Permit #2023090646

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00380-0170
CONDITIONED SPACE: 1500 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 119 sqft
Total Square Footage: 2015 sqft
Block: 00380
Subdivision: 2155 - SECTION 32-ROYAL PALMS
Job Phone: 202-494-2019
Location Address: 9 RUSSKIN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/02/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD SUITE 220

ORLANDO, FL 32803

Lot: 0170
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/09/2024 FINAL APPROVED AGAETANO
Note: 5/8/2024 - PREVIOUS INSPECTION NOTES 5/7/2024 - PREVIOUS INSPECTION NOTES 5/6/2024 - PREVIOUS INSPECTION NOTES 5/3/2024 - PREVIOUS INSPECTION NOTES 05-06-2024 Doors locked. Need access for inspection. 05-07-2024 1. Garage walls not sealed. 2. Kitchen supply not installed at ceiling. 3. Heat label not indicated at AHU. 4. Seal AHU duct at ceiling. 5.Anti tilt. Not ready. A complete inspection is required for final inspection. 05-08-2024 Above issue has not been resolved. Garage walls not sealed.• Garage penetrations sealed FBC R302.6
BLD - BUILDING FINAL 05/08/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 5/7/2024 - PREVIOUS INSPECTION NOTES 5/6/2024 - PREVIOUS INSPECTION NOTES 5/3/2024 - PREVIOUS INSPECTION NOTES 05-06-2024 Doors locked. Need access for inspection. 05-07-2024 1. Garage walls not sealed. 2. Kitchen supply not installed at ceiling. 3. Heat label not indicated at AHU. 4. Seal AHU duct at ceiling. 5.Anti tilt. Not ready. A complete inspection is required for final inspection. 05-08-2024 Above issue has not been resolved. Garage walls not sealed.• Garage penetrations sealed FBC R302.6
BLD - BUILDING FINAL 05/07/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES 5/3/2024 - PREVIOUS INSPECTION NOTES 05-06-2024 Doors locked. Need access for inspection. 05-07-2024 1. Garage walls not sealed. 2. Kitchen supply not installed at ceiling. 3. Heat label not indicated at AHU. 4. Seal AHU duct at ceiling. 5.Anti tilt. Not ready. A complete inspection is required for final inspection.
BLD - BUILDING FINAL 05/06/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 5/3/2024 - PREVIOUS INSPECTION NOTES 05-06-2024 Doors locked. Need access for inspection.
ROW - FINAL APRON (AFTER POUR) 05/06/2024 APPROVED TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/6/2024 1:01:28 PM *** PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/3/2024 9:37:46 AM *** Pipe is full of sediment and needs to be cleaned out. Large chip on right side should be repaired Inspector Notes from Inspection 9465 05/02/24 ALTHOUGH IT WILL WORK AS INDICATED ON FINAL SURVEY I BELIEVE IT WOULD HAVE BEEN MORE BENIFICIAL TO CREATE A COMMON SWALE ON THE LEFT SIDE FROM THE FENCE FORWARD. THE FFE ON BOTH HOMES IS HIGH ENOUGH TO HAVE ACCOMPLISHED A COMMON SWALE WITHOUT THE USE OF THE BERM. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 05/06/2024 APPROVED TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/6/2024 1:02:06 PM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/3/2024 9:38:31 AM *** Trash around yard needs to be cleaned up before row will be approved Inspector Notes from Inspection 9465 05/02/24 ALTHOUGH IT WILL WORK AS INDICATED ON FINAL SURVEY I BELIEVE IT WOULD HAVE BEEN MORE BENIFICIAL TO CREATE A COMMON SWALE ON THE LEFT SIDE FROM THE FENCE FORWARD. THE FFE ON BOTH HOMES IS HIGH ENOUGH TO HAVE ACCOMPLISHED A COMMON SWALE WITHOUT THE USE OF THE BERM. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 05/03/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/3/2024 1:09:59 PM *** raise sewer C/O so not covered over by growing sod(make flush)-pic to me when completed
ROW - STORMWATER FINAL 05/03/2024 Disapproved - NO FEE TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 9:38:31 AM *** Trash around yard needs to be cleaned up before row will be approved Inspector Notes from Inspection 9465 05/02/24 ALTHOUGH IT WILL WORK AS INDICATED ON FINAL SURVEY I BELIEVE IT WOULD HAVE BEEN MORE BENIFICIAL TO CREATE A COMMON SWALE ON THE LEFT SIDE FROM THE FENCE FORWARD. THE FFE ON BOTH HOMES IS HIGH ENOUGH TO HAVE ACCOMPLISHED A COMMON SWALE WITHOUT THE USE OF THE BERM. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 05/03/2024 Disapproved - NO FEE TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 9:37:46 AM *** Pipe is full of sediment and needs to be cleaned out. Large chip on right side should be repaired Inspector Notes from Inspection 9465 05/02/24 ALTHOUGH IT WILL WORK AS INDICATED ON FINAL SURVEY I BELIEVE IT WOULD HAVE BEEN MORE BENIFICIAL TO CREATE A COMMON SWALE ON THE LEFT SIDE FROM THE FENCE FORWARD. THE FFE ON BOTH HOMES IS HIGH ENOUGH TO HAVE ACCOMPLISHED A COMMON SWALE WITHOUT THE USE OF THE BERM. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION 05/03/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/3/2024 1:09:00 PM *** no irr-no cross connection
BLD - BUILDING FINAL 05/03/2024 CANCELLED BY APPLICANT AGAETANO
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/02/2024 APPROVED TPOLACEK
Note: 05/02/24 --------------------------------------------------------------------------------------- Inspector Notes from Inspection 9270 ** 04/10/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW FIELD SURVEY /GRADING CERTIFICATION 05/02/2024 APPROVED - AS NOTED TPOLACEK
Note: 05/02/24 ALTHOUGH IT WILL WORK AS INDICATED ON FINAL SURVEY I BELIEVE IT WOULD HAVE BEEN MORE BENIFICIAL TO CREATE A COMMON SWALE ON THE LEFT SIDE FROM THE FENCE FORWARD. THE FFE ON BOTH HOMES IS HIGH ENOUGH TO HAVE ACCOMPLISHED A COMMON SWALE WITHOUT THE USE OF THE BERM. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 04/10/2024 APPROVED - AS NOTED EMADISON
Note: ** 04/10/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ELECTRIC - EARLY POWER 04/04/2024 APPROVED RMARTIN
GRAVITY SEWER TEST 03/06/2024 APPROVED MGIBSON
U - SEWER TIE IN 03/06/2024 APPROVED MGIBSON
INSULATION 02/16/2024 APPROVED JWALKER
Note: 2/15/2024 - PREVIOUS INSPECTION NOTES 2/15/24 Item 1 dryer duct mechanical joint are to be sealed. 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 1. Depth gauges for the blowin insulation in the attic space have not been installed. 2. Item 1 listed below has not been corrected. 2/9/24 1. Dryer duct has not been seal at the mechanical joints. 2. Approved duct layout needs to be onsite Check for listed corrections above at the insulation inspection. 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24 1. The dryer duct mechanical joints have not been sealed. 2. Water distribution piping is not under test. 3. Please have the approved duct layout onsite at reinspection 4. The item listed below from the previous inspection has not been corrected. Support and anchor the ridge beam. Inspector Notes from Inspection 2460 1/22/24 Item 2 listed below has not been corrected check for correction at the ALL Rough inspection. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. .
INSULATION 02/15/2024 Disapproved -FEE REQUIRED JWALKER
Note: 2/15/24 Item 1 dryer duct mechanical joint are to be sealed. 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 1. Depth gauges for the blowin insulation in the attic space have not been installed. 2. Item 1 listed below has not been corrected. 2/9/24 1. Dryer duct has not been seal at the mechanical joints. 2. Approved duct layout needs to be onsite Check for listed corrections above at the insulation inspection. 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24 1. The dryer duct mechanical joints have not been sealed. 2. Water distribution piping is not under test. 3. Please have the approved duct layout onsite at reinspection 4. The item listed below from the previous inspection has not been corrected. Support and anchor the ridge beam. Inspector Notes from Inspection 2460 1/22/24 Item 2 listed below has not been corrected check for correction at the ALL Rough inspection. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. .
INSULATION 02/13/2024 Disapproved - NO FEE JWALKER
Note: 2/13/24 1. Depth gauges for the blowin insulation in the attic space have not been installed. 2. Item 1 listed below has not been corrected. 2/9/24 1. Dryer duct has not been seal at the mechanical joints. 2. Approved duct layout needs to be onsite Check for listed corrections above at the insulation inspection. 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24 1. The dryer duct mechanical joints have not been sealed. 2. Water distribution piping is not under test. 3. Please have the approved duct layout onsite at reinspection 4. The item listed below from the previous inspection has not been corrected. Support and anchor the ridge beam. Inspector Notes from Inspection 2460 1/22/24 Item 2 listed below has not been corrected check for correction at the ALL Rough inspection. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. .
ALL ROUGH 02/09/2024 APPROVED - AS NOTED JWALKER
Note: 2/9/24 1. Dryer duct has not been seal at the mechanical joints. 2. Approved duct layout needs to be onsite Check for listed corrections above at the insulation inspection. 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24 1. The dryer duct mechanical joints have not been sealed. 2. Water distribution piping is not under test. 3. Please have the approved duct layout onsite at reinspection 4. The item listed below from the previous inspection has not been corrected. Support and anchor the ridge beam. Inspector Notes from Inspection 2460 1/22/24 Item 2 listed below has not been corrected check for correction at the ALL Rough inspection. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. .
LATH/BRICK/ WATER BARRIER 02/02/2024 APPROVED JWALKER
ALL ROUGH 02/01/2024 Disapproved - NO FEE JWALKER
Note: 2/1/24 1. The dryer duct mechanical joints have not been sealed. 2. Water distribution piping is not under test. 3. Please have the approved duct layout onsite at reinspection 4. The item listed below from the previous inspection has not been corrected. Support and anchor the ridge beam. Inspector Notes from Inspection 2460 1/22/24 Item 2 listed below has not been corrected check for correction at the ALL Rough inspection. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. .
ROW - DRAINAGE 01/26/2024 APPROVED PFLANAGAN
Note: CORRECTIONS FIXED ------------------------------------------------------------------------- 1/25/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO RE-ESTABLISH SILT FENCE AROUND PROPERTY YOU HAVE HAD OF TIME TO FIX ALL AREAS THERE IS NOW A INSPECTION HOLD ON THIS CONSTRUCTION SITE ---------------------------------------------------------------------------------------- 1/24/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO RE-ESTABLISH SILT FENCE AROUND PROPERTY LINE --------------------------------------------------------------------------------------- 1/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAR ALL DIRT AND SEDIMENT IN THE ROADSIDE SWALE AND IN FRONT OF TEMP. CULVERT SO WATER WILL TO OUTFALL. 2) NEED TO PICK ALL TRASH IN THE CONSTRUCTION SITE 3) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY AND AT THE FRONT PROPERTY LINE AND LEAVE A ENTRANCE TO YOUR LOT. THIS WILL PROVENT AND MORE SEDIMENT GOING INTO ROADSIDE SWALE AND KEEP THE FLOW OPEN AT ALL TIMES OF THE CONSTRUCTION. 4) IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN THIS IS REQUIRED BY STATE LAW AND COMES WITH BIG FINES IF NO ACTIONS ARE DONE. YOU WILL HAV 7 DAYS TO FIX ALL AREAS LISTED ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS CONSTRUCTION SITE. NEXT INSPECTION 1/24/24 ----------------------------------------------------------------------------------------------------------------- CITIZEN AT 9 RUSSKIN SAYS THAT NEW CONSTUCTION IS PREVENTING DRAINAGE & ALGAE IS GROWING. MH
ROW - DRAINAGE 01/25/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO RE-ESTABLISH SILT FENCE AROUND PROPERTY YOU HAVE HAD OF TIME TO FIX ALL AREAS THERE IS NOW A INSPECTION HOLD ON THIS CONSTRUCTION SITE ---------------------------------------------------------------------------------------- 1/24/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO RE-ESTABLISH SILT FENCE AROUND PROPERTY LINE --------------------------------------------------------------------------------------- 1/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAR ALL DIRT AND SEDIMENT IN THE ROADSIDE SWALE AND IN FRONT OF TEMP. CULVERT SO WATER WILL TO OUTFALL. 2) NEED TO PICK ALL TRASH IN THE CONSTRUCTION SITE 3) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY AND AT THE FRONT PROPERTY LINE AND LEAVE A ENTRANCE TO YOUR LOT. THIS WILL PROVENT AND MORE SEDIMENT GOING INTO ROADSIDE SWALE AND KEEP THE FLOW OPEN AT ALL TIMES OF THE CONSTRUCTION. 4) IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN THIS IS REQUIRED BY STATE LAW AND COMES WITH BIG FINES IF NO ACTIONS ARE DONE. YOU WILL HAV 7 DAYS TO FIX ALL AREAS LISTED ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS CONSTRUCTION SITE. NEXT INSPECTION 1/24/24 ----------------------------------------------------------------------------------------------------------------- CITIZEN AT 9 RUSSKIN SAYS THAT NEW CONSTUCTION IS PREVENTING DRAINAGE & ALGAE IS GROWING. MH
ROW - DRAINAGE 01/24/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: STILL NEED TO RE-ESTABLISH SILT FENCE AROUND PROPERTY LINE --------------------------------------------------------------------------------------- 1/17/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAR ALL DIRT AND SEDIMENT IN THE ROADSIDE SWALE AND IN FRONT OF TEMP. CULVERT SO WATER WILL TO OUTFALL. 2) NEED TO PICK ALL TRASH IN THE CONSTRUCTION SITE 3) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY AND AT THE FRONT PROPERTY LINE AND LEAVE A ENTRANCE TO YOUR LOT. THIS WILL PROVENT AND MORE SEDIMENT GOING INTO ROADSIDE SWALE AND KEEP THE FLOW OPEN AT ALL TIMES OF THE CONSTRUCTION. 4) IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN THIS IS REQUIRED BY STATE LAW AND COMES WITH BIG FINES IF NO ACTIONS ARE DONE. YOU WILL HAV 7 DAYS TO FIX ALL AREAS LISTED ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS CONSTRUCTION SITE. NEXT INSPECTION 1/24/24 ----------------------------------------------------------------------------------------------------------------- CITIZEN AT 9 RUSSKIN SAYS THAT NEW CONSTUCTION IS PREVENTING DRAINAGE & ALGAE IS GROWING. MH
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/22/2024 APPROVED - AS NOTED JWALKER
Note: 1/22/24 Item 2 listed below has not been corrected check for correction at the ALL Rough inspection. 1/17/2024 - PREVIOUS INSPECTION NOTES 1. The H10A anchors at the rear porch and the beams are concealed with plywood. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. 3. Front entry over framing. Hold down anchor is not nailed to truss below. 4. Trusses T-13, 14A, and 14 x2 are missing engineering. 5. Truss T01 right side of the building. Fornt and rear of the truss missing 1 of 2 required heta 20 anchors.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/17/2024 Disapproved - NO FEE JWALKER
Note: 1. The H10A anchors at the rear porch and the beams are concealed with plywood. 2. The over framing ridge beam at the rear porch needs to be supported below and anhcored. 3. Front entry over framing. Hold down anchor is not nailed to truss below. 4. Trusses T-13, 14A, and 14 x2 are missing engineering. 5. Truss T01 right side of the building. Fornt and rear of the truss missing 1 of 2 required heta 20 anchors.
ROOF VALLEY & METAL 01/17/2024 APPROVED JWALKER
ELECTRIC-TUG 01/16/2024 APPROVED JWALKER
ROW - DRAINAGE 01/12/2024 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO CLEAR ALL DIRT AND SEDIMENT IN THE ROADSIDE SWALE AND IN FRONT OF TEMP. CULVERT SO WATER WILL TO OUTFALL. 2) NEED TO PICK ALL TRASH IN THE CONSTRUCTION SITE 3) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY AND AT THE FRONT PROPERTY LINE AND LEAVE A ENTRANCE TO YOUR LOT. THIS WILL PROVENT AND MORE SEDIMENT GOING INTO ROADSIDE SWALE AND KEEP THE FLOW OPEN AT ALL TIMES OF THE CONSTRUCTION. 4) IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN THIS IS REQUIRED BY STATE LAW AND COMES WITH BIG FINES IF NO ACTIONS ARE DONE. YOU WILL HAV 7 DAYS TO FIX ALL AREAS LISTED ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS CONSTRUCTION SITE. NEXT INSPECTION 1/24/24 ----------------------------------------------------------------------------------------------------------------- CITIZEN AT 9 RUSSKIN SAYS THAT NEW CONSTUCTION IS PREVENTING DRAINAGE & ALGAE IS GROWING. MH
ROOF SHEATHING 01/10/2024 APPROVED JWALKER
WALL SHEATHING 01/10/2024 APPROVED JWALKER
TIE BEAM / LINTEL 12/27/2023 APPROVED JWALKER
Note: 12/22/2023 - PREVIOUS INSPECTION NOTES 1. Rear slider opening each side calls for (2) # 5 rebar to be installed. 2. The rear porch columns the vertical down rod rebar need to be centered and support to allow for proper concrete coverage. 12/21/2023 - PREVIOUS INSPECTION NOTES Prints are wet, torn and out of order.
TIE BEAM / LINTEL 12/22/2023 Disapproved -FEE REQUIRED JWALKER
Note: 1. Rear slider opening each side calls for (2) # 5 rebar to be installed. 2. The rear porch columns the vertical down rod rebar need to be centered and support to allow for proper concrete coverage. 12/21/2023 - PREVIOUS INSPECTION NOTES Prints are wet, torn and out of order.
TIE BEAM / LINTEL 12/21/2023 Disapproved - NO FEE JWALKER
Note: Prints are wet, torn and out of order.
FOUND SURVEY APPROVED (OFFICE) 12/21/2023 APPROVED TBAKER
MONOLITHIC SLAB 12/14/2023 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 12/11/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/14/2023 APPROVED BVITALE
Note: 11/7/2023 7:21:05 AM- PREVIOUS INSPECTION NOTES logs on property
WATER METER INSTALLATION REQUEST 11/06/2023 Disapproved -FEE REQUIRED CBOWERMASTER
Note: logs on property

Review History

Department Status Date In Date Out
BADMIN INFORMATION 04/30/2024 04/30/2024
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because prior inspection needed.
MECH COMPLETE 04/24/2024 04/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/21/2023 12/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/21/2023 12/21/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 12/13/2023 12/13/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON HOLD 12/13/2023 12/13/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Foundation survey must show the front setback from the closest point at front of home (the area by the entry that projects closer).
ZON COMPLETE 12/13/2023 12/13/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 12/13/2023 12/13/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ENGIN1 COMPLETE 10/30/2023 10/30/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/30/2023 11/13/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 10/30/2023 10/30/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 09/26/2023 09/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 09/18/2023 11/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 09/15/2023 09/16/2023
Note: Released By: JPI
CUSVC COMPLETE 09/15/2023 09/18/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/15/2023 09/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/15/2023 09/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/15/2023 09/18/2023
LOCATE COMPLETE 09/15/2023 09/18/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/15/2023 09/18/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs needs to be Daytona Beach
SW1 COMPLETE 09/15/2023 09/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/15/2023 09/15/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 09/15/2023 09/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/08/2024
REINSPECTION RESIDENTIAL ¤40.00 05/08/2024
REINSPECTION RESIDENTIAL ¤40.00 05/06/2024
REINSPECTION RESIDENTIAL ¤40.00 05/06/2024
REINSPECTION FEE ¤40.00 05/06/2024
SW ENG - INSPECTION 20 ¤20.00 05/06/2024
SW ENG - INSPECTION 20 ¤20.00 05/06/2024
SW ENG - INSPECTION 20 ¤20.00 05/06/2024
SW ENG - INSPECTION 20 ¤20.00 05/06/2024
PLAN REVIEW - REVISION ¤32.50 05/06/2024
REINSPECTION RESIDENTIAL ¤40.00 05/06/2024
SW ENG INSPECTION 80 ¤80.00 10/02/2023
SW ENG PRE APRON ¤30.00 10/02/2023
SW ENG - REVIEW 20 ¤20.00 10/02/2023
SW ENG RES REVIEW 200 ¤200.00 10/02/2023
TRANS IMPACT FEE ADMIN ¤54.36 10/02/2023
TRANS IMPACT FEE ADMIN (¤54.36) 10/02/2023
SEWER CREDIT (¤1,466.00) 10/02/2023
SEWER INSPECTION ¤25.00 10/02/2023
SEWER CAPITAL FACILITY ¤5,344.82 10/02/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 10/02/2023
SITE PLAN 30 ¤30.00 10/02/2023
SURCHARGE FS 533.721 ¤3.47 10/02/2023
SURCHARGE - FS 468.631 ¤5.20 10/02/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/02/2023
WATER- TURN ON ¤25.00 10/02/2023
ADJUSTMENT 50% (¤346.82) 10/02/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/02/2023
INSPECTION - RESIDENTIAL ¤517.00 10/02/2023
PLAN REVIEW - RESIDENTIAL ¤146.64 10/02/2023
CONNECTION FEES ¤1,166.26 10/02/2023
FIRE IMPACT FEE ADMIN ¤12.62 10/02/2023
FIRE IMPACT FEE ADMIN (¤12.62) 10/02/2023
FC IMPACT FEE EMS ¤62.00 10/02/2023
IMPACT FEE FIRE ¤420.52 10/02/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/02/2023
FC IMPACT FEE LIBRARY ¤268.00 10/02/2023
IMPACT FEE PARKS ¤1,769.15 10/02/2023
IMPACT FEE SCHOOL ¤5,450.00 10/02/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 10/02/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/02/2023
PARKS IMPACT FEE ADMIN ¤53.07 10/02/2023
PARKS IMPACT FEE ADMIN (¤53.07) 10/02/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,131.62