I want to search for...

Permit #2023100077

Permit Details

Status: CANCEL

Parcel Id: 07-11-31-7064-00370-0140
CONDITIONED SPACE: 1867 sqft
GARAGE: 409 sqft
OPENED PORCH (WITH ROOF) : 28 sqft
Total Square Footage: 2304 sqft
Block: 00370
Subdivision: 7064 -
Job Phone: 904-268-7730
Location Address: 6 LLEBERRY PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
NOC: NO DOCUMENTATION
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: FOCUS HOMES LLC

Address

5220 SHAD RD

JACKSONVILLE, FL 32257

Lot: 0140
Contracted Stated Job Value: ¤195,000.00
Job Description: Single Family Home
Type: CN

Contractor

FOCUS HOMES LLC OF FLORIDA
Status Location Address Mailing Address State License Number Phone
ACTIVE

5220 SHAD RD

JACKSONVILLE, FL 32257

# 202

JACKSONVILLE, FL 32257

CRC1332443 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

BRIAN CHRISTOPHER MULLEN
Status Location Address State License Number Phone
INACTIVE

PO BOX 351158

PALM COAST, FL 0

CCC1330417 (Exp: 08/31/2026) 386-385-8504
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064

Inspection History

Type Request Date Result Inspector
FOUND SURVEY APPROVED (OFFICE)
PLUMBING 1ST ROUGH UNDERGROUND
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
MONOLITHIC SLAB
LATH/BRICK/ WATER BARRIER
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL
WATER METER INSTALLATION REQUEST
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 01/19/2024 01/20/2024
Note: Released By: JPI
MECH COMPLETE 01/19/2024 01/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLSW COMPLETE 01/19/2024 02/26/2024
Note: Released By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM
CUSVC COMPLETE 01/19/2024 01/25/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 01/19/2024 01/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/19/2024 01/19/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 01/19/2024 01/19/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UD1 COMPLETE 01/19/2024 01/24/2024
Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/19/2024 01/22/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
ZON COMPLETE 01/19/2024 01/19/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes
PLC HOLD 01/19/2024 02/28/2024
Note: Held By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM per contractor request
SW1 HOLD 01/19/2024 01/29/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- The front property line is to be equal to the centerline of the road elevation. Please revise the two points on the front corners of the property that need to be altered. 2- Drainage from the structure is to be a 6 inch minimum slope for the first 10’. The back of the property appears to have a 6" drop for the first 20 feet. Please revise. *It may be necessary to reduce the FFE in order to meet the above comments. Please add the following note regarding the PEP tank. "Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted to go around the PEP lids/covers"
SWALE COMPLETE 10/04/2023 11/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UD1 COMPLETE 10/04/2023 10/05/2023
Note: Released By: BRICE WRIGHT - (386)986-2398 - BWRIGHT@PALMCOASTGOV.COM
PLSW HOLD 10/04/2023 10/17/2023
Note: Held By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM 1. Based off the proposed soft grades, the FFE should be a minimum of 26.00 to work. 2. Ideally, the grades at the front property line should be closer to the corresponding center line elevations. The slopes along the side property lines could be steepened to make this work. 3. The Flow Line elevation at the rear right corner could be lowered... it doesn't necessarily need to match the flow line of the rear lot. This would reduce imported fill on both 6 & 8 Lloberry Path. 4. There is a proposed grade called out as 0.00. Please correct.
BLD COMPLETE 10/03/2023 10/06/2023
Note: Released By: JPI
CUSVC COMPLETE 10/03/2023 10/03/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/03/2023 10/05/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/03/2023 10/04/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/03/2023 10/05/2023
LOCATE COMPLETE 10/03/2023 10/05/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/03/2023 10/09/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 HOLD 10/03/2023 10/03/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures.
ZON HOLD 10/03/2023 10/04/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Banding required around all windows and doors facing right of way
BADMIN COMPLETE 10/03/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
JPI COMPLETE 10/03/2023 10/06/2023
Note: Released By: JPI duplicate
BLD HOLD 10/03/2023 10/06/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By Chris Piscitelli for Drop lot.. Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans.
PLC HOLD 10/03/2023 10/04/2023
Note: Held By: ESTELLE LENS - (386)986-2655 - ELENS@PALMCOASTGOV.COM This permit is on hold until released by Utilities and Stormwater and Building (P.B.)
SW1 CANCEL
PLC CANCEL

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤25.00
CONNECTION FEES ¤1,187.26
CONNECTION FEES (¤750.00)
WATER -IRRIGATION INSPECTION ¤25.00
SEWER INSPECTION ¤25.00
SEWER INSPECTION (¤25.00)
SEWER CAPITAL FACILITY ¤5,441.03
SEWER CAPITAL FACILITY (¤3,030.00)
WATER CAPITAL FACILITY FEE ¤3,994.51
WATER CAPITAL FACILITY FEE (¤2,160.00)
Fees Total Due: ¤4,732.80 Total Paid: ¤0.00