I want to search for...
Permit #2023100113
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00380-0010 |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| CONDITIONED SPACE: 2306 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 407-209-9705 |
| Location Address: 37 POST VIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/19/2023 |
| NOC: RECORDED |
| Applicant name: ROBERT W PEEBLES |
| Owner: BRITE LEGACY LLC |
|
Address 6751 FORUM DRIVE ORLANDO, FL 32821 |
|
Address SUITE 210 ORLANDO, FL 32821 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤253,716.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
7345 GREEN BRIAR PKWY ORLANDO, FL 32819 |
CGC1511452 (Exp: 08/31/2024) | 407-209-9705 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/01/2024 | FINAL APPROVED | LFITZGERALD |
| Note: 7/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/31/2024 9:44:05 AM *** sewer clean out still loose and needs lowering flush to grade/need access to garage to check pep breaker 7/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/30/2024 9:25:26 AM *** wiresfor power now present BUT NT HOOKED INTO PEP PANEL/SEWER CLEAN OUT PIPE IS LOOSE IN WYE FITTING-SECURE AND FLUSH LINE SO GET RID OFANY ACCUMULATEDE SOILS THAT MIGHT NOW BE IN THE PIPE New inspection due to canceled inspection 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence | |||
| U -UTILITY RESIDENTIAL FINAL | 07/31/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/31/2024 9:44:05 AM *** sewer clean out still loose and needs lowering flush to grade/need access to garage to check pep breaker 7/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/30/2024 9:25:26 AM *** wiresfor power now present BUT NT HOOKED INTO PEP PANEL/SEWER CLEAN OUT PIPE IS LOOSE IN WYE FITTING-SECURE AND FLUSH LINE SO GET RID OFANY ACCUMULATEDE SOILS THAT MIGHT NOW BE IN THE PIPE New inspection due to canceled inspection 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence | |||
| U -UTILITY RESIDENTIAL FINAL | 07/30/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/30/2024 9:25:26 AM *** wiresfor power now present BUT NT HOOKED INTO PEP PANEL/SEWER CLEAN OUT PIPE IS LOOSE IN WYE FITTING-SECURE AND FLUSH LINE SO GET RID OFANY ACCUMULATEDE SOILS THAT MIGHT NOW BE IN THE PIPE New inspection due to canceled inspection 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence | |||
| U -UTILITY RESIDENTIAL FINAL | 07/29/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence | |||
| BLD - BUILDING FINAL | 07/29/2024 | FINAL APPROVED | LMILLER |
| U-CROSS CONNECTION | 07/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/26/2024 9:59:38 AM *** has potable irr with PVB=-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 07/26/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 7/16/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 07/26/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 7/16/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/26/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/16/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 PLEASE CHIP ALL OVER POUR CONCRETE AT GARAGE AND LEFT MITER END FOOTER NEEDS TO BE A MINIMUM OF 6" DEEP. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------------- 6/5/2024 - PREVIOUS INSPECTION NOTES 6/5/24 YOU HAVE A PILE OF ROCKS IN THE APRON ON THE LEFT SIDE OF THE POUR THAT NEED TO BE REMOVED AND/OR GRADED SO THAT YOU WILL HAVE THE REQUIRED 6" MINIMUM AMOUNT OF CONCRTERE COVERAGE THRUOUT THE ENTIRE DRIVEWAY APRON. SEE PHOTO FOR REFERENCE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/16/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/16/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 07/08/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 4/10/24: FPL emailed at @ 11:25 - Approved for TUG. 7-8-24 1. Emailed FPL at 12:54. | |||
| FLOOR / WALL PENETRATION | 07/08/2024 | APPROVED | BTAYLOR |
| GRAVITY SEWER TEST | 06/10/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2095 TAP WAS MADE BUT GRAVITY SEWERFAILED FOR NOT TESTED.THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 06/07/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: TAP WAS MADE BUT GRAVITY SEWERFAILED FOR NOT TESTED | |||
| GRAVITY SEWER TEST | 06/07/2024 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO TEST ON GRAVITY SEWER LINE | |||
| ROW- PRE-APRON (PRE-POUR) | 06/06/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE CHIP ALL OVER POUR CONCRETE AT GARAGE AND LEFT MITER END FOOTER NEEDS TO BE A MINIMUM OF 6" DEEP. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------------- 6/5/2024 - PREVIOUS INSPECTION NOTES 6/5/24 YOU HAVE A PILE OF ROCKS IN THE APRON ON THE LEFT SIDE OF THE POUR THAT NEED TO BE REMOVED AND/OR GRADED SO THAT YOU WILL HAVE THE REQUIRED 6" MINIMUM AMOUNT OF CONCRTERE COVERAGE THRUOUT THE ENTIRE DRIVEWAY APRON. SEE PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/05/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 6/5/24 YOU HAVE A PILE OF ROCKS IN THE APRON ON THE LEFT SIDE OF THE POUR THAT NEED TO BE REMOVED AND/OR GRADED SO THAT YOU WILL HAVE THE REQUIRED 6" MINIMUM AMOUNT OF CONCRTERE COVERAGE THRUOUT THE ENTIRE DRIVEWAY APRON. SEE PHOTO FOR REFERENCE. | |||
| PEP TANK INSTALLATION REQUEST | 05/20/2024 | APPROVED | CBOWERMASTER |
| Note: 5/17/2024 9:45:05 AM- PREVIOUS INSPECTION NOTES stucco and dumpster | |||
| PEP TANK INSTALLATION REQUEST | 05/16/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: stucco and dumpster | |||
| LATH/BRICK/ WATER BARRIER | 05/14/2024 | APPROVED | RSIMS |
| WINDOW NAILING | 05/10/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 05-03-2024 1. No pressure on water distribution lines. Check at next inspection. 2. Back door not installed . Window nailing will be added. Check at next inspection. | |||
| INSULATION | 05/10/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 05-03-2024 1. No pressure on water distribution lines. Check at next inspection. 2. Back door not installed . Window nailing will be added. Check at next inspection. | |||
| ALL ROUGH | 05/03/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 05-03-2024 1. No pressure on water distribution lines. Check at next inspection. 2. Back door not installed . Window nailing will be added. Check at next inspection. | |||
| ROOF VALLEY & METAL | 04/24/2024 | APPROVED | KSANDOE |
| WALL SHEATHING | 04/19/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 4/3/24: Approved as noted to keep project moving. Please make sure it is rfesolved prior to the next inspection. 1). 2- window sills have mortar beds that exceed the maximum 1/2" thickness as required by FBC-R606.3.1. 2). Please install a silt fence around the 3 sides of the property as required by FBC-3307.1 - Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/19/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 4/3/24: Approved as noted to keep project moving. Please make sure it is rfesolved prior to the next inspection. 1). 2- window sills have mortar beds that exceed the maximum 1/2" thickness as required by FBC-R606.3.1. 2). Please install a silt fence around the 3 sides of the property as required by FBC-3307.1 - Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. | |||
| ELECTRIC-TUG | 04/10/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/10/24: FPL emailed at @ 11:25 - Approved for TUG. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/05/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/03/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/3/24: Approved as noted to keep project moving. Please make sure it is rfesolved prior to the next inspection. 1). 2- window sills have mortar beds that exceed the maximum 1/2" thickness as required by FBC-R606.3.1. 2). Please install a silt fence around the 3 sides of the property as required by FBC-3307.1 - Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection. | |||
| ELECTRIC-TUG | 03/27/2024 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 03/26/2024 | Disapproved - NO FEE | RSIMS |
| Note: 3/26/24: * Please clean out minor dirt cave-in into footers at garage front & right side. Highlighted on plan. | |||
| MONOLITHIC SLAB | 03/26/2024 | APPROVED | RSIMS |
| Note: 3/26/24: Approved corrections verified via Facetime video/audio app at @ 14:45. 3/26/2024 - PREVIOUS INSPECTION NOTES 3/26/24: * Please clean out minor dirt cave-in into footers at garage front & right side. Highlighted on plan. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/20/2024 | FINAL APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 02/26/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 07/24/2024 | 07/24/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/18/2024 | 07/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/09/2024 | 07/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/09/2024 | 07/15/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 07/09/2024 | 07/09/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/29/2024 | 05/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/05/2024 | 04/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/05/2024 | 04/05/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/15/2023 | 11/16/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/15/2023 | 11/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/15/2023 | 11/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/04/2023 | 10/04/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey. | |||
| GAS | CANCEL | 10/04/2023 | 10/09/2023 |
| LOCATE | COMPLETE | 10/04/2023 | 10/06/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/04/2023 | 10/04/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/04/2023 | 10/04/2023 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/01/2024 |
| REINSPECTION FEE | ¤40.00 | 08/01/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 07/29/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/29/2024 |
| REINSPECTION FEE | ¤40.00 | 07/29/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/29/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 07/29/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 12/19/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/19/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/19/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/19/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/19/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/19/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/19/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/19/2023 |
| CONNECTION FEES | ¤1,166.26 | 12/19/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 12/19/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 12/19/2023 |
| WATER- TURN ON | ¤25.00 | 12/19/2023 |
| ADJUSTMENT 50% | (¤512.73) | 12/19/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/19/2023 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 12/19/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 12/19/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/19/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/19/2023 |
| SEWER CREDIT | (¤2,465.75) | 12/19/2023 |
| SEWER INSPECTION | ¤25.00 | 12/19/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 12/19/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 12/19/2023 |
| SITE PLAN 30 | ¤30.00 | 12/19/2023 |
| SURCHARGE FS 533.721 | ¤5.13 | 12/19/2023 |
| SURCHARGE - FS 468.631 | ¤7.69 | 12/19/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/19/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/19/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/19/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,311.34 |