I want to search for...

Permit #2023090691

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0260
CONDITIONED SPACE: 2712 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
PATIO/DECK (NO ROOF) : 442 sqft
Total Square Footage: 4009 sqft
Block: 00090
Subdivision: -
Job Phone: 407-808-8155
Location Address: 128 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/02/2023
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT

Address

OF ORLANDO - PC INC

DAVENPORT, FL 33837

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0260
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

WARLEY BELTRAME VITAL
Status Location Address State License Number Phone
INACTIVE

45 S WICKHAM RD SUITE A

MELBOURNE, FL 32904

CAC1820085 (Exp: 08/31/2024) 321-259-6070
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/12/2024 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 11/14/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/14/2024 10:03:29 AM *** reclaim irr-no cross connection
U -UTILITY RESIDENTIAL FINAL 11/14/2024 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 08/15/2024 APPROVED FSLADISH
Note: 8/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.Inspector Notes from Inspection 9465 8/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/15/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 6/10/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES PLEASE DIG OUT THE PAVER RESTRAINTS ON RIGHT SIDE MORE DO TO IRRAGATION LEAK IT IS FILL UP WITH SEDIMENT. READY TO POUR CONCRETE FOR THE SIDEWALK AND APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS AND WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/15/2024 APPROVED - AS NOTED FSLADISH
Note: 8/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 08/15/2024 APPROVED FSLADISH
Note: 8/15/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection.
TIE BEAM / LINTEL 06/21/2024 APPROVED BTAYLOR
ROW- PRE-APRON (PRE-POUR) 06/10/2024 APPROVED - AS NOTED FSLADISH
Note: 6/10/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES PLEASE DIG OUT THE PAVER RESTRAINTS ON RIGHT SIDE MORE DO TO IRRAGATION LEAK IT IS FILL UP WITH SEDIMENT. READY TO POUR CONCRETE FOR THE SIDEWALK AND APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS AND WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ROW- PAVER RESTRAINTS 05/29/2024 APPROVED PFLANAGAN
ROW- PRE-APRON (PRE-POUR) 05/29/2024 PARTIALLY APPROVED PFLANAGAN
Note: PLEASE DIG OUT THE PAVER RESTRAINTS ON RIGHT SIDE MORE DO TO IRRAGATION LEAK IT IS FILL UP WITH SEDIMENT. READY TO POUR CONCRETE FOR THE SIDEWALK AND APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS AND WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ELECTRIC - EARLY POWER 05/10/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 12-1-23 1. Emailed FPL at 8:56. 5-10-24 1. Emailed FPL at 8:26.
GRAVITY SEWER TEST 01/31/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 01/31/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 01/26/2024 APPROVED BTAYLOR
INSULATION 01/23/2024 APPROVED BTAYLOR
ALL ROUGH 01/16/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/21/2023 APPROVED BTAYLOR
WALL SHEATHING 12/06/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/04/2023 APPROVED BTAYLOR
ELECTRIC-TUG 12/01/2023 APPROVED - AS NOTED BTAYLOR
Note: 12-1-23 1. Emailed FPL at 8:56.
TIE BEAM / LINTEL 11/28/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 11/14/2023 APPROVED TBAKER
MONOLITHIC SLAB 11/09/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 11/02/2023 APPROVED BTAYLOR
FOOTER 10/23/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 10/05/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/14/2023 11/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/14/2023 11/14/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 11/13/2023 11/13/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your file correctly.
BLD COMPLETE 09/27/2023 09/27/2023
Note: Released By: JPI
MECH COMPLETE 09/27/2023 09/28/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 09/18/2023 09/19/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 09/18/2023 09/18/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 09/18/2023 09/18/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/18/2023 09/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 09/18/2023 09/19/2023
LOCATE COMPLETE 09/18/2023 09/19/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 09/18/2023 09/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Energy calcs needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor
SW1 COMPLETE 09/18/2023 09/21/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON COMPLETE 09/18/2023 09/18/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN COMPLETE 09/18/2023 09/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
URB COMPLETE 09/18/2023 09/19/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 10/02/2023
WATER-METER ¤419.86 10/02/2023
ADJUSTMENT 50% (¤639.81) 10/02/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/02/2023
INSPECTION - RESIDENTIAL ¤973.50 10/02/2023
PLAN REVIEW - RESIDENTIAL ¤276.12 10/02/2023
CONNECTION FEES ¤25.00 10/02/2023
FIRE IMPACT FEE ADMIN ¤12.62 10/02/2023
FIRE IMPACT FEE ADMIN (¤12.62) 10/02/2023
FC IMPACT FEE EMS ¤62.00 10/02/2023
IMPACT FEE FIRE ¤420.52 10/02/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/02/2023
FC IMPACT FEE LIBRARY ¤268.00 10/02/2023
IMPACT FEE PARKS ¤1,769.15 10/02/2023
IMPACT FEE SCHOOL ¤5,450.00 10/02/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 10/02/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/02/2023
PARKS IMPACT FEE ADMIN ¤53.07 10/02/2023
PARKS IMPACT FEE ADMIN (¤53.07) 10/02/2023
SURCHARGE FS 533.721 ¤6.40 10/02/2023
SURCHARGE - FS 468.631 ¤9.60 10/02/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/02/2023
SW ENG INSPECTION 80 ¤80.00 10/02/2023
SW ENG PRE APRON ¤30.00 10/02/2023
SW ENG - REVIEW 20 ¤20.00 10/02/2023
SW ENG RES REVIEW 200 ¤200.00 10/02/2023
TRANS IMPACT FEE ADMIN ¤99.33 10/02/2023
TRANS IMPACT FEE ADMIN (¤99.33) 10/02/2023
SEWER INSPECTION ¤25.00 10/02/2023
SEWER CAPITAL FACILITY ¤1,682.11 10/02/2023
WATER CAPITAL FACILITY FEE ¤1,398.48 10/02/2023
SITE PLAN 30 ¤30.00 10/02/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,615.32