Permit #2023090673
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00270-0050 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00270 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 29 SLOGANEER TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/13/2023 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address PO BOX 770279 ORLANDO, FL 32877 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤277,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/12/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 08/08/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: IRR with potable water. PVB in place. No CC | |||
| ROW - FINAL APRON (AFTER POUR) | 08/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/8/24 PIPE ELEVATION IS GOOD. CUTS ARE MADE. CULVERTS CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. Inspector Notes from Inspection 9465 8/5/24 DUE TO TROPICAL STORM DEBBY LAYING DOWN A LARGE AMOUNT OF RAIN AT THE TIME OF THIS INSPECTION THERE ARE VERY WET CONDITIONS ON THE PROPERTY. IT DOES APPEAR THAT THE DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED THAT DEBBY IS CURRENTLY DROPPING A LARGE VOLUME OF RAIN. | |||
| ROW - STORMWATER FINAL | 08/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/8/24 WATER IN SWALE IS DUE TO #27 DAMNING THE SWALE WITH DIRT TO POUR CONCRETE. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/5/24 DUE TO TROPICAL STORM DEBBY LAYING DOWN A LARGE AMOUNT OF RAIN AT THE TIME OF THIS INSPECTION THERE ARE VERY WET CONDITIONS ON THE PROPERTY. IT DOES APPEAR THAT THE DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED THAT DEBBY IS CURRENTLY DROPPING A LARGE VOLUME OF RAIN. | |||
| U -UTILITY RESIDENTIAL FINAL | 08/08/2024 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/05/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION THERE WAS A GOOD BIT OF WATER IN THE CULVERT BUT CULVERT WAS SOLID SO PASSING AS NOTED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------ 7/8/2024 - PREVIOUS INSPECTION NOTES TEXT MESSAGE FROM DAN TO CANCEL INSPECTION ----------------------------------------------------------------------------- 7/2/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/05/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/5/24 DUE TO TROPICAL STORM DEBBY LAYING DOWN A LARGE AMOUNT OF RAIN AT THE TIME OF THIS INSPECTION THERE ARE VERY WET CONDITIONS ON THE PROPERTY. IT DOES APPEAR THAT THE DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED THAT DEBBY IS CURRENTLY DROPPING A LARGE VOLUME OF RAIN. | |||
| ELECTRIC-TUG | 07/25/2024 | CANCELLED BY INSPECTOR | BTAYLOR |
| Note: Inspector Notes from Inspection 2190 5-29-24 1. Emailed FPL at 11:19. | |||
| FLOOR / WALL PENETRATION | 07/25/2024 | APPROVED | BTAYLOR |
| ROW- PRE-APRON (PRE-POUR) | 07/09/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: AT THE TIME OF THE INSPECTION THERE WAS A GOOD BIT OF WATER IN THE CULVERT BUT CULVERT WAS SOLID SO PASSING AS NOTED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------ 7/8/2024 - PREVIOUS INSPECTION NOTES TEXT MESSAGE FROM DAN TO CANCEL INSPECTION ----------------------------------------------------------------------------- 7/2/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/08/2024 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: TEXT MESSAGE FROM DAN TO CANCEL INSPECTION ----------------------------------------------------------------------------- 7/2/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/02/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE. | |||
| ELECTRIC - EARLY POWER | 05/29/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-29-24 1. Emailed FPL at 11:19. | |||
| GRAVITY SEWER TEST | 05/03/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 05/03/2024 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 04/24/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2200 4-12-24 1. Emailed FPL at 8:26. | |||
| PEP TANK INSTALLATION REQUEST | 04/15/2024 | APPROVED | CBOWERMASTER |
| Note: 4/10/2024 8:47:19 AM- PREVIOUS INSPECTION NOTES dumpster | |||
| ELECTRIC-TUG | 04/12/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-12-24 1. Emailed FPL at 8:26. | |||
| PEP TANK INSTALLATION REQUEST | 04/09/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: dumpster | |||
| INSULATION | 04/02/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 3-28-24 1. Missing front door check at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 04/02/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 3-28-24 1. Missing front door check at insulation. | |||
| ALL ROUGH | 03/28/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-28-24 1. Missing front door check at insulation. | |||
| ROOF VALLEY & METAL | 03/21/2024 | APPROVED | BTAYLOR |
| WALL SHEATHING | 03/13/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/13/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 03/11/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/29/2024 | APPROVED | BTAYLOR |
| Note: 2/28/2024 - PREVIOUS INSPECTION NOTES 2-28-24 1. All drilled dowels pulled out. Cirtcled on plan. | |||
| TIE BEAM / LINTEL | 02/28/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-28-24 1. All drilled dowels pulled out. Cirtcled on plan. | |||
| MONOLITHIC SLAB | 02/16/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/12/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/24/2024 | APPROVED | BVITALE |
| WILDLIFE CHECK - ENVIRONMENTAL | 09/25/2023 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/10/2024 | 07/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/10/2024 | 07/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/11/2024 | 03/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/11/2024 | 03/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/11/2024 | 03/11/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/04/2024 | 01/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. You need to be more clear on whats changing. What are can lights in the seal. Documents seem to be the same besides the date stamped. | |||
| BLD | HOLD | 01/03/2024 | 01/04/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet must have a shop drawing approval stamp by engineer of record for the house. | |||
| SWALE | COMPLETE | 09/18/2023 | 11/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 09/18/2023 | 09/25/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 9/25/23 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| BLD | COMPLETE | 09/15/2023 | 09/16/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/15/2023 | 09/19/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/15/2023 | 09/18/2023 |
| LOCATE | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/15/2023 | 09/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 09/15/2023 | 09/18/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/12/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 08/12/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/15/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/15/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/15/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 02/02/2024 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 11/13/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 11/13/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/13/2023 |
| IMPACT FEE FIRE | ¤420.52 | 11/13/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/13/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/13/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 11/13/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/13/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/13/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/13/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/13/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 11/13/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 11/13/2023 |
| SURCHARGE FS 533.721 | ¤5.13 | 11/13/2023 |
| SURCHARGE - FS 468.631 | ¤7.69 | 11/13/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/13/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/13/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/13/2023 |
| SEWER INSPECTION | ¤25.00 | 11/13/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/13/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/13/2023 |
| SITE PLAN 30 | ¤30.00 | 11/13/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/13/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/13/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 11/13/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 11/13/2023 |
| WATER-METER | ¤505.39 | 11/13/2023 |
| WATER- TURN ON | ¤25.00 | 11/13/2023 |
| WATER- TURN ON | ¤25.00 | 11/13/2023 |
| ADJUSTMENT 50% | (¤512.73) | 11/13/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/13/2023 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 11/13/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 11/13/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/13/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,120.57 |