Permit #2023090673

Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00270-0050
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
Total Square Footage: 2942 sqft
Block: 00270
Subdivision: -
Job Phone: 831-383-2883
Location Address: 29 SLOGANEER TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/13/2023
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: FLORIDA SUN PARTNERS II LLC

Address

PO BOX 770279

ORLANDO, FL 32877

Lot: 0050
Contracted Stated Job Value: ¤277,000.00
Job Description: Single Family Residence
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/12/2024 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 08/08/2024 APPROVED - AS NOTED BWRIGHT
Note: IRR with potable water. PVB in place. No CC
ROW - FINAL APRON (AFTER POUR) 08/08/2024 APPROVED - AS NOTED FSLADISH
Note: 8/8/24 PIPE ELEVATION IS GOOD. CUTS ARE MADE. CULVERTS CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. Inspector Notes from Inspection 9465 8/5/24 DUE TO TROPICAL STORM DEBBY LAYING DOWN A LARGE AMOUNT OF RAIN AT THE TIME OF THIS INSPECTION THERE ARE VERY WET CONDITIONS ON THE PROPERTY. IT DOES APPEAR THAT THE DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED THAT DEBBY IS CURRENTLY DROPPING A LARGE VOLUME OF RAIN.
ROW - STORMWATER FINAL 08/08/2024 APPROVED - AS NOTED FSLADISH
Note: 8/8/24 WATER IN SWALE IS DUE TO #27 DAMNING THE SWALE WITH DIRT TO POUR CONCRETE. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/5/24 DUE TO TROPICAL STORM DEBBY LAYING DOWN A LARGE AMOUNT OF RAIN AT THE TIME OF THIS INSPECTION THERE ARE VERY WET CONDITIONS ON THE PROPERTY. IT DOES APPEAR THAT THE DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED THAT DEBBY IS CURRENTLY DROPPING A LARGE VOLUME OF RAIN.
U -UTILITY RESIDENTIAL FINAL 08/08/2024 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/05/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION THERE WAS A GOOD BIT OF WATER IN THE CULVERT BUT CULVERT WAS SOLID SO PASSING AS NOTED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------ 7/8/2024 - PREVIOUS INSPECTION NOTES TEXT MESSAGE FROM DAN TO CANCEL INSPECTION ----------------------------------------------------------------------------- 7/2/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/05/2024 APPROVED - AS NOTED FSLADISH
Note: 8/5/24 DUE TO TROPICAL STORM DEBBY LAYING DOWN A LARGE AMOUNT OF RAIN AT THE TIME OF THIS INSPECTION THERE ARE VERY WET CONDITIONS ON THE PROPERTY. IT DOES APPEAR THAT THE DRAINAGE WILL WORK AS INDICATED. APPROVING THIS FIELD SURVEY AS NOTED THAT DEBBY IS CURRENTLY DROPPING A LARGE VOLUME OF RAIN.
ELECTRIC-TUG 07/25/2024 CANCELLED BY INSPECTOR BTAYLOR
Note: Inspector Notes from Inspection 2190 5-29-24 1. Emailed FPL at 11:19.
FLOOR / WALL PENETRATION 07/25/2024 APPROVED BTAYLOR
ROW- PRE-APRON (PRE-POUR) 07/09/2024 APPROVED - AS NOTED PFLANAGAN
Note: AT THE TIME OF THE INSPECTION THERE WAS A GOOD BIT OF WATER IN THE CULVERT BUT CULVERT WAS SOLID SO PASSING AS NOTED IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------ 7/8/2024 - PREVIOUS INSPECTION NOTES TEXT MESSAGE FROM DAN TO CANCEL INSPECTION ----------------------------------------------------------------------------- 7/2/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE.
ROW- PRE-APRON (PRE-POUR) 07/08/2024 CANCELLED BY APPLICANT PFLANAGAN
Note: TEXT MESSAGE FROM DAN TO CANCEL INSPECTION ----------------------------------------------------------------------------- 7/2/2024 - PREVIOUS INSPECTION NOTES THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE.
ROW- PRE-APRON (PRE-POUR) 07/02/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE BENCHMARK IS GONE FROM THE EDGE OF ROAD. NEED TO RE-ESTABLISH THE BENCHMARK AT THE SAME LOCATION AND THE SAME ELEVATION SO WE CAN DO INSPECTION. IF THE BENCHMARK IS IN A DIFFERENT LOCATION OR A DIFFERNT ELEVATION NEED TO REVISE THE SITE PLAN AND HAVE THE SWALE PLAN DETAIL REVISED BEFORE NEXT PRE POUR INSPECTION IS DONE. SEC. 300.O1 A B PAR.9 THE BENCHMARK MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION CYCLE.
ELECTRIC - EARLY POWER 05/29/2024 APPROVED - AS NOTED BTAYLOR
Note: 5-29-24 1. Emailed FPL at 11:19.
GRAVITY SEWER TEST 05/03/2024 APPROVED MGIBSON
U - SEWER TIE IN 05/03/2024 APPROVED MGIBSON
ELECTRIC-TUG 04/24/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2200 4-12-24 1. Emailed FPL at 8:26.
PEP TANK INSTALLATION REQUEST 04/15/2024 APPROVED CBOWERMASTER
Note: 4/10/2024 8:47:19 AM- PREVIOUS INSPECTION NOTES dumpster
ELECTRIC-TUG 04/12/2024 APPROVED - AS NOTED BTAYLOR
Note: 4-12-24 1. Emailed FPL at 8:26.
PEP TANK INSTALLATION REQUEST 04/09/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: dumpster
INSULATION 04/02/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 3-28-24 1. Missing front door check at insulation.
LATH/BRICK/ WATER BARRIER 04/02/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 3-28-24 1. Missing front door check at insulation.
ALL ROUGH 03/28/2024 APPROVED - AS NOTED BTAYLOR
Note: 3-28-24 1. Missing front door check at insulation.
ROOF VALLEY & METAL 03/21/2024 APPROVED BTAYLOR
WALL SHEATHING 03/13/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/13/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 03/11/2024 APPROVED TBAKER
TIE BEAM / LINTEL 02/29/2024 APPROVED BTAYLOR
Note: 2/28/2024 - PREVIOUS INSPECTION NOTES 2-28-24 1. All drilled dowels pulled out. Cirtcled on plan.
TIE BEAM / LINTEL 02/28/2024 Disapproved - NO FEE BTAYLOR
Note: 2-28-24 1. All drilled dowels pulled out. Cirtcled on plan.
MONOLITHIC SLAB 02/16/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/12/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/24/2024 APPROVED BVITALE
WILDLIFE CHECK - ENVIRONMENTAL 09/25/2023 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
BLD COMPLETE 07/10/2024 07/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/10/2024 07/10/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/11/2024 03/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/11/2024 03/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/11/2024 03/11/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 01/04/2024 01/05/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. You need to be more clear on whats changing. What are can lights in the seal. Documents seem to be the same besides the date stamped.
BLD HOLD 01/03/2024 01/04/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet must have a shop drawing approval stamp by engineer of record for the house.
SWALE COMPLETE 09/18/2023 11/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLENV COMPLETE 09/18/2023 09/25/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 9/25/23 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BLD COMPLETE 09/15/2023 09/16/2023
Note: Released By: JPI
CUSVC COMPLETE 09/15/2023 09/19/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/15/2023 09/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/15/2023 09/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/15/2023 09/18/2023
LOCATE COMPLETE 09/15/2023 09/18/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 09/15/2023 09/18/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/15/2023 09/21/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 09/15/2023 09/18/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 09/15/2023 09/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 08/12/2024
UTILITY PEP REINSPECTION ¤40.00 08/12/2024
CONTRACTOR CHANGE ¤20.00 03/15/2024
CONTRACTOR CHANGE ¤20.00 03/15/2024
CONTRACTOR CHANGE ¤20.00 03/15/2024
CONTRACTOR CHANGE ¤20.00 02/02/2024
FIRE IMPACT FEE ADMIN ¤12.62 11/13/2023
FIRE IMPACT FEE ADMIN (¤12.62) 11/13/2023
FC IMPACT FEE EMS ¤62.00 11/13/2023
IMPACT FEE FIRE ¤420.52 11/13/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/13/2023
FC IMPACT FEE LIBRARY ¤268.00 11/13/2023
IMPACT FEE PARKS ¤1,769.15 11/13/2023
IMPACT FEE SCHOOL ¤5,450.00 11/13/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 11/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 11/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 11/13/2023
PARKS IMPACT FEE ADMIN ¤53.07 11/13/2023
PARKS IMPACT FEE ADMIN (¤53.07) 11/13/2023
SURCHARGE FS 533.721 ¤5.13 11/13/2023
SURCHARGE - FS 468.631 ¤7.69 11/13/2023
SW ENG - FOUNDATION SURVEY ¤20.00 11/13/2023
SW ENG INSPECTION 80 ¤80.00 11/13/2023
SW ENG PRE APRON ¤30.00 11/13/2023
SEWER INSPECTION ¤25.00 11/13/2023
SEWER CAPITAL FACILITY ¤5,344.82 11/13/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 11/13/2023
SITE PLAN 30 ¤30.00 11/13/2023
SW ENG - REVIEW 20 ¤20.00 11/13/2023
SW ENG RES REVIEW 200 ¤200.00 11/13/2023
TRANS IMPACT FEE ADMIN ¤54.36 11/13/2023
TRANS IMPACT FEE ADMIN (¤54.36) 11/13/2023
WATER-METER ¤505.39 11/13/2023
WATER- TURN ON ¤25.00 11/13/2023
WATER- TURN ON ¤25.00 11/13/2023
ADJUSTMENT 50% (¤512.73) 11/13/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/13/2023
INSPECTION - RESIDENTIAL ¤775.50 11/13/2023
PLAN REVIEW - RESIDENTIAL ¤219.96 11/13/2023
CONNECTION FEES ¤1,166.26 11/13/2023
Fees Total Due: ¤0.00 Total Paid: ¤22,120.57