04/18/24 THERE IS NO REBAR ON SITE FOR FOOTERS One (1) #4 rebar, a with a minimum length equal to the width of the culvert is required in the center of the footer. (A) ** DRIVEWAY FACE BOARD IS SET TOO FAR BEHIND EDGE OF ROAD. PIPE MUST BE SET 8' FROM EXISTING RDGE OF ROAD. ** CULVERT PIPE FROM EDGE OF DRIVEWAY TO MITERED CUT CAN BE NO LONGER THAN 18" MINIMUM 6" PLEASE MAKE CORRECTIONS BEFORE RESUBMITTING INSPECTION.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/15/2024 Disapproved - NO FEE FSLADISH
Note: 10/15/24 YOUR SURVEY SHOWS ELEVATIONS ON THE REAR CORNERS OF THE STRUCTURE AT 25.00 AND 25.11. YOU ARE REQUIRED TO BE A MINIMUM OF 4" BELOW FFE FOR BLOCK AND 6" FOR WOOD. YOUR ELEVATION MUBERS IN THE REAR SHOW ALL DRAINAGE FALLING BACK ONTO THE REAR ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. YOUR SWALE ELEVATION SHOTS ARE INCONSISTENT. YOUR DRAINAGE FLOWS FROM LEFT TO RIGHT FROM UNDERSHIRE AROUND THE CORNER TO UNDERWOOD. THE LAST ELEVATION SHOT ON UNDERSHIRE SHOWS A 22.39 AND THEN AROUND THE CORNER YOUR NEXT SWALE SHOT IS 22.48 GOING UPHILL AND UP AND DOWN THROUGHOUT THE SWALE CAUSING DRAINAGE TO POOL HERE AND NOT FLOW. YOU NEED TO PROVIDE FFE FOR ADJOINING OCCUPIED PROPERTY Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" Roadside swale. Sec.300.01 C2 Sec.300.01 C2 "The tolerance on individual shots along the as-built flow line of the swale (depressions or high spots) is plus or minus 0.10 feet.Sec.300.01 C2" 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. FFE of adjacent improved properties. (F) Inspector Notes from Inspection 9270 4/25/24 CORRECTIOONS MADE. PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 4/18/2024 - PREVIOUS INSPECTION NOTES 04/18/24 THERE IS NO REBAR ON SITE FOR FOOTERS One (1) #4 rebar, a with a minimum length equal to the width of the culvert is required in the center of the footer. (A) ** DRIVEWAY FACE BOARD IS SET TOO FAR BEHIND EDGE OF ROAD. PIPE MUST BE SET 8' FROM EXISTING RDGE OF ROAD. ** CULVERT PIPE FROM EDGE OF DRIVEWAY TO MITERED CUT CAN BE NO LONGER THAN 18" MINIMUM 6" PLEASE MAKE CORRECTIONS BEFORE RESUBMITTING INSPECTION.
U-CROSS CONNECTION 10/08/2024 APPROVED - AS NOTED BWRIGHT
Note: IRR with well. No CC
ELECTRIC - EARLY POWER 06/13/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 04/25/2024 APPROVED - AS NOTED FSLADISH
Note: 4/25/24 CORRECTIOONS MADE. PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 4/18/2024 - PREVIOUS INSPECTION NOTES 04/18/24 THERE IS NO REBAR ON SITE FOR FOOTERS One (1) #4 rebar, a with a minimum length equal to the width of the culvert is required in the center of the footer. (A) ** DRIVEWAY FACE BOARD IS SET TOO FAR BEHIND EDGE OF ROAD. PIPE MUST BE SET 8' FROM EXISTING RDGE OF ROAD. ** CULVERT PIPE FROM EDGE OF DRIVEWAY TO MITERED CUT CAN BE NO LONGER THAN 18" MINIMUM 6" PLEASE MAKE CORRECTIONS BEFORE RESUBMITTING INSPECTION.
ROW- PRE-APRON (PRE-POUR) 04/18/2024 Disapproved - NO FEE TPOLACEK
Note: 04/18/24 THERE IS NO REBAR ON SITE FOR FOOTERS One (1) #4 rebar, a with a minimum length equal to the width of the culvert is required in the center of the footer. (A) ** DRIVEWAY FACE BOARD IS SET TOO FAR BEHIND EDGE OF ROAD. PIPE MUST BE SET 8' FROM EXISTING RDGE OF ROAD. ** CULVERT PIPE FROM EDGE OF DRIVEWAY TO MITERED CUT CAN BE NO LONGER THAN 18" MINIMUM 6" PLEASE MAKE CORRECTIONS BEFORE RESUBMITTING INSPECTION. SEE ATTACHED PHOTOS
GRAVITY SEWER TEST 04/15/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 04/15/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 02/12/2024 Approval - Private Provider PPROVIDER
INSULATION 02/12/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 02/06/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 01/24/2024 Approval - Private Provider PPROVIDER
TIE DOWN 01/24/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 01/17/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/17/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 12/28/2023 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 12/20/2023 APPROVED TBAKER
TIE BEAM / LINTEL 12/14/2023 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 12/01/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 11/14/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/24/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/19/2023 12/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/19/2023 12/19/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 10/02/2023 10/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 10/02/2023 10/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 09/21/2023 09/21/2023
Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 09/20/2023 09/20/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC HOLD 09/20/2023 09/25/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The living space needs to be done with the 3 volt amp calculation. NEC 2017 220
SW1 HOLD 09/20/2023 09/21/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)?The subject lots drainage must not negatively impact any adjacent property. (B)
ENGIN1 COMPLETE 09/20/2023 09/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 09/20/2023 09/22/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
BLD COMPLETE 09/12/2023 09/12/2023
Note: Released By: JPI
CUSVC COMPLETE 09/12/2023 09/13/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 09/12/2023 09/14/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical load calcs need to have the living space included. NEC 2017 220
ENGIN1 COMPLETE 09/12/2023 09/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/12/2023 09/13/2023
LOCATE COMPLETE 09/12/2023 09/18/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 09/12/2023 09/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 09/12/2023 09/19/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation
ZON HOLD 09/12/2023 09/12/2023
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. MINIMUM # TREES NOT MET 2. BEDROOM 2 LABELED INCORRECTLY (DUPLICATE)
BADMIN COMPLETE 09/12/2023 09/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 09/12/2023 10/31/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE - RESID PP ¤225.00 11/11/2024
INSPECTION - RESIDENTIAL ¤1,375.00 10/03/2023
PLAN REVIEW - RESIDENTIAL ¤390.00 10/03/2023
CONNECTION FEES ¤1,166.26 10/03/2023
FC IMPACT FEE EMS ¤62.00 10/03/2023
IMPACT FEE FIRE ¤420.52 10/03/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/03/2023
FC IMPACT FEE LIBRARY ¤268.00 10/03/2023
IMPACT FEE PARKS ¤1,769.15 10/03/2023
IMPACT FEE SCHOOL ¤5,450.00 10/03/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 10/03/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/03/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/03/2023
SURCHARGE FS 533.721 ¤8.98 10/03/2023
SURCHARGE - FS 468.631 ¤13.46 10/03/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/03/2023
SW ENG INSPECTION 80 ¤80.00 10/03/2023
SW ENG PRE APRON ¤30.00 10/03/2023
SW ENG - REVIEW 20 ¤20.00 10/03/2023
SW ENG RES REVIEW 200 ¤200.00 10/03/2023
SEWER CREDIT (¤850.00) 10/03/2023
SEWER INSPECTION ¤25.00 10/03/2023
SEWER CAPITAL FACILITY ¤5,344.82 10/03/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 10/03/2023
SITE PLAN 30 ¤30.00 10/03/2023
WATER-METER ¤505.39 10/03/2023
WATER- TURN ON ¤25.00 10/03/2023
WATER- TURN ON ¤25.00 10/03/2023
ADJUSTMENT 50% (¤897.50) 10/03/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/03/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,739.96