Permit #2023091135
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00460-0070 |
| CONDITIONED SPACE: 2594 sqft |
| GARAGE: 586 sqft |
| OPENED PORCH (WITH ROOF) : 256 sqft |
| Total Square Footage: 3436 sqft |
| Block: 00460 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-237-5837 |
| Location Address: 8 BUNKER VIEW PL |
| Type: DU - DUPLEX |
| Issue Date: 05/02/2024 |
| NOC: RECORDED |
| Applicant name: MARSEL GILMANSHIN |
| Owner: KORS HOME, LLC |
|
Address 42 WHITE DOVE LN PALM COAST, FL 32164 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GILMANS DEVELOPMENT CORP
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4873 PALM COAST PARKWAY NW #4 PALM COAST, FL 32137 |
CBC1263180 (Exp: 08/31/2026) | 386-237-5837 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
ANDREY GORZDEV
| Status | Location Address | State License Number | Phone |
| ACTIVE |
12278 PEANUT CT JACKSONVILLE, FL 32226 |
CAC1823458 (Exp: 08/31/2026) | 904-574-1000 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 11/19/2025 | FINAL APPROVED | BWRIGHT |
| Note: 9/25/2025 - PREVIOUS INSPECTION NOTES No power to PEP Tank | |||
| ROW - FINAL INSPECTION | 11/13/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 11/13/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 11/13/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 6/17/2025 - PREVIOUS INSPECTION NOTES Side A: 1. Please install 4 tie downs at AC condensor to Pad. FBC M1401.1 2. Please install anti tip bracket at range. Per manufacturer. /FBCR M1901.2 3. Please submit a revision for AC equipment installed in Energy calcs. FBC [A] 107.4 Side B: 1. Please install 4 tie downs at AC condensor to Pad. FBC M1401.1 2. Please install anti tip bracket at range. Per manufacturer. / FBCR M1901.2 3. Please submit a revision for AC equipment installed in Energy calcs. FBC [A] 107.4 4. Need termite plaque posted at breaker panel. FBC 105.11 | |||
| ROW - FINAL APRON (AFTER POUR) | 11/07/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 11-07-25 TPOLACEK*** RECIEVED TEXT ASKING TO CANCEL INSPECTION | |||
| ROW - FINAL INSPECTION | 10/01/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/01/25 LEFT SIDE WHERE STUMP WAS GROUND OUT BUILDER NEEDS TO REMOVE MATERIAL AND SOD AS IT IS HOLDING WATER FROM HAVING POSITIVE FALL TO THE FRONT ** NEED TO CUT GRASS SO INSPECTOR CAN SEE ALL DRAINAGE FEATURES ON PROPERTY. ** THIS INSPECTOR IS CREATING A NEW AFTER POUR INSPECTION AS YOUR DRIVEWAY HAS MUTIPLE CRACKS THAT WERE NOT PRESENT AT THE TIME OF THE PREVIOUS AFTER POUR INSPECTION THERE ARE BLACK MARKS ON DRIVEWAY THAT ARE FROM A PIECE OF HEAVY EQUIPMENT AS WELL AS WHAT LLOKS LIKE TIRE TRACKS FROM DUAL WHEELS INDICATING A LARGE VEHICLE ** SEE THE ATTACHED PHOTOS FROM TODAYS INSPECTION REGARDING THE DRIVEWAY | |||
| U -UTILITY RESIDENTIAL FINAL | 09/25/2025 | Disapproved - NO FEE | BWRIGHT |
| Note: No power to PEP Tank | |||
| ROW - FINAL APRON (AFTER POUR) | 09/25/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/09/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: DRAINAGE IS WORKING YOU STILL NEED TO REMOVE THE STUMP PER GABE ON THE LEFT SIDE OF THE HOUSE BEFORE ROW FINAL INSPECTION ----------------------------------------------------------------------------- ** BUILDER WANTS A SITE VISIT TO DETERMINE IF HIS DRAINAGE IS GOOD BEFORE SETTING SOD Facing the house on the left side, you need to remove or grind down the stump. The drainage conveyance seems to be working, but you need to wait for the final survey. On the right side, I will continue with the drainage conveyance all the way to the property line. If you leave it as it is, it will hold water. Your new drainage is lower than the sod at the end of your new drainage. | |||
| ROW- PROJECT STATUS | 06/26/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: ** BUILDER WANTS A SITE VISIT TO DETERMINE IF HIS DRAINAGE IS GOOD BEFORE SETTING SOD Facing the house on the left side, you need to remove or grind down the stump. The drainage conveyance seems to be working, but you need to wait for the final survey. On the right side, I will continue with the drainage conveyance all the way to the property line. If you leave it as it is, it will hold water. Your new drainage is lower than the sod at the end of your new drainage. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/25/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: 6/5/2025 - PREVIOUS INSPECTION NOTES STILL NEED TO GRADE LOT SO YOU HAVE POSITIVE FALL TO ROADSIDE SWALE ---------------------------------------------------------------------------------- 5/30/2025 - PREVIOUS INSPECTION NOTES THE RIGHT AND LEFT DRAINAGE PATTERN DOESN'T HAVE POSITIVE FLOW TO THE FRONT AS THE FINAL SURVEY STATES NEED TO REGRADE SO WATER WILL FLOW TO FRONT ROADSIDE SWALE LIKE THE FINAL SURVEY STATES. | |||
| BLD - BUILDING FINAL | 06/17/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Side A: 1. Please install 4 tie downs at AC condensor to Pad. FBC M1401.1 2. Please install anti tip bracket at range. Per manufacturer. /FBCR M1901.2 3. Please submit a revision for AC equipment installed in Energy calcs. FBC [A] 107.4 Side B: 1. Please install 4 tie downs at AC condensor to Pad. FBC M1401.1 2. Please install anti tip bracket at range. Per manufacturer. / FBCR M1901.2 3. Please submit a revision for AC equipment installed in Energy calcs. FBC [A] 107.4 4. Need termite plaque posted at breaker panel. FBC 105.11 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/05/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO GRADE LOT SO YOU HAVE POSITIVE FALL TO ROADSIDE SWALE ---------------------------------------------------------------------------------- 5/30/2025 - PREVIOUS INSPECTION NOTES THE RIGHT AND LEFT DRAINAGE PATTERN DOESN'T HAVE POSITIVE FLOW TO THE FRONT AS THE FINAL SURVEY STATES NEED TO REGRADE SO WATER WILL FLOW TO FRONT ROADSIDE SWALE LIKE THE FINAL SURVEY STATES. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/30/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE TO THE FINAL SURVEY --------------------------------------------------------------------------- 5/29/2025 - PREVIOUS INSPECTION NOTES **05/29/25= YOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE 05/22/25 NO CORRECTIONS WERE MADE TO YOUR FINAL SURVEY AS NOTED IN YOUR PREVIOUSLY SUBMITTED FINAL SURVEY. ELEVATION SHOTS REQUIRED ACROSS THE 5 FT UTILITY EASMENT ACROSS THE REAR PROPERTY LINE ** "5) The interior elevations at no greater than a 20-foot grid.• Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** Slopes along developable vacant lots shall have a stabilized slope of no greater thanYOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE ** "8)The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale)• Where an adjacent developed lot does not have a clearly defined swale along the edge of the property, the new lot must utilize a “W” swale as part of their proposed grading plan. Section 300.01 C(8) V-16" 5/8/2025 - PREVIOUS INSPECTION NOTES ** 05/08/25 ELEVATION SHOTS REQUIRED ACROSS THE 5 FT UTILITY EASMENT ACROSS THE REAR PROPERTY LINE ** "5) The interior elevations at no greater than a 20-foot grid.• Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** YOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE ** "8)The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale)• Where an adjacent developed lot does not have a clearly defined swale along the edge of the property, the new lot must utilize a “W” swale as part of their proposed grading plan. Section 300.01 C(8) V-16" | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/30/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE RIGHT AND LEFT DRAINAGE PATTERN DOESN'T HAVE POSITIVE FLOW TO THE FRONT AS THE FINAL SURVEY STATES NEED TO REGRADE SO WATER WILL FLOW TO FRONT ROADSIDE SWALE LIKE THE FINAL SURVEY STATES. | |||
| U-CROSS CONNECTION | 05/28/2025 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/22/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: **05/29/25= YOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE 05/22/25 NO CORRECTIONS WERE MADE TO YOUR FINAL SURVEY AS NOTED IN YOUR PREVIOUSLY SUBMITTED FINAL SURVEY. ELEVATION SHOTS REQUIRED ACROSS THE 5 FT UTILITY EASMENT ACROSS THE REAR PROPERTY LINE ** "5) The interior elevations at no greater than a 20-foot grid.• Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** Slopes along developable vacant lots shall have a stabilized slope of no greater thanYOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE ** "8)The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale)• Where an adjacent developed lot does not have a clearly defined swale along the edge of the property, the new lot must utilize a “W” swale as part of their proposed grading plan. Section 300.01 C(8) V-16" 5/8/2025 - PREVIOUS INSPECTION NOTES ** 05/08/25 ELEVATION SHOTS REQUIRED ACROSS THE 5 FT UTILITY EASMENT ACROSS THE REAR PROPERTY LINE ** "5) The interior elevations at no greater than a 20-foot grid.• Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** YOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE ** "8)The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale)• Where an adjacent developed lot does not have a clearly defined swale along the edge of the property, the new lot must utilize a “W” swale as part of their proposed grading plan. Section 300.01 C(8) V-16" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/08/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/08/25 ELEVATION SHOTS REQUIRED ACROSS THE 5 FT UTILITY EASMENT ACROSS THE REAR PROPERTY LINE ** "5) The interior elevations at no greater than a 20-foot grid.• Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** YOU NEED TO SHOW THE 4:1 SLOPE ACROSS REAR PROPERTY LINE ** "8)The proposed slopes on the property shall not exceed 4:1 and all slopes must adjoin existing property lines at no greater than a 4:1. Slopes along developable vacant lots shall have a stabilized slope of no greater than 2:1 in expectation that the vacant lot will be graded to match the adjoining property elevation (Common Swale)• Where an adjacent developed lot does not have a clearly defined swale along the edge of the property, the new lot must utilize a “W” swale as part of their proposed grading plan. Section 300.01 C(8) V-16" | |||
| ELECTRIC - EARLY POWER | 05/08/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email to FPL. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 03/28/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 3/27/2025 - PREVIOUS INSPECTION NOTES 03/27/25 TPOLACEK*** CULVERT IS SET GOOD HOWEVER, THERE NEEDS TO BE 4" THROUGHOUT THE ENTIRE POUR AREA BEHIND THE ROW. AFTER PULLING STRING LINE IT SHOWS THERE IS ONLY 1" IN CENTER OF POUR AREA. ALL FORM BOARDS ALONG SIDES OF DRIVEWAY MUST HAVE POSITIVE FLOW TO THE SWALE. 3/24/2025 - PREVIOUS INSPECTION NOTES CANCELED BY PHONE CALL BY MARSEL AT 11:41AM -------------------------------------------------------------------------------- 3/19/2025 - PREVIOUS INSPECTION NOTES 03/19/25 TPOLACEK*** CULVERT MUST BE SET AT 8' FROM EXISTING EDGE OF ROAD EDGE OF ROAD FORM BOARDS NEED TO CONTOUR WITH EXISTING EDGE OF ROAD YOU MUST HAVE A MINIMUM OF 5" OVER THE CULVERT AT THE MITERED ENDS. CULVERT IS TO BE CENTERED IN DRIVEWAY MEANING THE SAME DISTANCE FROM EDGE OF DRIVEWAY TO MITER OPEN END. FORM BOARDS SHALL EXTEND ALL THE WAY TO GROUND TO PREVENT OVER POUR. POUR AREA IS TOO SOFT INSPECTOR SANK OVER 3" ALONG SIDE OF PIPE. YOU MUST MAINTAIN 4" THICKNESS THROUGHOUT ENTIRE POUR AREA BEHIND THE ROW. #4 REBAR THE WIDTH OF THE MITERED END NEEDS TO BE ON SITE PLACED IN END OF CULVERT "A) Residential driveways entering upon a paved City street shall be constructed of portland cement concrete, or of such other rigid paving material as the City Engineer may approve, shall be a minimum of ten feet [10') wide at the right-of-way line and sixteen feet (16') wide at the roadway edge. That widening may be provided by a taper. Driveway shoulder within the road right-of-way shall be a minimum of two feet (2') in width and shall be stabilized and sodded. Driveway thickness on the right-of-way shall be either six inches (6"") on firmly compacted subgrade of clean granular material or five inches (5"") on three inches (3"") of limerock or shell base. This concrete thickness may be reduced by one inch (1"") by the addition of 6""x 6"" re-mesh or fiber mesh concrete reinforcing wire. Culvert pipe shall be of the size and set in the location (horizontal and vertical) established by the City and required by the permit. Mitered or tapered end sections are required on driveway pipes, except where otherwise approved by the City Engineer. Culvert pipes with less than twelve inches (12"") of cover below the bottom of driveway pavement to the top of pipe shall either be constructed of reinforced concrete or encased in concrete from the middle of the pipe to the bottom of the concrete driveway. For driveways entering upon a cul-de-sac and for driveways entering a flag lot the minimum width at the roadway edge and the placement of the culvert pipe will be modified to best suit the actual conditions at the site. Existing residential driveways, cut or destroyed by utility installation may be re-constructed to the same section as that original driveway with prior approval from the City. All residential driveways are required to be permitted, in accordance with the above criteria." SWALE PLAN 2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL. DRAWING 300. E 14. CONCRETE EXTENDING BEYOND THE FORMBOARDS, INTO THE SWALE, MUST BE REMOVED.Sec 300.E * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E" * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "#4 REBAR MIN. 24 INCH WIDTH EQUAL TO PIPE DIA.Sec 300.E" 3/17/2025 - PREVIOUS INSPECTION NOTES 03/17/25 TPOLACEK*** SPOKE WITH CM AND THEY ASKED TO CANCEL AS POUR AREA IS UNDER WATER. THEY WILL CALL IN WHEN DRIED OUT | |||
| ROW- PRE-APRON (PRE-POUR) | 03/27/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 03/27/25 TPOLACEK*** CULVERT IS SET GOOD HOWEVER, THERE NEEDS TO BE 4" THROUGHOUT THE ENTIRE POUR AREA BEHIND THE ROW. AFTER PULLING STRING LINE IT SHOWS THERE IS ONLY 1" IN CENTER OF POUR AREA. ALL FORM BOARDS ALONG SIDES OF DRIVEWAY MUST HAVE POSITIVE FLOW TO THE SWALE. 3/24/2025 - PREVIOUS INSPECTION NOTES CANCELED BY PHONE CALL BY MARSEL AT 11:41AM -------------------------------------------------------------------------------- 3/19/2025 - PREVIOUS INSPECTION NOTES 03/19/25 TPOLACEK*** CULVERT MUST BE SET AT 8' FROM EXISTING EDGE OF ROAD EDGE OF ROAD FORM BOARDS NEED TO CONTOUR WITH EXISTING EDGE OF ROAD YOU MUST HAVE A MINIMUM OF 5" OVER THE CULVERT AT THE MITERED ENDS. CULVERT IS TO BE CENTERED IN DRIVEWAY MEANING THE SAME DISTANCE FROM EDGE OF DRIVEWAY TO MITER OPEN END. FORM BOARDS SHALL EXTEND ALL THE WAY TO GROUND TO PREVENT OVER POUR. POUR AREA IS TOO SOFT INSPECTOR SANK OVER 3" ALONG SIDE OF PIPE. YOU MUST MAINTAIN 4" THICKNESS THROUGHOUT ENTIRE POUR AREA BEHIND THE ROW. #4 REBAR THE WIDTH OF THE MITERED END NEEDS TO BE ON SITE PLACED IN END OF CULVERT "A) Residential driveways entering upon a paved City street shall be constructed of portland cement concrete, or of such other rigid paving material as the City Engineer may approve, shall be a minimum of ten feet [10') wide at the right-of-way line and sixteen feet (16') wide at the roadway edge. That widening may be provided by a taper. Driveway shoulder within the road right-of-way shall be a minimum of two feet (2') in width and shall be stabilized and sodded. Driveway thickness on the right-of-way shall be either six inches (6"") on firmly compacted subgrade of clean granular material or five inches (5"") on three inches (3"") of limerock or shell base. This concrete thickness may be reduced by one inch (1"") by the addition of 6""x 6"" re-mesh or fiber mesh concrete reinforcing wire. Culvert pipe shall be of the size and set in the location (horizontal and vertical) established by the City and required by the permit. Mitered or tapered end sections are required on driveway pipes, except where otherwise approved by the City Engineer. Culvert pipes with less than twelve inches (12"") of cover below the bottom of driveway pavement to the top of pipe shall either be constructed of reinforced concrete or encased in concrete from the middle of the pipe to the bottom of the concrete driveway. For driveways entering upon a cul-de-sac and for driveways entering a flag lot the minimum width at the roadway edge and the placement of the culvert pipe will be modified to best suit the actual conditions at the site. Existing residential driveways, cut or destroyed by utility installation may be re-constructed to the same section as that original driveway with prior approval from the City. All residential driveways are required to be permitted, in accordance with the above criteria." SWALE PLAN 2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL. DRAWING 300. E 14. CONCRETE EXTENDING BEYOND THE FORMBOARDS, INTO THE SWALE, MUST BE REMOVED.Sec 300.E * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E" * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "#4 REBAR MIN. 24 INCH WIDTH EQUAL TO PIPE DIA.Sec 300.E" 3/17/2025 - PREVIOUS INSPECTION NOTES 03/17/25 TPOLACEK*** SPOKE WITH CM AND THEY ASKED TO CANCEL AS POUR AREA IS UNDER WATER. THEY WILL CALL IN WHEN DRIED OUT | |||
| ROW- PRE-APRON (PRE-POUR) | 03/24/2025 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELED BY PHONE CALL BY MARSEL AT 11:41AM -------------------------------------------------------------------------------- 3/19/2025 - PREVIOUS INSPECTION NOTES 03/19/25 TPOLACEK*** CULVERT MUST BE SET AT 8' FROM EXISTING EDGE OF ROAD EDGE OF ROAD FORM BOARDS NEED TO CONTOUR WITH EXISTING EDGE OF ROAD YOU MUST HAVE A MINIMUM OF 5" OVER THE CULVERT AT THE MITERED ENDS. CULVERT IS TO BE CENTERED IN DRIVEWAY MEANING THE SAME DISTANCE FROM EDGE OF DRIVEWAY TO MITER OPEN END. FORM BOARDS SHALL EXTEND ALL THE WAY TO GROUND TO PREVENT OVER POUR. POUR AREA IS TOO SOFT INSPECTOR SANK OVER 3" ALONG SIDE OF PIPE. YOU MUST MAINTAIN 4" THICKNESS THROUGHOUT ENTIRE POUR AREA BEHIND THE ROW. #4 REBAR THE WIDTH OF THE MITERED END NEEDS TO BE ON SITE PLACED IN END OF CULVERT "A) Residential driveways entering upon a paved City street shall be constructed of portland cement concrete, or of such other rigid paving material as the City Engineer may approve, shall be a minimum of ten feet [10') wide at the right-of-way line and sixteen feet (16') wide at the roadway edge. That widening may be provided by a taper. Driveway shoulder within the road right-of-way shall be a minimum of two feet (2') in width and shall be stabilized and sodded. Driveway thickness on the right-of-way shall be either six inches (6"") on firmly compacted subgrade of clean granular material or five inches (5"") on three inches (3"") of limerock or shell base. This concrete thickness may be reduced by one inch (1"") by the addition of 6""x 6"" re-mesh or fiber mesh concrete reinforcing wire. Culvert pipe shall be of the size and set in the location (horizontal and vertical) established by the City and required by the permit. Mitered or tapered end sections are required on driveway pipes, except where otherwise approved by the City Engineer. Culvert pipes with less than twelve inches (12"") of cover below the bottom of driveway pavement to the top of pipe shall either be constructed of reinforced concrete or encased in concrete from the middle of the pipe to the bottom of the concrete driveway. For driveways entering upon a cul-de-sac and for driveways entering a flag lot the minimum width at the roadway edge and the placement of the culvert pipe will be modified to best suit the actual conditions at the site. Existing residential driveways, cut or destroyed by utility installation may be re-constructed to the same section as that original driveway with prior approval from the City. All residential driveways are required to be permitted, in accordance with the above criteria." SWALE PLAN 2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL. DRAWING 300. E 14. CONCRETE EXTENDING BEYOND THE FORMBOARDS, INTO THE SWALE, MUST BE REMOVED.Sec 300.E * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E" * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "#4 REBAR MIN. 24 INCH WIDTH EQUAL TO PIPE DIA.Sec 300.E" 3/17/2025 - PREVIOUS INSPECTION NOTES 03/17/25 TPOLACEK*** SPOKE WITH CM AND THEY ASKED TO CANCEL AS POUR AREA IS UNDER WATER. THEY WILL CALL IN WHEN DRIED OUT | |||
| ROW- PRE-APRON (PRE-POUR) | 03/19/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 03/19/25 TPOLACEK*** CULVERT MUST BE SET AT 8' FROM EXISTING EDGE OF ROAD EDGE OF ROAD FORM BOARDS NEED TO CONTOUR WITH EXISTING EDGE OF ROAD YOU MUST HAVE A MINIMUM OF 5" OVER THE CULVERT AT THE MITERED ENDS. CULVERT IS TO BE CENTERED IN DRIVEWAY MEANING THE SAME DISTANCE FROM EDGE OF DRIVEWAY TO MITER OPEN END. FORM BOARDS SHALL EXTEND ALL THE WAY TO GROUND TO PREVENT OVER POUR. POUR AREA IS TOO SOFT INSPECTOR SANK OVER 3" ALONG SIDE OF PIPE. YOU MUST MAINTAIN 4" THICKNESS THROUGHOUT ENTIRE POUR AREA BEHIND THE ROW. #4 REBAR THE WIDTH OF THE MITERED END NEEDS TO BE ON SITE PLACED IN END OF CULVERT "A) Residential driveways entering upon a paved City street shall be constructed of portland cement concrete, or of such other rigid paving material as the City Engineer may approve, shall be a minimum of ten feet [10') wide at the right-of-way line and sixteen feet (16') wide at the roadway edge. That widening may be provided by a taper. Driveway shoulder within the road right-of-way shall be a minimum of two feet (2') in width and shall be stabilized and sodded. Driveway thickness on the right-of-way shall be either six inches (6"") on firmly compacted subgrade of clean granular material or five inches (5"") on three inches (3"") of limerock or shell base. This concrete thickness may be reduced by one inch (1"") by the addition of 6""x 6"" re-mesh or fiber mesh concrete reinforcing wire. Culvert pipe shall be of the size and set in the location (horizontal and vertical) established by the City and required by the permit. Mitered or tapered end sections are required on driveway pipes, except where otherwise approved by the City Engineer. Culvert pipes with less than twelve inches (12"") of cover below the bottom of driveway pavement to the top of pipe shall either be constructed of reinforced concrete or encased in concrete from the middle of the pipe to the bottom of the concrete driveway. For driveways entering upon a cul-de-sac and for driveways entering a flag lot the minimum width at the roadway edge and the placement of the culvert pipe will be modified to best suit the actual conditions at the site. Existing residential driveways, cut or destroyed by utility installation may be re-constructed to the same section as that original driveway with prior approval from the City. All residential driveways are required to be permitted, in accordance with the above criteria." SWALE PLAN 2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL. DRAWING 300. E 14. CONCRETE EXTENDING BEYOND THE FORMBOARDS, INTO THE SWALE, MUST BE REMOVED.Sec 300.E * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E" * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "#4 REBAR MIN. 24 INCH WIDTH EQUAL TO PIPE DIA.Sec 300.E" 3/17/2025 - PREVIOUS INSPECTION NOTES 03/17/25 TPOLACEK*** SPOKE WITH CM AND THEY ASKED TO CANCEL AS POUR AREA IS UNDER WATER. THEY WILL CALL IN WHEN DRIED OUT | |||
| ROW- PRE-APRON (PRE-POUR) | 03/17/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 03/17/25 TPOLACEK*** SPOKE WITH CM AND THEY ASKED TO CANCEL AS POUR AREA IS UNDER WATER. THEY WILL CALL IN WHEN DRIED OUT | |||
| GRAVITY SEWER TEST | 02/11/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 1. POST PERMIT AND NOC 2. REMOVE FOAM FROM SLEEVE ON FOUNDATION PER FBCR 316 & 381 3. NEED DUMPSTER ON SITE PLUMBING APPROVED | |||
| SEWER TIE IN | 02/11/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 1. POST PERMIT AND NOC 2. REMOVE FOAM FROM SLEEVE ON FOUNDATION PER FBCR 316 & 381 3. NEED DUMPSTER ON SITE PLUMBING APPROVED | |||
| ROW - DRAINAGE | 01/31/2025 | APPROVED | GBERTOLA |
| Note: DRAINAGE ACROSS THE FRONT SWALE IS OPEN 1/30/2025 - PREVIOUS INSPECTION NOTES ** 01/30/25 BUILDER STILL NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ____________________________________________________________________________________________________________________ 1/29/2025 - PREVIOUS INSPECTION NOTES ** 01/29/25 NO CORRECTIONS MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/30/25 ___________________________________________________________________________________________________________________ 1/28/2025 - PREVIOUS INSPECTION NOTES ** 01/28/25 NO CORRECTIONS MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/29/25 ___________________________________________________________________________________________________________________ 1/27/2025 - PREVIOUS INSPECTION NOTES ** 01/27/25 NO CORRECTIONS MADE AS REQUIRED AND NOTEDIN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/28/25 ___________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. YOU WILL HAVE TILL MONDAY TO FIX ALL AREAS OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------- ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 01/30/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/30/25 BUILDER STILL NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ____________________________________________________________________________________________________________________ 1/29/2025 - PREVIOUS INSPECTION NOTES ** 01/29/25 NO CORRECTIONS MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/30/25 ___________________________________________________________________________________________________________________ 1/28/2025 - PREVIOUS INSPECTION NOTES ** 01/28/25 NO CORRECTIONS MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/29/25 ___________________________________________________________________________________________________________________ 1/27/2025 - PREVIOUS INSPECTION NOTES ** 01/27/25 NO CORRECTIONS MADE AS REQUIRED AND NOTEDIN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/28/25 ___________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. YOU WILL HAVE TILL MONDAY TO FIX ALL AREAS OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------- ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 01/29/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/29/25 NO CORRECTIONS MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/30/25 ___________________________________________________________________________________________________________________ 1/28/2025 - PREVIOUS INSPECTION NOTES ** 01/28/25 NO CORRECTIONS MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/29/25 ___________________________________________________________________________________________________________________ 1/27/2025 - PREVIOUS INSPECTION NOTES ** 01/27/25 NO CORRECTIONS MADE AS REQUIRED AND NOTEDIN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/28/25 ___________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. YOU WILL HAVE TILL MONDAY TO FIX ALL AREAS OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------- ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 01/28/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/28/25 NO CORRECTIONS MADE AS REQUIRED AND NOTEDIN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/29/25 ___________________________________________________________________________________________________________________ 1/27/2025 - PREVIOUS INSPECTION NOTES ** 01/27/25 NO CORRECTIONS MADE AS REQUIRED AND NOTEDIN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/28/25 ___________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. YOU WILL HAVE TILL MONDAY TO FIX ALL AREAS OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------- ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 01/27/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/27/25 NO CORRECTIONS MADE AS REQUIRED AND NOTEDIN PREVIOUS INSPECTION ** NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. ** NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. ** AN INSPECTION HOLD HAS (PRIORITY 1) HAS NOW BEEN IMPOSED ON YOUR PROJECT SITE AND WILL NOT BE LIFTED UNTIL ALL CORRECTIONS HAVE BEEN MADEINSPECTIONS WILL BE CONDUCTED EVERYDAY UNTIL ALL CORRECTIONS HAVE BEEN MADE ** FOLLOW UP INSPECTION ON 01/28/25 ___________________________________________________________________________________________________________________ 1/22/2025 - PREVIOUS INSPECTION NOTES NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. YOU WILL HAVE TILL MONDAY TO FIX ALL AREAS OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------- ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 01/22/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS UP AND DISPOSE IT IN THE A DUMPSTER. NEED TO RE-ESTABLISH ALL SILT FENCE AROUND PROPERTY. YOU WILL HAVE TILL MONDAY TO FIX ALL AREAS OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------- ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| PEP TANK INSTALLATION REQUEST | 01/09/2025 | APPROVED | CBOWERMASTER |
| Note: 12/17/2024 8:17:50 AM- PREVIOUS INSPECTION NOTES stucco needs to be complete first | |||
| LATH/BRICK/ WATER BARRIER | 12/30/2024 | APPROVED | FWILLIS |
| FIREWALL FINAL | 12/27/2024 | APPROVED | FWILLIS |
| FIREWALL FINAL | 12/20/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2490 12/18.24 1. Full set of plans need to be on site 2. Firewall passed as draft stop only. Will need final inspection on firewall | |||
| INSULATION | 12/18/2024 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 12/18.24 1. Full set of plans need to be on site 2. Firewall passed as draft stop only. Will need final inspection on firewall | |||
| PEP TANK INSTALLATION REQUEST | 12/16/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: stucco needs to be complete first | |||
| FIREWALL DRYWALL NAILING | 12/16/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 12/11/2024 9:37:36 AM *** FBCR P2503.5 NEEDS 5 FOOT HEAD TEST ON DWV FBCR P2503.7 NO PRESSURE ON WATER LINES Will check at insulation | |||
| ALL ROUGH | 12/11/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 12/11/2024 9:37:36 AM *** FBCR P2503.5 NEEDS 5 FOOT HEAD TEST ON DWV FBCR P2503.7 NO PRESSURE ON WATER LINES Will check at insulation | |||
| WALL SHEATHING | 12/09/2024 | APPROVED | FWILLIS |
| ROW - DRAINAGE | 12/05/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/05/24 IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 12/04/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 12/04/24 BUILDER ON SITE AT TIME OF THIS INSPECTION, BURYING IN THE SILT FENCE I WILL PARTIALLY APPROVE THE INSPECTION AND RETURN TOMRROW 12/05/24 TO ENSURE JOB WAS COMPLETED WITH ALL SILT FENCE INSTALLED CORRECTLY ________________________________________________________________________________________________________________________ 12/3/2024 - PREVIOUS INSPECTION NOTES ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 12/03/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/03/24 BUILDER HAS MADE PARTIAL CORRECTIONS YOU ARE STILL REQUIRED TO BURY THE SILT FENCE AS INDICATED IN MULTIPLE PREVIOUS INSPECTIONS, I WILL DIASAPPROVE TODAYS INSPECTION WITH NO FEE AND RETURN TOMORROW TO ENSURE WORK HAS BEEN COMPLETED THE HOLD WILL REMAIN UNTIL SILT FENCE IS INSTALLED CORRECTLY IF NOT THE FEE WILL BE IMPOSED UNTIL CORRECTED AND YOUR SITE WILL REMAIN ON AN INSPECTION HOLD 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/04/24 _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 12/02/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/02/24 BUILDER HAS NOT OPEN THE TEMPORARY CULVERT AN INSPECTION HOLD IS PLACED UPON THIS PROPERTY / PERMIT UNTIL CORRECTIONS HAVE BEEN MADE 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** FOLLOW UP INSPECTION ON 12/03/24 _____________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 11/27/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/27/24 BUILDER NEEDS TO READ ALL NOTES SILT FENCE NEEDS TO BE BURIED CORRECTLY TO BE EFFECTIVE ** CULVERT PIPE IS BURIED AND COMPLETELY BLOCKED. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ** INSPECTOR WILL BE BACK ON 12/02/24 IF THESE CORRECTIONS HAVE NOT BEEN MET YOU WILL HAVE A STOP WORK ORDER PLACED ON THIS SITE UNTIL CORRECTIONS ARE MADE _______________________________________________________________________________________________________________________ 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 11/26/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: YOU HAVE HAD PLENTY OF TIME TO MAKE ALL CORRECTIONS THERE IS NOW AN INSPECTION HOLD ON THIS PERMIT. WE WILL BE OUT EVERYDAY TILL CORRECTIONS ARE MADE IF YOU GO 7 MORE DAYS BEFORE CORRECTIONS THERE WILL BE A STOP WORK ON THIS PERMIT. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED. ----------------------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 11/25/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: BUILDER STILL NEEDS TO DO THE FOLLOWING TALKED TO BUILDER AND HE STATES HE NEEDS ONE MORE DAY IF ALL ARE NOT DONE BY 11/26/24 THERE WILL BE A INSPECTION HOLD ON THIS SITE. 1) BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED. 2) BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ------------------------------------------------------------------------------------ 11/18/2024 - PREVIOUS INSPECTION NOTES ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 11/18/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/18/24 BUILDER NEEDS TO OPEN THE TEMPORARY CULVERT PIPE AS IT IS COMPLETELY PLUGGED TO ALLOW FOR THE FLOW UNOBSTRUCTED ** BUILDER NEEDS TO RE-INSTALL SILT FENCE AROUND PROPERTY SILT FENCE MUST BE INSTALLED CORRECTLY ENSURE THE BOTTOM 4 INCHES IS BURIED ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE ** YOU HAVE 7 DAYS TO COMPLY OR AN INSPECTION HOLD WILL BE IMPOSED ON THE PERMIT ** FOLLOW UP INSPECTION ON 11/25/24 ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/25/2024 | APPROVED | FWILLIS |
| Note: 9/11/2024 - PREVIOUS INSPECTION NOTES SITE FLOODED FROM THE STREET UP TO THE DOORS. RESCHEDULE. ALSO NEED A DUMPSTER ON SITE FOR YOUR TRASH. | |||
| ROOF VALLEY & METAL | 09/25/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/11/2024 | Disapproved - NO FEE | FWILLIS |
| Note: SITE FLOODED FROM THE STREET UP TO THE DOORS. RESCHEDULE. ALSO NEED A DUMPSTER ON SITE FOR YOUR TRASH. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/10/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/22/2024 | APPROVED | FWILLIS |
| Note: 8/21/2024 - PREVIOUS INSPECTION NOTES REBAR NOT SECURED WITH DOWN RODS, FBC1908.4 & FBC1907.5. CHECK ALL CLEAN-OUTS. REBAR MISSING (DOWN RODS) CHECK ALL. BED JOINTS ON SILLS EXCEED LIMITS.(3/8") FBCR606.3.1...... SILLS ARE MARKED IN RED...... | |||
| TIE BEAM / LINTEL | 08/21/2024 | Disapproved - NO FEE | FWILLIS |
| Note: REBAR NOT SECURED WITH DOWN RODS, FBC1908.4 & FBC1907.5. CHECK ALL CLEAN-OUTS. REBAR MISSING (DOWN RODS) CHECK ALL. BED JOINTS ON SILLS EXCEED LIMITS.(3/8") FBCR606.3.1...... SILLS ARE MARKED IN RED...... | |||
| ROW - DRAINAGE | 08/14/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/14/24 ALL CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION CONTROL TO PREVENT ANY NEGATIVE IMPACT ON ANY ADJACENT PROPERTY AND THE ROADWAY. ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 08/13/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/13/24 INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT ** UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** FOLLOW UP INSPECTION ON 08/14/24 ______________________________________________________________________________________________________________________ 8/12/2024 - PREVIOUS INSPECTION NOTES ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 08/12/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/12/24 NO CORRECTIONS HAVE BEEN MADE AN INSPECTION HOLD HAS BEEN IMPOSED ON THIS PERMIT UNTIL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE MADE DAILY ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/13/24 ______________________________________________________________________________________________________________________ 8/9/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 08/09/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO MAKE ALL CORRECTIONS. WILL BE INSPECTING AGAIN ON 8/12/24 IF ALL CORRECTIONS ARE NOT MADE THERE WILL BE AN INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------- 8/8/2024 - PREVIOUS INSPECTION NOTES 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 08/08/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 08/08/24 TPOLACEK*** RECIEVED TEXT FROM MARSEL CREW WILL BE THERE TODAY SO I WILL GIVE THEM AN ADDITION DAY TO COMPLY. ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 08/05/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| ROW - DRAINAGE | 08/05/2024 | CANCELLED BY INSPECTOR | EMADISON |
| Note: 8/5/2024 - PREVIOUS INSPECTION NOTES ** 08/05/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE (RIGHT OF WAY) ROW AS YOUR SITE IS IMPEDING THE FLOW OF STORMWATER YOU EITHER NEED TO INSTALL A TEMPORARY CULVERT PIPE AT A MINIMUM OF 12 INCHES IN DIAMETER OR OPEN THE SWALE AND MAINTAIN DAILY. ** NEED TO REMOVE ALL CONSTRUCTION MATERIAL FROM TH ROW AS WELL AS ANY TRASH AND OR OTHER CONSTRUCTION DEBRIS DICARDED AROUND YOUR SITE ** IF CORRECTIONS ARE NOT MADE AFTER 5 DAYS TOTAL YOUR INSPECTION PRIORITY ON THIS SITE WILL BE MADE A PRIORITY 1 AND NO OTHER INSPECTIONS CAN BE RESULTED UNTIL THIS ISSUE HAS BEEN CORRECTED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION WILL BE ON 08/08/24 | |||
| MONOLITHIC SLAB | 07/15/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/15/2024 2:31:48 PM *** Came by this morning but the slab was not ready, came back this afternoon and the slab was ready and approved 7/12/2024 - PREVIOUS INSPECTION NOTES PLASTIC NOT COMPLETLY INSTALLED R506.2.3, R406.3.2 MISSING UFER GROUND .NEC..250.52(3) | |||
| MONOLITHIC SLAB | 07/12/2024 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: PLASTIC NOT COMPLETLY INSTALLED R506.2.3, R406.3.2 MISSING UFER GROUND .NEC..250.52(3) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/28/2024 | APPROVED - AS NOTED | AWATERS |
| Note: 1. POST PERMIT AND NOC 2. REMOVE FOAM FROM SLEEVE ON FOUNDATION PER FBCR 316 & 381 3. NEED DUMPSTER ON SITE PLUMBING APPROVED | |||
| WATER METER INSTALLATION REQUEST | 06/28/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/17/2025 | 07/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/09/2025 | 07/09/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Only one contractor to sign the duct layout. | |||
| MECH | HOLD | 12/10/2024 | 12/13/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Remove duct layout or submit one signed by listed subcontractor | |||
| MECH | HOLD | 12/05/2024 | 12/09/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be signed by listed subcontractor 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| MECH | HOLD | 11/27/2024 | 12/02/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout signed by wrong contractor | |||
| ENGIN1 | COMPLETE | 09/09/2024 | 09/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/09/2024 | 09/09/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/30/2023 | 10/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/24/2023 | 10/24/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 2. Remove duct layout from enegy calc packet. It is signed by another AC contractor | |||
| BLD | COMPLETE | 10/24/2023 | 10/25/2023 |
| Note: Released By: JPI | |||
| BLD | COMPLETE | 09/27/2023 | 09/28/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 09/27/2023 | 10/03/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/27/2023 | 10/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/27/2023 | 09/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 09/27/2023 | 10/02/2023 |
| LOCATE | COMPLETE | 09/27/2023 | 09/29/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/27/2023 | 10/02/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the listed subcontractor. When resubmitting, submit entire energy calc with duct layout | |||
| SW1 | COMPLETE | 09/27/2023 | 09/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/27/2023 | 09/28/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: Front of home should have the shrubs along the foundation of the home not the driveway Residential homes shall provide a foundation planting consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the home’s foundation.* Floor Plan: Duplexes with 1300 sq. ft. of living area per unit shall have at least two car attached garage per dwelling unit. | |||
| SWALE | COMPLETE | 09/27/2023 | 11/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 09/27/2023 | 10/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADDITIONAL FEE | ¤20.00 | 11/20/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/20/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/20/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/20/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/20/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/20/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 11/20/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/02/2024 |
| WATER- TURN ON | ¤50.00 | 05/02/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/02/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/02/2024 |
| SEWER INSPECTION | ¤25.00 | 05/02/2024 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 05/02/2024 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 05/02/2024 |
| SITE PLAN 30 | ¤30.00 | 05/02/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/02/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/02/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 05/02/2024 |
| IMPACT FEE FIRE | ¤856.18 | 05/02/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 05/02/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 05/02/2024 |
| IMPACT FEE PARKS | ¤3,600.18 | 05/02/2024 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 05/02/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 05/02/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 05/02/2024 |
| SURCHARGE FS 533.721 | ¤7.21 | 05/02/2024 |
| SURCHARGE - FS 468.631 | ¤10.82 | 05/02/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/02/2024 |
| CONNECTION FEES | ¤2,332.52 | 05/02/2024 |
| ADJUSTMENT 50% | (¤721.00) | 05/02/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/02/2024 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 05/02/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 05/02/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤42,060.81 |