I want to search for...

Permit #2023100037

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00500-0060
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
CONDITIONED SPACE: 2306 sqft
Total Square Footage: 2942 sqft
Block: 00500
Subdivision: 7063 -
Job Phone: 407-209-9705
Location Address: 61 ZAUN TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/19/2023
NOC: RECORDED
Applicant name: ROBERT W PEEBLES
Owner: FLORIDA SUN PARTNERS II LLC

Address

PO BOX 770279

ORLANDO, FL 32877

Lot: 0060
Contracted Stated Job Value: ¤253,716.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
INACTIVE

7345 GREEN BRIAR PKWY

ORLANDO, FL 32819

CGC1511452 (Exp: 08/31/2024) 407-209-9705

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CFC1430061 (Exp: 08/31/2026) 407-404-4000
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 07/31/2024 FINAL APPROVED BWRIGHT
Note: 7/25/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 7/2/2024 9:29:29 AM *** has potable irr with PVB-no cross connection No power is pep tank
BLD - BUILDING FINAL 07/29/2024 FINAL APPROVED BTAYLOR
Note: 7/25/2024 - PREVIOUS INSPECTION NOTES 7/25/24: 1). Front entry exterior outlet is not GFCI protected. E3902.3 - Outdoor 2). AHU requires a locking breaker. (no disconnect installed). NEC422.31 3). Condensate drain line (left side). Needs to be protected from damage. M1411.3 4). Guest bathroom (on Right side) vanity has no hot water. P2722.2 5). ODU needs to be anchored using the 4 Florida Approved anchors and cannot be anchored using the shipping hold downs. M1307.2/M1401.1 6). Off ridge vent is not secured along the front flange as required by the manufacturer & FBC R806.4
BLD - BUILDING FINAL 07/25/2024 Disapproved -FEE REQUIRED RSIMS
Note: 7/25/24: 1). Front entry exterior outlet is not GFCI protected. E3902.3 - Outdoor 2). AHU requires a locking breaker. (no disconnect installed). NEC422.31 3). Condensate drain line (left side). Needs to be protected from damage. M1411.3 4). Guest bathroom (on Right side) vanity has no hot water. P2722.2 5). ODU needs to be anchored using the 4 Florida Approved anchors and cannot be anchored using the shipping hold downs. M1307.2/M1401.1 6). Off ridge vent is not secured along the front flange as required by the manufacturer & FBC R806.4
ROW - STORMWATER FINAL 07/25/2024 APPROVED - AS NOTED FSLADISH
Note: 7/25/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 07/25/2024 Disapproved - NO FEE BWRIGHT
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 7/2/2024 9:29:29 AM *** has potable irr with PVB-no cross connection No power is pep tank
ROW - FINAL APRON (AFTER POUR) 07/09/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/09/2024 APPROVED PFLANAGAN
Note: FINAL SURVEY DOES WHAT THE NOTE STATES BELOW ----------------------------------------------------------------------------- 6/24/24 MEET WITH JASON ON SITE FOR THE GRADING OF THIS LOT. WE HAVE COME TO THE CONCLUSION THAT WE ARE GOING TO DO A SPLIT DRAINAGE ON THIS LOT. THE HIGH POINT IS GOING TO BE AT THE BACK CORNERS OF THE HOUSE. THEN ALL WATER WILL FLOW TO THE BACK TO THE WETLANDS LIKE BOTH ADJACENT LOT TO THE RIGHT AND LEFT. TOLD HIM DONT WORRY ABOUT A REVISE SITE PLAN . CONTACT PARREN IF ANY QUESTIONS
ROW FIELD SURVEY /GRADING CERTIFICATION 07/09/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ---------------------------------------------------------------------------- 6/24/24 MEET WITH JASON ON SITE FOR THE GRADING OF THIS LOT WE HAVE COME TO THE CONCLUSION THAT WE ARE GOING TO DO A SPLIT DRAINAGE ON THIS LOT. THE HIGH POINT IS GOING TO BE AT THE BACK CORNERS OF THE HOUSE. THEN ALL WATER WILL FLOW TO THE BACK TO THE WETLANDS LIKE BOTH ADJACENT LOT TO THE RIGHT AND LEFT. TOLD HIM DONT WORRY ABOUT A REVISE SITE PLAN . CONTACT PARREN IF ANY QUESTIONS
U-CROSS CONNECTION 07/02/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/2/2024 9:29:29 AM *** has potable irr with PVB-no cross connection
GRAVITY SEWER TEST 07/02/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO ADDRESS POSTED FOR''911''. THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 07/02/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO ADDRESS POSTED FOR''911'' THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 07/02/2024 APPROVED RMARTIN
ROW- PROJECT STATUS 06/24/2024 APPROVED PFLANAGAN
Note: MEET WITH JASON ON SITE FOR THE GRADING OF THIS LOT WE HAVE COME TO THE CONCLUSION THAT WE ARE GOING TO DO A SPLIT DRAINAGE ON THIS LOT. THE HIGH POINT IS GOING TO BE AT THE BACK CORNERS OF THE HOUSE. THEN ALL WATER WILL FLOW TO THE BACK TO THE WETLANDS LIKE BOTH ADJACENT LOT TO THE RIGHT AND LEFT. TOLD HIM DONT WORRY ABOUT A REVISE SITE PLAN . CONTACT PARREN IF ANY QUESTIONS
ROW- PRE-APRON (PRE-POUR) 06/07/2024 APPROVED - AS NOTED FSLADISH
Note: 6/7/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
PEP TANK INSTALLATION REQUEST 05/22/2024 APPROVED CBOWERMASTER
INSULATION 05/17/2024 APPROVED RSIMS
ELECTRIC-TUG 05/16/2024 APPROVED RMARTIN
Note: 4/11/2024 - PREVIOUS INSPECTION NOTES 4/11/24: No change from previous inspection. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: * Electrical ground needs to be in a conduit from ground to panel. NEC 250-92
LATH/BRICK/ WATER BARRIER 05/08/2024 APPROVED BTAYLOR
ALL ROUGH 05/08/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 04/18/2024 APPROVED RSIMS
Note: Inspector Notes from Inspection 2460 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: Previously listed Item 1 remains unresolved and item 2 the pile of trash & debris needs to be put into the dumpster. 4/17/24: Please make sure there is a set of full plans in the permit box for Inspector Only as required. FBC 107.3.1 Thank you --- No plans in the box. Sub Contractors had them in the house and all dis-organized. 4/11/2024 - PREVIOUS INSPECTION NOTES 4/11/24: Inspection Complete / Previous deficiency remains unresolved. 1). Truss T25 _ web 5-10 is not connected as required on MiTek. Highlighted on MiTek 2). Need dumpster emptied & piles of trash/debris cleaned up to make site safe for inspections, etc. 3). Silt fence needs repair. Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. Inspector Notes from Inspection 2340 4/1/24: Previous item 2 still needs to be resolved (1/2" MAX thickness) Approved as noted to keep project moving. Must be resolved prior to next Inspection. 3/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24: 1). Down rod not tied to dowel at right front corner. Highlighted on plan. 2). Back right window sill mortar bed too thick 606.3.1. Highlighted on plan.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/17/2024 APPROVED - AS NOTED RSIMS
Note: 4/15/2024 - PREVIOUS INSPECTION NOTES 4/15/24: Previously listed Item 1 remains unresolved and item 2 the pile of trash & debris needs to be put into the dumpster. 4/17/24: Please make sure there is a set of full plans in the permit box for Inspector Only as required. FBC 107.3.1 Thank you --- No plans in the box. Sub Contractors had them in the house and all dis-organized. 4/11/2024 - PREVIOUS INSPECTION NOTES 4/11/24: Inspection Complete / Previous deficiency remains unresolved. 1). Truss T25 _ web 5-10 is not connected as required on MiTek. Highlighted on MiTek 2). Need dumpster emptied & piles of trash/debris cleaned up to make site safe for inspections, etc. 3). Silt fence needs repair. Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. Inspector Notes from Inspection 2340 4/1/24: Previous item 2 still needs to be resolved (1/2" MAX thickness) Approved as noted to keep project moving. Must be resolved prior to next Inspection. 3/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24: 1). Down rod not tied to dowel at right front corner. Highlighted on plan. 2). Back right window sill mortar bed too thick 606.3.1. Highlighted on plan.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/15/2024 Disapproved - NO FEE RSIMS
Note: 4/15/24: Previously listed Item 1 remains unresolved and item 2 the pile of trash & debris needs to be put into the dumpster. 4/11/2024 - PREVIOUS INSPECTION NOTES 4/11/24: Inspection Complete / Previous deficiency remains unresolved. 1). Truss T25 _ web 5-10 is not connected as required on MiTek. Highlighted on MiTek 2). Need dumpster emptied & piles of trash/debris cleaned up to make site safe for inspections, etc. 3). Silt fence needs repair. Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. Inspector Notes from Inspection 2340 4/1/24: Previous item 2 still needs to be resolved (1/2" MAX thickness) Approved as noted to keep project moving. Must be resolved prior to next Inspection. 3/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24: 1). Down rod not tied to dowel at right front corner. Highlighted on plan. 2). Back right window sill mortar bed too thick 606.3.1. Highlighted on plan.
WALL SHEATHING 04/15/2024 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/11/2024 Disapproved -FEE REQUIRED RSIMS
Note: 4/11/24: Inspection Complete / Previous deficiency remains unresolved. 1). Truss T25 _ web 5-10 is not connected as required on MiTek. Highlighted on MiTek 2). Need dumpster emptied & piles of trash/debris cleaned up to make site safe for inspections, etc. 3). Silt fence needs repair. Please repair your silt fence barrier immediately & you will need to keep it maintained in original condition per FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. Inspector Notes from Inspection 2340 4/1/24: Previous item 2 still needs to be resolved (1/2" MAX thickness) Approved as noted to keep project moving. Must be resolved prior to next Inspection. 3/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24: 1). Down rod not tied to dowel at right front corner. Highlighted on plan. 2). Back right window sill mortar bed too thick 606.3.1. Highlighted on plan.
ELECTRIC-TUG 04/11/2024 Disapproved -FEE REQUIRED RSIMS
Note: 4/11/24: No change from previous inspection. 4/5/2024 - PREVIOUS INSPECTION NOTES 4/5/24: * Electrical ground needs to be in a conduit from ground to panel. NEC 250-92
FOUND SURVEY APPROVED (OFFICE) 04/08/2024 APPROVED TBAKER
ELECTRIC-TUG 04/05/2024 Disapproved - NO FEE RSIMS
Note: 4/5/24: * Electrical ground needs to be in a conduit from ground to panel. NEC 250-92
TIE BEAM / LINTEL 04/01/2024 APPROVED - AS NOTED RSIMS
Note: 4/1/24: Previous item 2 still needs to be resolved (1/2" MAX thickness) Approved as noted to keep project moving. Must be resolved prior to next Inspection. 3/28/2024 - PREVIOUS INSPECTION NOTES 2/28/24: 1). Down rod not tied to dowel at right front corner. Highlighted on plan. 2). Back right window sill mortar bed too thick 606.3.1. Highlighted on plan.
TIE BEAM / LINTEL 03/28/2024 Disapproved - NO FEE RSIMS
Note: 2/28/24: 1). Down rod not tied to dowel at right front corner. Highlighted on plan. 2). Back right window sill mortar bed too thick 606.3.1. Highlighted on plan.
MONOLITHIC SLAB 03/19/2024 APPROVED RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 03/13/2024 APPROVED - AS NOTED MGIBSON
Note: NEED TO ADDRESS POSTED FOR''911''
WATER METER INSTALLATION REQUEST 02/28/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ZON COMPLETE 07/24/2024 07/24/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM No zoning review for blower door test.
MECH COMPLETE 04/29/2024 05/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 04/12/2024 04/16/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition
ENGIN1 COMPLETE 04/08/2024 04/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/08/2024 04/08/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
ZON COMPLETE 10/26/2023 10/26/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 10/26/2023 11/07/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
MECH COMPLETE 10/26/2023 10/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/09/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 10/03/2023 11/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 10/02/2023 10/05/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 10/02/2023 10/05/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/02/2023 10/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/02/2023 10/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/02/2023 10/04/2023
LOCATE COMPLETE 10/02/2023 10/04/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/02/2023 10/04/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition
SW1 HOLD 10/02/2023 10/03/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE AT A MINIMUM OF 4" OF FALL IN THE BACK OFF THE HOUSE FOR THE FIRST 10'
ZON HOLD 10/02/2023 10/03/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This lot has a typical 5ft easement. Please remove the 20ft mbsl/easement in the rear from site plan and survey
BADMIN COMPLETE 10/02/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 07/29/2024
PLAN REVIEW - REVISION ¤32.50 07/29/2024
REINSPECTION RESIDENTIAL ¤40.00 07/29/2024
REINSPECTION RESIDENTIAL ¤40.00 07/29/2024
REINSPECTION RESIDENTIAL ¤40.00 07/29/2024
SW ENG REINSPECTION 20 ¤20.00 07/29/2024
SW ENG - REVIEW 20 ¤20.00 12/19/2023
SW ENG RES REVIEW 200 ¤200.00 12/19/2023
SEWER CREDIT (¤850.00) 12/19/2023
SEWER INSPECTION ¤25.00 12/19/2023
SEWER CAPITAL FACILITY ¤5,344.82 12/19/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 12/19/2023
SITE PLAN 30 ¤30.00 12/19/2023
CONNECTION FEES ¤1,166.26 12/19/2023
WATER- TURN ON ¤25.00 12/19/2023
ADJUSTMENT 50% (¤512.73) 12/19/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/19/2023
INSPECTION - RESIDENTIAL ¤775.50 12/19/2023
PLAN REVIEW - RESIDENTIAL ¤219.96 12/19/2023
CONTRACTOR CHANGE ¤20.00 12/19/2023
CONTRACTOR CHANGE ¤20.00 12/19/2023
FC IMPACT FEE EMS ¤62.00 12/19/2023
IMPACT FEE FIRE ¤428.09 12/19/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/19/2023
FC IMPACT FEE LIBRARY ¤268.00 12/19/2023
IMPACT FEE PARKS ¤1,800.99 12/19/2023
IMPACT FEE SCHOOL ¤5,450.00 12/19/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 12/19/2023
WATER -IRRIGATION INSPECTION ¤25.00 12/19/2023
SURCHARGE FS 533.721 ¤5.13 12/19/2023
SURCHARGE - FS 468.631 ¤7.69 12/19/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/19/2023
SW ENG INSPECTION 80 ¤80.00 12/19/2023
SW ENG PRE APRON ¤30.00 12/19/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,837.09