I want to search for...
Permit #2023091223
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-0300 |
| CONDITIONED SPACE: 1839 sqft |
| GARAGE: 450 sqft |
| OPENED PORCH (WITH ROOF) : 261 sqft |
| Total Square Footage: 2550 sqft |
| Block: 00000 |
| Subdivision: 4075 - |
| Job Phone: (386)756-0439 |
| Location Address: 60 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/11/2023 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: DEL PALMA PROPERTIES LOT 30 LLC |
|
Address 8861 LAKEVIEW DRIVE PARKLAND, FL 33076 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/22/2024 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 03/21/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connectrions. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/21/2024 | APPROVED | TPOLACEK |
| Note: 03/21/24 PAVERS ARE SET CONCRETE IS GOOD. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 03/21/2024 | APPROVED | TPOLACEK |
| Note: 03/21/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/21/2024 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/18/2024 | APPROVED | TPOLACEK |
| Note: 03/18/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 TALKED TO BOB WITH PAYTAS HOMES AND PASSING AS NOTED THAT THE PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS. AT THE TIME OF THE INSPECTION THERE IS A MOUND OF PAVER BASE. ANYTHING THAT HAPPENS AFTER THIS INSPECTION WITH THE PAVERS IS ON THE BUILDER. READY FOR PAVERS --------------------------------------------------------------------------------------------------------- 2/28/24 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ****DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION PREPOUR INSPECTION HAS BEEN COPLETED.*** | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/18/2024 | APPROVED | TPOLACEK |
| Note: 03/18/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/07/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED TO BOB WITH PAYTAS HOMES AND PASSING AS NOTED THAT THE PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY'S STANDARDS. AT THE TIME OF THE INSPECTION THERE IS A MOUND OF PAVER BASE. ANYTHING THAT HAPPENS AFTER THIS INSPECTION WITH THE PAVERS IS ON THE BUILDER. READY FOR PAVERS --------------------------------------------------------------------------------------------------------- 2/28/24 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ****DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION PREPOUR INSPECTION HAS BEEN COPLETED.*** | |||
| ROW- PAVER RESTRAINTS | 02/28/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/28/24 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ****DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION PREPOUR INSPECTION HAS BEEN COPLETED.*** | |||
| ROW- PRE-APRON (PRE-POUR) | 02/28/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 2/28/24 READY TO POUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ****DO NOT LAY ANY PAVERS UNTIL AFTER A SPREAD AND COMPACTION SECONDARY PREPOUR INSPECTION HAS BEEN COMPLETED.*** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 02/08/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 12/28/2023 | Approval - Private Provider | PPROVIDER |
| Note: 10/24/2023 4:22:44 PM- PREVIOUS INSPECTION NOTES | |||
| SEWER TIE IN | 12/28/2023 | APPROVED | MGIBSON |
| INSULATION | 12/28/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/27/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/22/2023 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 12/19/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 12/06/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 11/30/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/30/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 11/28/2023 | APPROVED | TBAKER |
| ELECTRIC-TUG | 11/14/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 11/06/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 10/25/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/23/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 10/23/2023 | CANCELLED BY APPLICANT | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 10/16/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/17/2023 | 10/24/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/17/2023 | 10/17/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/06/2023 | 10/06/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 09/29/2023 | 10/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/29/2023 | 09/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/29/2023 | 10/03/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/29/2023 | 09/29/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/29/2023 | 09/29/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding must have corner at least two feet on left side | |||
| URB | COMPLETE | 09/29/2023 | 10/03/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 10/11/2023 |
| ADJUSTMENT 50% | (¤15.00) | 10/11/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/11/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 10/11/2023 |
| CONNECTION FEES | ¤25.00 | 10/11/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/11/2023 |
| IMPACT FEE FIRE | ¤420.52 | 10/11/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/11/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/11/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 10/11/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/11/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 10/11/2023 |
| SURCHARGE FS 533.721 | ¤2.40 | 10/11/2023 |
| SURCHARGE - FS 468.631 | ¤3.60 | 10/11/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/11/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/11/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/11/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/11/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/11/2023 |
| SEWER INSPECTION | ¤25.00 | 10/11/2023 |
| SEWER CAPITAL FACILITY | ¤2,863.63 | 10/11/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,675.20 | 10/11/2023 |
| SITE PLAN 30 | ¤30.00 | 10/11/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,218.89 |