Permit #2023090887

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00730-0100
CONDITIONED SPACE: 1461 sqft
GARAGE: 398 sqft
OPENED PORCH (WITH ROOF) : 42 sqft
Total Square Footage: 1901 sqft
Block: 00730
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 844-885-8913
Location Address: 16 RYMEN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/02/2023
NOC: RECORDED
Applicant name: SIMON DALE VANWAGENEN
Owner: LGI HOMES- FLORIDA, LLC

Address

1274 PALM COAST PKWY SW

PALM COAST, FL 32137

Lot: 0100
Contracted Stated Job Value: ¤197,705.46
Job Description: Single Family Residence
Type: CN
Original Permit #: 2023060828

Contractor

LGI HOMES-FLORIDA LLC
Status Location Address State License Number Phone
ACTIVE

2304 SPRING HILL CT

TAMPA, FL 33602

CBC1257972 (Exp: 08/31/2026) 904-451-8258

Sub Contractors

BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
CHRISTOPHER DENNIS O'CONNER
Status Location Address State License Number Phone
ACTIVE

240 N LAKE CUNNINGHAM AVE

JACKSONVILLE, FL 32257

ER13015361 (Exp: 08/31/2026) 904-540-0858
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/28/2024 FINAL APPROVED AGAETANO
U-CROSS CONNECTION 08/27/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/27/2024 9:40:12 AM *** has potable irrigatin meter with PVB-no cross connection
ROW - FINAL APRON (AFTER POUR) 08/27/2024 APPROVED FSLADISH
Note: 8/27/24 PIPE ELEVATION IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection.
ROW - STORMWATER FINAL 08/27/2024 APPROVED - AS NOTED FSLADISH
Note: 8/27/24 At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection.
ROW DAMAGE 08/27/2024 APPROVED - AS NOTED FSLADISH
Note: 8/27/24 ALL STORMWATER INSPECTIONS COMPLETED APPROVING AS NOTED. _______________________________________________________________________________________________________________________ 3/11/2024 - PREVIOUS INSPECTION NOTES TALKED WITH AJ ABOUT THE DAMAGE INSPECTION HE WANTS US TO PASS THIS INSPECTION SO THE PERMIT DON'T EXPIRE. BUT PER ROBERT, JORDAN, AND BARBIE STATES DO NOT PASS THIS FOR ANY EXTENTION ON THE PERMIT. PLEASE SEE NOTES IN APPLICANT NOTES
U -UTILITY RESIDENTIAL FINAL 08/27/2024 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/26/2024 APPROVED TPOLACEK
Note: Inspector Notes from Inspection 9270 08/14/24 TPOLACEK*** MET WITH CM , PIPE WAS RESET AND IS NOW WITHIN TOLERENCE AND PICHED IN THE CORRECT DIRECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2024 - PREVIOUS INSPECTION NOTES 08/14/24 TPOLACEK** CULVERT IS BACKPITCHED .07 IN THE WRONG DIRECTION. PLEASE CHECK ELEVATION. POUR AREA IS TOO WET AND SOFT NEXT TO PIPE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/12/2024 - PREVIOUS INSPECTION NOTES 08/12/24 TPOLACEK*** BENCH MARK IS STILL OFF AND NEEDS TO REESTABLISHED 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** MET WITH PHIL, BENCHMARK IS OUT BY 5-6" DOUBLE CHECKED WITH SURVEY NOTES AND CENTERLINE ELEVATIONS. FORM BOARD FOR APRON WINGS ARE BACKPITCHED INTO DRIVEWAY. CANCELLING AS PER APPLICANT
ROW FIELD SURVEY /GRADING CERTIFICATION 08/26/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- PRE-APRON (PRE-POUR) 08/14/2024 Disapproved - NO FEE TPOLACEK
Note: 08/14/24 TPOLACEK** CULVERT IS BACKPITCHED .07 IN THE WRONG DIRECTION. PLEASE CHECK ELEVATION. POUR AREA IS TOO WET AND SOFT NEXT TO PIPE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/12/2024 - PREVIOUS INSPECTION NOTES 08/12/24 TPOLACEK*** BENCH MARK IS STILL OFF AND NEEDS TO REESTABLISHED 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** MET WITH PHIL, BENCHMARK IS OUT BY 5-6" DOUBLE CHECKED WITH SURVEY NOTES AND CENTERLINE ELEVATIONS. FORM BOARD FOR APRON WINGS ARE BACKPITCHED INTO DRIVEWAY. CANCELLING AS PER APPLICANT
ROW- PRE-APRON (PRE-POUR) 08/14/2024 APPROVED - AS NOTED TPOLACEK
Note: 08/14/24 TPOLACEK*** MET WITH CM , PIPE WAS RESET AND IS NOW WITHIN TOLERENCE AND PICHED IN THE CORRECT DIRECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/14/2024 - PREVIOUS INSPECTION NOTES 08/14/24 TPOLACEK** CULVERT IS BACKPITCHED .07 IN THE WRONG DIRECTION. PLEASE CHECK ELEVATION. POUR AREA IS TOO WET AND SOFT NEXT TO PIPE. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/12/2024 - PREVIOUS INSPECTION NOTES 08/12/24 TPOLACEK*** BENCH MARK IS STILL OFF AND NEEDS TO REESTABLISHED 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** MET WITH PHIL, BENCHMARK IS OUT BY 5-6" DOUBLE CHECKED WITH SURVEY NOTES AND CENTERLINE ELEVATIONS. FORM BOARD FOR APRON WINGS ARE BACKPITCHED INTO DRIVEWAY. CANCELLING AS PER APPLICANT
ROW- PRE-APRON (PRE-POUR) 08/12/2024 Disapproved - NO FEE TPOLACEK
Note: 08/12/24 TPOLACEK*** BENCH MARK IS STILL OFF AND NEEDS TO REESTABLISHED 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** MET WITH PHIL, BENCHMARK IS OUT BY 5-6" DOUBLE CHECKED WITH SURVEY NOTES AND CENTERLINE ELEVATIONS. FORM BOARD FOR APRON WINGS ARE BACKPITCHED INTO DRIVEWAY. CANCELLING AS PER APPLICANT
ROW- PRE-APRON (PRE-POUR) 08/08/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 08/08/24 TPOLACEK*** MET WITH PHIL, BENCHMARK IS OUT BY 5-6" DOUBLE CHECKED WITH SURVEY NOTES AND CENTERLINE ELEVATIONS. FORM BOARD FOR APRON WINGS ARE BACKPITCHED INTO DRIVEWAY. CANCELLING AS PER APPLICANT
ELECTRIC - EARLY POWER 08/07/2024 APPROVED JSTEWART
GRAVITY SEWER TEST 07/19/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 07/19/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 07/02/2024 APPROVED CBOWERMASTER
INSULATION 06/26/2024 APPROVED AGAETANO
ALL ROUGH 06/24/2024 APPROVED AGAETANO
Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 06-21-2024 Approved drawings not on site. A complete inspection will be required.
LATH/BRICK/ WATER BARRIER 06/24/2024 APPROVED AGAETANO
Note: 6/21/2024 - PREVIOUS INSPECTION NOTES 06-21-2024 Contractor not ready.
ALL ROUGH 06/21/2024 Disapproved - NO FEE AGAETANO
Note: 06-21-2024 Approved drawings not on site. A complete inspection will be required.
LATH/BRICK/ WATER BARRIER 06/21/2024 Disapproved - NO FEE AGAETANO
Note: 06-21-2024 Contractor not ready.
ELECTRIC-TUG 06/18/2024 APPROVED AGAETANO
ROOF VALLEY & METAL 06/06/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2460 06-04-2024 1. S-6 Detail N SD5 missing screws at bottom plate, left back window. 2. S-6 DTT2-Z right garage not fastened completely. Check at next inspection.
WALL SHEATHING 06/04/2024 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/04/2024 APPROVED - AS NOTED AGAETANO
Note: 06-04-2024 1. S-6 Detail N SD5 missing screws at bottom plate, left back window. 2. S-6 DTT2-Z right garage not fastened completely. Check at next inspection.
FOUND SURVEY APPROVED (OFFICE) 05/28/2024 APPROVED TBAKER
MONOLITHIC SLAB 05/21/2024 APPROVED AGAETANO
Note: 5/20/2024 - PREVIOUS INSPECTION NOTES 05-20-2024 1. Soil has washed into the footing area. 2. Slab not proper depth. See highlighted areas. Check all. Please install multiple string lines. 3. Compaction test not on site. 4. Back lanai not on drawings. Please submit a revision to the building department and have approved drawings on site. 5. Tamp areas. Check all.
MONOLITHIC SLAB 05/20/2024 Disapproved - NO FEE AGAETANO
Note: 05-20-2024 1. Soil has washed into the footing area. 2. Slab not proper depth. See highlighted areas. Check all. Please install multiple string lines. 3. Compaction test not on site. 4. Back lanai not on drawings. Please submit a revision to the building department and have approved drawings on site. 5. Tamp areas. Check all.
PLUMBING 1ST ROUGH UNDERGROUND 05/15/2024 APPROVED MGIBSON
ROW DAMAGE 03/11/2024 Disapproved - NO FEE PFLANAGAN
Note: TALKED WITH AJ ABOUT THE DAMAGE INSPECTION HE WANTS US TO PASS THIS INSPECTION SO THE PERMIT DON'T EXPIRE. BUT PER ROBERT, JORDAN, AND BARBIE STATES DO NOT PASS THIS FOR ANY EXTENTION ON THE PERMIT. PLEASE SEE NOTES IN APPLICANT NOTES
WATER METER INSTALLATION REQUEST 11/27/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 05/22/2024 05/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/22/2024 05/22/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 05/20/2024 05/21/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/20/2024 05/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/20/2024 05/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/20/2024 05/20/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 05/10/2024 05/10/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM COMPLETE EXTENSION FORM
SW1 COMPLETE 09/26/2023 09/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/26/2023 09/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/26/2023 09/26/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 09/21/2023 11/06/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 09/20/2023 09/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 09/20/2023 09/25/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) The subject lots drainage must not negatively impact any adjacent property. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) 2) The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation Land Development Code Technical Manual, Section 300, Drawing 300.D 3) Unless specifically stated the subject lot must drain from back to front
ZON COMPLETE 09/20/2023 09/21/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
CUSVC COMPLETE 09/20/2023 09/25/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/20/2023 09/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/20/2023 09/25/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE - EXTENSION ¤40.00 08/29/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/02/2023
INSPECTION - RESIDENTIAL ¤544.50 10/02/2023
PLAN REVIEW - APPROVED MASTER ¤79.20 10/02/2023
CONNECTION FEES ¤1,166.26 10/02/2023
FIRE IMPACT FEE ADMIN ¤12.62 10/02/2023
FIRE IMPACT FEE ADMIN (¤12.62) 10/02/2023
FC IMPACT FEE EMS ¤62.00 10/02/2023
IMPACT FEE FIRE ¤420.52 10/02/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/02/2023
FC IMPACT FEE LIBRARY ¤268.00 10/02/2023
IMPACT FEE PARKS ¤1,769.15 10/02/2023
IMPACT FEE SCHOOL ¤5,450.00 10/02/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 10/02/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/02/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/02/2023
PARKS IMPACT FEE ADMIN ¤53.07 10/02/2023
PARKS IMPACT FEE ADMIN (¤53.07) 10/02/2023
SURCHARGE FS 533.721 ¤3.27 10/02/2023
SURCHARGE - FS 468.631 ¤4.90 10/02/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/02/2023
SW ENG INSPECTION 80 ¤80.00 10/02/2023
SW ENG PRE APRON ¤30.00 10/02/2023
SW ENG - REVIEW 20 ¤20.00 10/02/2023
SW ENG RES REVIEW 200 ¤200.00 10/02/2023
TRANS IMPACT FEE ADMIN ¤54.36 10/02/2023
TRANS IMPACT FEE ADMIN (¤54.36) 10/02/2023
SEWER CREDIT (¤1,342.00) 10/02/2023
SEWER INSPECTION ¤25.00 10/02/2023
SEWER CAPITAL FACILITY ¤5,344.82 10/02/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 10/02/2023
SITE PLAN 30 ¤30.00 10/02/2023
WATER-METER ¤505.39 10/02/2023
WATER- TURN ON ¤25.00 10/02/2023
WATER- TURN ON ¤25.00 10/02/2023
ADJUSTMENT 50% (¤326.85) 10/02/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,478.04