Permit #2023090690

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0270
CONDITIONED SPACE: 2712 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
PATIO/DECK (NO ROOF) : 442 sqft
Total Square Footage: 4009 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 130 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/29/2023
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0270
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/27/2025 FINAL APPROVED BTAYLOR
Note: 2/14/2025 - PREVIOUS INSPECTION NOTES 12/14/25 1. ODU needs 3" clearance from ground grade FBCR M1305.1.4.1 2. Wire hanging out of wall by pool equipment NEC 440.14 3. Hole in building by pool equipment FBCR 402.4.1.1 4. Outdoor kitchen exhaust not covered/sealed M1601.4.1 5. Ceiling penetration above AH and small garage door needs to be sealed FBC R302.11 6. SGD in master bedroom has non working locks 7. French doors to pool off dining area has wide gap when closed and secondary locks do not close all the way 8. Hole is cabinet for wall oven electrical needs to be sealed FBCR 302.11 9. All man doors in house and pool house missing weather stripping FBC 402.5.1.1 10. Guest bath shower tile has several cracks 11. Light not working in pantry 12. Small garage door will nto close all the way FBCR 309.4 12/12/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 02/14/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 12/14/25 1. ODU needs 3" clearance from ground grade FBCR M1305.1.4.1 2. Wire hanging out of wall by pool equipment NEC 440.14 3. Hole in building by pool equipment FBCR 402.4.1.1 4. Outdoor kitchen exhaust not covered/sealed M1601.4.1 5. Ceiling penetration above AH and small garage door needs to be sealed FBC R302.11 6. SGD in master bedroom has non working locks 7. French doors to pool off dining area has wide gap when closed and secondary locks do not close all the way 8. Hole is cabinet for wall oven electrical needs to be sealed FBCR 302.11 9. All man doors in house and pool house missing weather stripping FBC 402.5.1.1 10. Guest bath shower tile has several cracks 11. Light not working in pantry 12. Small garage door will nto close all the way FBCR 309.4 12/12/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 12/12/2024 CANCELLED BY APPLICANT BTAYLOR
U-CROSS CONNECTION 08/14/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/14/2024 9:13:23 AM *** reclaim irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 08/14/2024 APPROVED - AS NOTED FSLADISH
Note: 8/14/24 PAVERS GLUED. NO BROKEN OR CHIPPED PAVERS OBSERVED AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO REMOVE CONCRETE CHUNKS AT 130 AND 132. APPROVING AS NOTED. Inspector Notes from Inspection 9465 8/13/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. PLEASE REMOVE CONCRETE CHUNKS FROM THE ROADWAY IN FRONT OF 130 AND 132, THEY ARE A SAFETY HAZARD.
ROW - STORMWATER FINAL 08/14/2024 APPROVED - AS NOTED FSLADISH
Note: 8/14/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. Inspector Notes from Inspection 9465 8/13/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. PLEASE REMOVE CONCRETE CHUNKS FROM THE ROADWAY IN FRONT OF 130 AND 132, THEY ARE A SAFETY HAZARD.
U -UTILITY RESIDENTIAL FINAL 08/14/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/14/2024 9:24:17 AM *** fire hydrant vave needs soils removed from around perating nut-Mason to shop vac it clean ,inspect on next Final
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/13/2024 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 08/13/2024 APPROVED - AS NOTED FSLADISH
Note: 8/13/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. PLEASE REMOVE CONCRETE CHUNKS FROM THE ROADWAY IN FRONT OF 130 AND 132, THEY ARE A SAFETY HAZARD.
ROW- PRE-APRON (PRE-POUR) 07/02/2024 APPROVED PFLANAGAN
Note: READY FOR PAVERS ---------------------------------------------------------------- 6/26/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVER LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ROW- PAVER RESTRAINTS 06/26/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 06/26/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON, SIDEWALK AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVER LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
TIE BEAM / LINTEL 06/25/2024 APPROVED BTAYLOR
Note: 6/21/2024 - PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 06/21/2024 CANCELLED BY APPLICANT BTAYLOR
ELECTRIC - EARLY POWER 04/25/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 11-14-23 1. Emailed FPL at 2:51. 4-25-24 1. Emailed FPL at 3:18.
GRAVITY SEWER TEST 01/31/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 01/31/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 01/23/2024 APPROVED BTAYLOR
INSULATION 01/11/2024 APPROVED BTAYLOR
ALL ROUGH 01/05/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/21/2023 APPROVED BTAYLOR
WALL SHEATHING 12/01/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/28/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 11/14/2023 APPROVED TBAKER
ELECTRIC-TUG 11/14/2023 APPROVED - AS NOTED BTAYLOR
Note: 11-14-23 1. Emailed FPL at 2:51.
TIE BEAM / LINTEL 11/09/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 10/31/2023 APPROVED RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2023 APPROVED MGIBSON
FOOTER 10/16/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 10/05/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/14/2023 11/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/14/2023 11/14/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 11/13/2023 11/13/2023
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF
BLD COMPLETE 09/28/2023 09/28/2023
Note: Released By: JPI
ZON COMPLETE 09/28/2023 09/29/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/28/2023 09/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/28/2023 09/29/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/27/2023 09/28/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan is missing your walkway to the entrance of home, provide material and width
MECH COMPLETE 09/27/2023 09/28/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 09/27/2023 09/27/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
ENGIN1 COMPLETE 09/27/2023 09/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 09/27/2023 09/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD HOLD 09/20/2023 09/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THIS IS THE CORRECT REVIEW. PREVIOUS WAS COMPLETED IN ERROR. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal)
BLD COMPLETE 09/18/2023 09/19/2023
Note: Released By: JPI
CUSVC COMPLETE 09/18/2023 09/18/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/18/2023 09/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/18/2023 09/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/18/2023 09/19/2023
LOCATE COMPLETE 09/18/2023 09/19/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/18/2023 09/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Energy calcs needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor
SW1 COMPLETE 09/18/2023 09/21/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 09/18/2023 09/18/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan is missing your walkway to the entrance of home, provide material and width
BADMIN COMPLETE 09/18/2023 09/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
URB COMPLETE 09/18/2023 09/19/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/24/2025
EXTENSION ¤40.00 02/24/2025
INSPECTION - RESIDENTIAL ¤973.50 09/29/2023
PLAN REVIEW - RESIDENTIAL ¤276.12 09/29/2023
WATER-METER ¤505.39 09/29/2023
WATER-METER ¤419.86 09/29/2023
ADJUSTMENT 50% (¤639.81) 09/29/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/29/2023
CONNECTION FEES ¤25.00 09/29/2023
FIRE IMPACT FEE ADMIN ¤12.62 09/29/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/29/2023
FC IMPACT FEE EMS ¤62.00 09/29/2023
IMPACT FEE FIRE ¤420.52 09/29/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/29/2023
FC IMPACT FEE LIBRARY ¤268.00 09/29/2023
IMPACT FEE PARKS ¤1,769.15 09/29/2023
IMPACT FEE SCHOOL ¤5,450.00 09/29/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 09/29/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/29/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/29/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/29/2023
SURCHARGE FS 533.721 ¤6.40 09/29/2023
SURCHARGE - FS 468.631 ¤9.60 09/29/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/29/2023
SW ENG INSPECTION 80 ¤80.00 09/29/2023
SW ENG PRE APRON ¤30.00 09/29/2023
SW ENG - REVIEW 20 ¤20.00 09/29/2023
SW ENG RES REVIEW 200 ¤200.00 09/29/2023
TRANS IMPACT FEE ADMIN ¤99.33 09/29/2023
TRANS IMPACT FEE ADMIN (¤99.33) 09/29/2023
SEWER INSPECTION ¤25.00 09/29/2023
SEWER CAPITAL FACILITY ¤1,682.11 09/29/2023
WATER CAPITAL FACILITY FEE ¤1,398.48 09/29/2023
SITE PLAN 30 ¤30.00 09/29/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,695.32