I want to search for...
Permit #2023091259
Permit Details
Status: COED
| Parcel Id: 07-11-31-7006-00080-0060 |
| CONDITIONED SPACE: 2631 sqft |
| GARAGE: 631 sqft |
| OPENED PORCH (WITH ROOF) : 597 sqft |
| OPENED PORCH (WITH ROOF) : 83 sqft |
| Total Square Footage: 3942 sqft |
| Block: 00080 |
| Subdivision: 7006 - |
| Job Phone: 386-447-4400 |
| Location Address: 12 FLAMETREE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/12/2023 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: WOLFE RANDALL J & TAMMI L LINDLEY JTWROS |
|
Address 200 BURNHAM RD LAKE OSWEGO, OR 97034 |
|
Address UNIT 410 LAKE OSWEGO, OR 97034 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤673,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/20/2024 | Approval - Private Provider | PPROVIDER |
| Note: 11/19/2024 4:16:05 PM- PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 11/19/2024 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 11/19/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/18/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/18/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 11/18/2024 | APPROVED | EMADISON |
| ROW - FINAL APRON (AFTER POUR) | 11/18/2024 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 11/15/2024 | APPROVED | DHANEY |
| Note: 10/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 10/31/2024 11:44:03 AM *** pressure vacume breaker device on irrigation required to be of brass not plastic | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 11/01/2024 | APPROVED | JMYERS |
| U-CROSS CONNECTION | 10/31/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/31/2024 11:44:03 AM *** pressure vacume breaker device on irrigation required to be of brass not plastic | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/18/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/18/24 CONDITIONS IN THE FIELD DO NOT REPRESENT THE SUBMITTED FINAL SURVEY AS YOU LANDSCAPING EXTENDS TOO FAR INTO THE UTILITY EASEMENT AND DRAINAGE CONVEYANCE WHICH WILL IMPEDE THE FLOW OF STORMWATERCAUSING AA NEGATIVE IMPACT ON THE ADJACENT PROPERTIES | |||
| ROW- PRE-APRON (PRE-POUR) | 05/02/2024 | APPROVED | EMADISON |
| Note: ** 05/02/24 READY TO SET PAVERS _________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 3/27/24 YOU ARE PARTIALLY APPROVED TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. **** DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR INSPECTION HAS BEEN SUBMITTED AND PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- PAVER RESTRAINTS | 03/27/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/27/24 YOU ARE PARTIALLY APPROVED TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. **** DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR INSPECTION HAS BEEN SUBMITTED AND PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/27/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 3/27/24 PIPE IS GOOD. YOU ARE PARTIALLY APPROVED TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. **** DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR INSPECTION HAS BEEN SUBMITTED AND PASSED**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 3/25/2024 - PREVIOUS INSPECTION NOTES 3/25/24 CULVERT PIPE IS OUT OF TOLERANCE TO SWALE PLAN DIAGRAM. YOU WILL NEED TO RESET PIPE TO WITHIN COPC SWALE PLAN DIAGRAM TOLERANCE. SPOKE TO CONCRETE SUB AND TOLD HIM I WOULD NOT FEE HIM TODAY, PLEASE RESET PIPE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 3/22/2024 - PREVIOUS INSPECTION NOTES 3/22/24 CONTRACTOR NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE WHERE BM IS LOCATED. I CAN NOT SHOOT CULVERT ELEVATIONS DUE TO THE OBSRUCTION. PERMIT BOXES DO NOT BELONG ON TELEPHONE POLES. SEE PHOTO FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 03/26/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 03/25/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 3/25/24 CULVERT PIPE IS OUT OF TOLERANCE TO SWALE PLAN DIAGRAM. YOU WILL NEED TO RESET PIPE TO WITHIN COPC SWALE PLAN DIAGRAM TOLERANCE. SPOKE TO CONCRETE SUB AND TOLD HIM I WOULD NOT FEE HIM TODAY, PLEASE RESET PIPE. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 3/22/2024 - PREVIOUS INSPECTION NOTES 3/22/24 CONTRACTOR NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE WHERE BM IS LOCATED. I CAN NOT SHOOT CULVERT ELEVATIONS DUE TO THE OBSRUCTION. PERMIT BOXES DO NOT BELONG ON TELEPHONE POLES. SEE PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 3/22/24 CONTRACTOR NEEDS TO REMOVE PERMIT BOX FROM TELEPHONE POLE WHERE BM IS LOCATED. I CAN NOT SHOOT CULVERT ELEVATIONS DUE TO THE OBSRUCTION. PERMIT BOXES DO NOT BELONG ON TELEPHONE POLES. SEE PHOTO FOR REFERENCE. | |||
| GRAVITY SEWER TEST | 03/01/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 03/01/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 02/12/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/08/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/06/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 01/05/2024 | Approval - Private Provider | PPROVIDER |
| TIE DOWN | 01/02/2024 | Approval - Private Provider | PPROVIDER |
| DOWN CELL | 01/02/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 12/27/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/27/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 12/18/2023 | APPROVED | TBAKER |
| ELEV CERT-FOUNDATION APPROVAL | 12/15/2023 | APPROVED | JMYERS |
| Note: The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ELECTRIC-TUG | 12/11/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 12/08/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 11/27/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/17/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 10/20/2023 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 10/06/2023 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 11/01/2024 | 11/01/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM permit expires 5/5/2025 | |||
| PLFM | COMPLETE | 10/25/2024 | 11/01/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 10/22/2024 | 10/25/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM In section A5, when providing degrees, minutes, seconds you must provide seconds to at least two decimal places or better. | |||
| PLFM | HOLD | 10/17/2024 | 10/18/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM What was submitted was the Foundation elevation certificate. The Final is needed at this time. | |||
| ZON | COMPLETE | 08/01/2024 | 08/01/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/22/2024 | 01/22/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original RIght-of-Way Utililzation Agreement for Paver Driveway. | |||
| ENGIN1 | COMPLETE | 01/18/2024 | 01/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/18/2024 | 01/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/18/2024 | 01/18/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Provide fully completed, signed and notarized Right Of Way Utilization Agreement for the change to paver driveway. Please submit electronic copy for staff review. Note it must be signed by all persons on deed to property. | |||
| GAS | COMPLETE | 01/18/2024 | 01/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/15/2023 | 12/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/15/2023 | 12/15/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 12/15/2023 | 12/15/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| BLD | CANCEL | 10/18/2023 | 10/20/2023 |
| ZON | COMPLETE | 10/10/2023 | 10/10/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/10/2023 | 10/12/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO. | |||
| PLFM | HOLD | 10/02/2023 | 10/03/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 9/28/23, the structure will fall inside the Special Flood Hazard Area. Elevation Certificates will be required at construction drawings, foundation, and final. | |||
| PLENV | COMPLETE | 10/02/2023 | 10/06/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 10/06/23 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| CUSVC | COMPLETE | 09/29/2023 | 10/03/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/29/2023 | 09/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 09/29/2023 | 10/04/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/29/2023 | 10/02/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/29/2023 | 10/02/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have a minimum of sixteen foundation plantings in the front with a minimum of eight along the front and four along each front side. Four trees required for this lot size Must have at least two - seven gallon shrubs for screening of the AC unit | |||
| SWALE | COMPLETE | 09/29/2023 | 11/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/20/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/20/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 11/20/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 10/12/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/12/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/12/2023 |
| SEWER INSPECTION | ¤25.00 | 10/12/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 10/12/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 10/12/2023 |
| SITE PLAN 30 | ¤30.00 | 10/12/2023 |
| SURCHARGE FS 533.721 | ¤2.40 | 10/12/2023 |
| SURCHARGE - FS 468.631 | ¤3.60 | 10/12/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/12/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/12/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/12/2023 |
| WATER- TURN ON | ¤25.00 | 10/12/2023 |
| ADJUSTMENT 50% | (¤15.00) | 10/12/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/12/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 10/12/2023 |
| CONNECTION FEES | ¤1,166.26 | 10/12/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/12/2023 |
| IMPACT FEE FIRE | ¤420.52 | 10/12/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/12/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/12/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 10/12/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/12/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,249.63 |