I want to search for...
Permit #2023100078
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00210-0580 |
| CONDITIONED SPACE: 1801 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 18 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2299 sqft |
| Block: 00210 |
| Subdivision: - |
| Job Phone: 202-494-2019 |
| Location Address: 40 BROOKSIDE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/14/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0580 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/03/2024 | FINAL APPROVED | RSIMS |
| Note: 5/24/2024 - PREVIOUS INSPECTION NOTES 1. No E-cals on site 2. Breaker in meter main not labeled 3. 2'' conduit abover meter main needs to be sealed where it enters soffit 4. Dryer box needs to be sealed @ wall 5. All garage penitrations need to be sealed (fire assembly) 6. Smoke beeping indicating low or no battery 7. Lani missing extior exit light 8. Garage door is not working properly needs to be working to test sensors | |||
| ROW - FINAL APRON (AFTER POUR) | 05/24/2024 | APPROVED | EMADISON |
| BLD - BUILDING FINAL | 05/24/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. No E-cals on site 2. Breaker in meter main not labeled 3. 2'' conduit abover meter main needs to be sealed where it enters soffit 4. Dryer box needs to be sealed @ wall 5. All garage penitrations need to be sealed (fire assembly) 6. Smoke beeping indicating low or no battery 7. Lani missing extior exit light 8. Garage door is not working properly needs to be working to test sensors | |||
| ROW - STORMWATER FINAL | 05/24/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 05/24/2024 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/20/2024 | APPROVED | EMADISON |
| Note: ** 05/20/24 ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. 5/16/2024 - PREVIOUS INSPECTION NOTES PER PARREN AND GABE NEED TO HAVE MORE FALL FROM THE BACK PROPERTY LINE TO THE DRAINAGE PATTERN THAT GOES TO THE FRONT ROADSIDE SWALE. THIS MEANS YOU NEED TO RAISE THE BACK UP .20 HIGHER THAT IT IS NOW IN THE FIELD. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/16/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/16/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: PER PARREN AND GABE NEED TO HAVE MORE FALL FROM THE BACK PROPERTY LINE TO THE DRAINAGE PATTERN THAT GOES TO THE FRONT ROADSIDE SWALE. THIS MEANS YOU NEED TO RAISE THE BACK UP .20 HIGHER THAT IT IS NOW IN THE FIELD. | |||
| U-CROSS CONNECTION | 05/16/2024 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 04/23/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 04/17/2024 | APPROVED | JSTEWART |
| INSULATION | 03/18/2024 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 03/08/2024 | APPROVED | RMARTIN |
| Note: 2/15/2024 - PREVIOUS INSPECTION NOTES MISSING MAIN BREAKER | |||
| ALL ROUGH | 03/07/2024 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2460 3/6/24- Please install 1/2" titan anchors at Bottom plate front entry wood frame door wall per Plan S1.1. Will check at All rough. 2/21/2024 - PREVIOUS INSPECTION NOTES 2/21/24- Please submit and have onsite plan detail on Front entry wood frame tie downs and anchors. 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- Please reschedule when Inspector is able to be in building without trip hazzards, and overhead working. floor is a mess and installers are onsite. 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need plans on site for inspection, House plans not in box FBC 107.3 2/15/2024 - PREVIOUS INSPECTION NOTES TRADES WORKING ABOVE IN TRUSS'S. MATERIAL, TOOLS ETC, SCATTERED THROUGHOUT ON THE FLOOR MAKING TRIP HAZARDS WHILE LOOKING UP INSPECTING. ALSO NEED A CLEAN, READABLE, IN NUMERICAL ORDER SET OF PLANS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/06/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/6/24- Please install 1/2" titan anchors at Bottom plate front entry wood frame door wall per Plan S1.1. Will check at All rough. 2/21/2024 - PREVIOUS INSPECTION NOTES 2/21/24- Please submit and have onsite plan detail on Front entry wood frame tie downs and anchors. 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- Please reschedule when Inspector is able to be in building without trip hazzards, and overhead working. floor is a mess and installers are onsite. 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need plans on site for inspection, House plans not in box FBC 107.3 2/15/2024 - PREVIOUS INSPECTION NOTES TRADES WORKING ABOVE IN TRUSS'S. MATERIAL, TOOLS ETC, SCATTERED THROUGHOUT ON THE FLOOR MAKING TRIP HAZARDS WHILE LOOKING UP INSPECTING. ALSO NEED A CLEAN, READABLE, IN NUMERICAL ORDER SET OF PLANS. | |||
| LATH/BRICK/ WATER BARRIER | 02/26/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/21/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 2/21/24- Please submit and have onsite plan detail on Front entry wood frame tie downs and anchors. 2/20/2024 - PREVIOUS INSPECTION NOTES 2/20/24- Please reschedule when Inspector is able to be in building without trip hazzards, and overhead working. floor is a mess and installers are onsite. 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need plans on site for inspection, House plans not in box FBC 107.3 2/15/2024 - PREVIOUS INSPECTION NOTES TRADES WORKING ABOVE IN TRUSS'S. MATERIAL, TOOLS ETC, SCATTERED THROUGHOUT ON THE FLOOR MAKING TRIP HAZARDS WHILE LOOKING UP INSPECTING. ALSO NEED A CLEAN, READABLE, IN NUMERICAL ORDER SET OF PLANS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/20/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 2/20/24- Please reschedule when Inspector is able to be in building without trip hazzards, and overhead working. floor is a mess and installers are onsite. 2/16/2024 - PREVIOUS INSPECTION NOTES 2-16-24 Need plans on site for inspection, House plans not in box FBC 107.3 2/15/2024 - PREVIOUS INSPECTION NOTES TRADES WORKING ABOVE IN TRUSS'S. MATERIAL, TOOLS ETC, SCATTERED THROUGHOUT ON THE FLOOR MAKING TRIP HAZARDS WHILE LOOKING UP INSPECTING. ALSO NEED A CLEAN, READABLE, IN NUMERICAL ORDER SET OF PLANS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/16/2024 | Disapproved - NO FEE | LMILLER |
| Note: 2-16-24 Need plans on site for inspection, House plans not in box FBC 107.3 2/15/2024 - PREVIOUS INSPECTION NOTES TRADES WORKING ABOVE IN TRUSS'S. MATERIAL, TOOLS ETC, SCATTERED THROUGHOUT ON THE FLOOR MAKING TRIP HAZARDS WHILE LOOKING UP INSPECTING. ALSO NEED A CLEAN, READABLE, IN NUMERICAL ORDER SET OF PLANS. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/15/2024 | Disapproved - NO FEE | FWILLIS |
| Note: TRADES WORKING ABOVE IN TRUSS'S. MATERIAL, TOOLS ETC, SCATTERED THROUGHOUT ON THE FLOOR MAKING TRIP HAZARDS WHILE LOOKING UP INSPECTING. ALSO NEED A CLEAN, READABLE, IN NUMERICAL ORDER SET OF PLANS. | |||
| ELECTRIC-TUG | 02/15/2024 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: MISSING MAIN BREAKER | |||
| ROOF VALLEY & METAL | 02/15/2024 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 02/13/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 02/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: SEWER TIE IN WAS DONE BY ANOTHER PLUMBING CONTRACTOR | |||
| WALL SHEATHING | 02/06/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING | 02/06/2024 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 02/05/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/24/2024 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 01/16/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/12/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/15/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/28/2024 | 05/31/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/28/2024 | 03/04/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/02/2024 | 02/02/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please submit "Foundation Survey" Most recent submission is a Boundary Survey. | |||
| ZON | COMPLETE | 02/02/2024 | 02/02/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/02/2024 | 02/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/02/2024 | 02/02/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/10/2024 | 01/10/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/12/2023 | 11/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/11/2023 | 10/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/11/2023 | 10/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/11/2023 | 10/11/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/03/2023 | 10/06/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/03/2023 | 10/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/03/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/03/2023 | 10/04/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey. | |||
| GAS | CANCEL | 10/03/2023 | 10/05/2023 |
| LOCATE | COMPLETE | 10/03/2023 | 10/05/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/03/2023 | 10/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/03/2023 | 10/04/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/03/2023 | 10/04/2023 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/03/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - RESIDENTIAL | ¤32.50 | 06/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/28/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/23/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/23/2024 |
| WATER- TURN ON | ¤25.00 | 11/14/2023 |
| ADJUSTMENT 50% | (¤403.30) | 11/14/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/14/2023 |
| INSPECTION - RESIDENTIAL | ¤605.00 | 11/14/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤171.60 | 11/14/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/14/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/14/2023 |
| IMPACT FEE FIRE | ¤428.09 | 11/14/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/14/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/14/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 11/14/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/14/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/14/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/14/2023 |
| SURCHARGE FS 533.721 | ¤4.03 | 11/14/2023 |
| SURCHARGE - FS 468.631 | ¤6.05 | 11/14/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/14/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/14/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/14/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/14/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/14/2023 |
| SEWER CREDIT | (¤1,147.00) | 11/14/2023 |
| SEWER INSPECTION | ¤25.00 | 11/14/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/14/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/14/2023 |
| SITE PLAN 30 | ¤30.00 | 11/14/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,340.42 |