Status: COED

Parcel Id: 05-12-31-2755-00000-0360
CONDITIONED SPACE: 2173 sqft
GARAGE: 453 sqft
OPENED PORCH (WITH ROOF) : 428 sqft
Total Square Footage: 3054 sqft
Block: 00000
Subdivision: 2313 - THE GABLES SUBDIVISION
Job Phone: (386)756-0439
Location Address: 21 JUNIPER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/11/2023
NOC: RECORDED
Applicant name: JAMES MICHAEL MATHER
Owner: PAYTAS HOMES INC

Address

PO BOX 290490

PORT ORANGE, FL 32127

Lot: 0360
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PAYTAS HOMES INC
Status Location Address State License Number Phone
ACTIVE

PO BOX 290490

PORT ORANGE, FL 32127

CBC1261873 (Exp: 08/31/2026) (386)756-0439

Sub Contractors

GERALD EDWARD MASTERS JR
Status Location Address State License Number Phone
ACTIVE

505 HERBERT STREET

PORT ORANGE, FL 32129

EC13003217 (Exp: 08/31/2026) (386)304-2600
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
IAN MICHEAL JOHNSON
Status Location Address State License Number Phone Fax
ACTIVE

4244 JACKSON STREET

PORT ORANGE, FL 32127

CCC1325915 (Exp: 08/31/2026) 386-760-0764 386-760-3080

Inspection History

Type Request Date Result Inspector
PLUMBING FINAL 03/25/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
HVAC FINAL 03/25/2024 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 03/25/2024 Approval - Private Provider PPROVIDER
BLD - BUILDING FINAL 03/25/2024 Approval - Private Provider PPROVIDER
ROW - FINAL APRON (AFTER POUR) 03/22/2024 APPROVED TPOLACEK
Note: 03/22/24 pavers are set AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. NOTE TO INSPECTOR HAD TO MOVE THE FLAIR FOR THE APRON CLOSER TO THE ROAD TO AVOID THE METER BOX PER PARREN
ROW - STORMWATER FINAL 03/22/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 03/21/2024 FINAL APPROVED JHARDING
U-CROSS CONNECTION 03/21/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/20/2024 APPROVED TPOLACEK
Note: 03/20/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ------------------------Inspector Notes from Inspection 9270 2/27/24 YOU ARE READY TO LAY PAVERS AS OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/21/2024 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS AND APRON ONLY BEFORE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACT WITH NO PAVERS AT THE TIME OF THE INSPECTION. Inspector Notes from Inspection 9270 2/27/24 YOU ARE READY TO LAY PAVERS AS OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/21/2024 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS AND APRON ONLY BEFORE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACT WITH NO PAVERS AT THE TIME OF THE INSPECTION.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/20/2024 APPROVED TPOLACEK
Note: 03/20/24 SPOKE WITH CM THEY ARE GOING TO SMOOTH OUT THE BERM A LITTLE AND FINISH SOD BEFORE THE ROW FINAL. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 03/07/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 02/27/2024 APPROVED - AS NOTED FSLADISH
Note: 2/27/24 YOU ARE READY TO LAY PAVERS AS OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/21/2024 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS AND APRON ONLY BEFORE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACT WITH NO PAVERS AT THE TIME OF THE INSPECTION.
ROW- PAVER RESTRAINTS 02/21/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 02/21/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR PAVER RESTRAINTS AND APRON ONLY BEFORE NEXT PRE POUR INSPECTION ALL BASE NEEDS TO BE SPREAD AND COMPACT WITH NO PAVERS AT THE TIME OF THE INSPECTION.
INSULATION 01/11/2024 APPROVED BBEMBRY
ALL ROUGH 01/09/2024 Approval - Private Provider PPROVIDER
SEWER TIE IN 01/05/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 01/02/2024 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 12/29/2023 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 12/07/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 11/28/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/28/2023 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 11/16/2023 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 11/13/2023 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 11/13/2023 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 11/07/2023 APPROVED TBAKER
MONOLITHIC SLAB 11/01/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 10/30/2023 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 10/30/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH CANCEL 12/15/2023 12/15/2023
BADMIN INFORMATION 12/12/2023 12/12/2023
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. ENERGY CALCS SUBMITTED MUST BE APPROVED BY PRIVATE PROVIDER BEFORE SUBMITTING.
ENGIN1 COMPLETE 11/07/2023 11/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/07/2023 11/07/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 10/10/2023 10/10/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 10/06/2023 10/06/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement for paver driveway
ZON HOLD 10/04/2023 10/04/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Nothing new submitted for zoning REPEAT COMMENT: Please turn in original right of way agreement for paver driveway Bedroom 4 should be labeled bedroom 3 on floor plan Horizontal banding must wrap corners at least two feet
URB COMPLETE 09/29/2023 10/03/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
CUSVC COMPLETE 09/28/2023 10/05/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/28/2023 09/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 09/28/2023 10/03/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 09/28/2023 09/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/28/2023 09/29/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement for paver driveway Bedroom 4 should be labeled bedroom 3 on floor plan Horizontal banding must wrap corners at least two feet

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 10/11/2023
WATER-METER ¤419.86 10/11/2023
ADJUSTMENT 50% (¤15.00) 10/11/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/11/2023
ADMINISTRATIVE - RESID PP ¤225.00 10/11/2023
CONNECTION FEES ¤25.00 10/11/2023
FC IMPACT FEE EMS ¤62.00 10/11/2023
IMPACT FEE FIRE ¤420.52 10/11/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/11/2023
FC IMPACT FEE LIBRARY ¤268.00 10/11/2023
IMPACT FEE PARKS ¤1,769.15 10/11/2023
IMPACT FEE SCHOOL ¤5,450.00 10/11/2023
RECORDING FEE REIMBURSE DOC ¤44.00 10/11/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 10/11/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/11/2023
SURCHARGE FS 533.721 ¤2.40 10/11/2023
SURCHARGE - FS 468.631 ¤3.60 10/11/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/11/2023
SW ENG INSPECTION 80 ¤80.00 10/11/2023
SW ENG PRE APRON ¤30.00 10/11/2023
SW ENG - REVIEW 20 ¤20.00 10/11/2023
SW ENG RES REVIEW 200 ¤200.00 10/11/2023
SEWER INSPECTION ¤25.00 10/11/2023
SITE PLAN 30 ¤30.00 10/11/2023
Fees Total Due: ¤0.00 Total Paid: ¤13,168.92