I want to search for...

Permit #2023100113

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00380-0010
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
CONDITIONED SPACE: 2306 sqft
Total Square Footage: 2942 sqft
Block: 00380
Subdivision: -
Job Phone: 407-209-9705
Location Address: 37 POST VIEW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/19/2023
NOC: RECORDED
Applicant name: ROBERT W PEEBLES
Owner: BRITE LEGACY LLC

Address

6751 FORUM DRIVE

ORLANDO, FL 32821

Address

SUITE 210

ORLANDO, FL 32821

Lot: 0010
Contracted Stated Job Value: ¤253,716.00
Job Description: Single Family Residence
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
INACTIVE

7345 GREEN BRIAR PKWY

ORLANDO, FL 32819

CGC1511452 (Exp: 08/31/2024) 407-209-9705

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CFC1430061 (Exp: 08/31/2026) 407-404-4000
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/01/2024 FINAL APPROVED LFITZGERALD
Note: 7/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/31/2024 9:44:05 AM *** sewer clean out still loose and needs lowering flush to grade/need access to garage to check pep breaker 7/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/30/2024 9:25:26 AM *** wiresfor power now present BUT NT HOOKED INTO PEP PANEL/SEWER CLEAN OUT PIPE IS LOOSE IN WYE FITTING-SECURE AND FLUSH LINE SO GET RID OFANY ACCUMULATEDE SOILS THAT MIGHT NOW BE IN THE PIPE New inspection due to canceled inspection 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence
U -UTILITY RESIDENTIAL FINAL 07/31/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/31/2024 9:44:05 AM *** sewer clean out still loose and needs lowering flush to grade/need access to garage to check pep breaker 7/30/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/30/2024 9:25:26 AM *** wiresfor power now present BUT NT HOOKED INTO PEP PANEL/SEWER CLEAN OUT PIPE IS LOOSE IN WYE FITTING-SECURE AND FLUSH LINE SO GET RID OFANY ACCUMULATEDE SOILS THAT MIGHT NOW BE IN THE PIPE New inspection due to canceled inspection 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence
U -UTILITY RESIDENTIAL FINAL 07/30/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/30/2024 9:25:26 AM *** wiresfor power now present BUT NT HOOKED INTO PEP PANEL/SEWER CLEAN OUT PIPE IS LOOSE IN WYE FITTING-SECURE AND FLUSH LINE SO GET RID OFANY ACCUMULATEDE SOILS THAT MIGHT NOW BE IN THE PIPE New inspection due to canceled inspection 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence
U -UTILITY RESIDENTIAL FINAL 07/29/2024 CANCELLED BY APPLICANT WEB
Note: 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence
BLD - BUILDING FINAL 07/29/2024 FINAL APPROVED LMILLER
U-CROSS CONNECTION 07/26/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/26/2024 9:59:38 AM *** has potable irr with PVB=-no cross connection
ROW - FINAL APRON (AFTER POUR) 07/26/2024 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 7/16/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 07/26/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 7/16/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 07/26/2024 Disapproved -FEE REQUIRED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/26/2024 10:00:22 AM *** no power connected to pep panel from residence
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/16/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 PLEASE CHIP ALL OVER POUR CONCRETE AT GARAGE AND LEFT MITER END FOOTER NEEDS TO BE A MINIMUM OF 6" DEEP. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------------- 6/5/2024 - PREVIOUS INSPECTION NOTES 6/5/24 YOU HAVE A PILE OF ROCKS IN THE APRON ON THE LEFT SIDE OF THE POUR THAT NEED TO BE REMOVED AND/OR GRADED SO THAT YOU WILL HAVE THE REQUIRED 6" MINIMUM AMOUNT OF CONCRTERE COVERAGE THRUOUT THE ENTIRE DRIVEWAY APRON. SEE PHOTO FOR REFERENCE.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/16/2024 APPROVED - AS NOTED FSLADISH
Note: 7/16/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 07/08/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 4/10/24: FPL emailed at @ 11:25 - Approved for TUG. 7-8-24 1. Emailed FPL at 12:54.
FLOOR / WALL PENETRATION 07/08/2024 APPROVED BTAYLOR
GRAVITY SEWER TEST 06/10/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2095 TAP WAS MADE BUT GRAVITY SEWERFAILED FOR NOT TESTED.THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 06/07/2024 APPROVED - AS NOTED MGIBSON
Note: TAP WAS MADE BUT GRAVITY SEWERFAILED FOR NOT TESTED
GRAVITY SEWER TEST 06/07/2024 Disapproved -FEE REQUIRED MGIBSON
Note: NO TEST ON GRAVITY SEWER LINE
ROW- PRE-APRON (PRE-POUR) 06/06/2024 APPROVED - AS NOTED PFLANAGAN
Note: PLEASE CHIP ALL OVER POUR CONCRETE AT GARAGE AND LEFT MITER END FOOTER NEEDS TO BE A MINIMUM OF 6" DEEP. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. ------------------------------------------------------------------------------------- 6/5/2024 - PREVIOUS INSPECTION NOTES 6/5/24 YOU HAVE A PILE OF ROCKS IN THE APRON ON THE LEFT SIDE OF THE POUR THAT NEED TO BE REMOVED AND/OR GRADED SO THAT YOU WILL HAVE THE REQUIRED 6" MINIMUM AMOUNT OF CONCRTERE COVERAGE THRUOUT THE ENTIRE DRIVEWAY APRON. SEE PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 06/05/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 6/5/24 YOU HAVE A PILE OF ROCKS IN THE APRON ON THE LEFT SIDE OF THE POUR THAT NEED TO BE REMOVED AND/OR GRADED SO THAT YOU WILL HAVE THE REQUIRED 6" MINIMUM AMOUNT OF CONCRTERE COVERAGE THRUOUT THE ENTIRE DRIVEWAY APRON. SEE PHOTO FOR REFERENCE.
PEP TANK INSTALLATION REQUEST 05/20/2024 APPROVED CBOWERMASTER
Note: 5/17/2024 9:45:05 AM- PREVIOUS INSPECTION NOTES stucco and dumpster
PEP TANK INSTALLATION REQUEST 05/16/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: stucco and dumpster
LATH/BRICK/ WATER BARRIER 05/14/2024 APPROVED RSIMS
WINDOW NAILING 05/10/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 05-03-2024 1. No pressure on water distribution lines. Check at next inspection. 2. Back door not installed . Window nailing will be added. Check at next inspection.
INSULATION 05/10/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 05-03-2024 1. No pressure on water distribution lines. Check at next inspection. 2. Back door not installed . Window nailing will be added. Check at next inspection.
ALL ROUGH 05/03/2024 APPROVED - AS NOTED AGAETANO
Note: 05-03-2024 1. No pressure on water distribution lines. Check at next inspection. 2. Back door not installed . Window nailing will be added. Check at next inspection.
ROOF VALLEY & METAL 04/24/2024 APPROVED KSANDOE
WALL SHEATHING 04/19/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2340 4/3/24: Approved as noted to keep project moving. Please make sure it is rfesolved prior to the next inspection. 1). 2- window sills have mortar beds that exceed the maximum 1/2" thickness as required by FBC-R606.3.1. 2). Please install a silt fence around the 3 sides of the property as required by FBC-3307.1 - Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/19/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2340 4/3/24: Approved as noted to keep project moving. Please make sure it is rfesolved prior to the next inspection. 1). 2- window sills have mortar beds that exceed the maximum 1/2" thickness as required by FBC-R606.3.1. 2). Please install a silt fence around the 3 sides of the property as required by FBC-3307.1 - Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.
ELECTRIC-TUG 04/10/2024 APPROVED - AS NOTED RSIMS
Note: 4/10/24: FPL emailed at @ 11:25 - Approved for TUG.
FOUND SURVEY APPROVED (OFFICE) 04/05/2024 APPROVED TBAKER
TIE BEAM / LINTEL 04/03/2024 APPROVED - AS NOTED RSIMS
Note: 4/3/24: Approved as noted to keep project moving. Please make sure it is rfesolved prior to the next inspection. 1). 2- window sills have mortar beds that exceed the maximum 1/2" thickness as required by FBC-R606.3.1. 2). Please install a silt fence around the 3 sides of the property as required by FBC-3307.1 - Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) to avoid disapproved inspections with fee going forward. This must be complete prior to scheduling the next inspection.
ELECTRIC-TUG 03/27/2024 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 03/26/2024 Disapproved - NO FEE RSIMS
Note: 3/26/24: * Please clean out minor dirt cave-in into footers at garage front & right side. Highlighted on plan.
MONOLITHIC SLAB 03/26/2024 APPROVED RSIMS
Note: 3/26/24: Approved corrections verified via Facetime video/audio app at @ 14:45. 3/26/2024 - PREVIOUS INSPECTION NOTES 3/26/24: * Please clean out minor dirt cave-in into footers at garage front & right side. Highlighted on plan.
PLUMBING 1ST ROUGH UNDERGROUND 03/20/2024 FINAL APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 02/26/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ZON COMPLETE 07/24/2024 07/24/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 07/18/2024 07/23/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/09/2024 07/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/09/2024 07/15/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 07/09/2024 07/09/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 04/29/2024 05/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/05/2024 04/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/05/2024 04/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/15/2023 11/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/15/2023 11/16/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 11/15/2023 11/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/15/2023 11/15/2023
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
SWALE COMPLETE 11/15/2023 11/29/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 10/04/2023 10/09/2023
Note: Released By: JPI
CUSVC COMPLETE 10/04/2023 10/09/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 10/04/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 10/04/2023 10/04/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey.
GAS CANCEL 10/04/2023 10/09/2023
LOCATE COMPLETE 10/04/2023 10/06/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 10/04/2023 10/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/04/2023 10/04/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 10/04/2023 10/04/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
BADMIN COMPLETE 10/04/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 08/01/2024
REINSPECTION FEE ¤40.00 08/01/2024
UTILITY PEP REINSPECTION ¤40.00 07/29/2024
SW ENG REINSPECTION 30 ¤30.00 07/29/2024
REINSPECTION FEE ¤40.00 07/29/2024
PLAN REVIEW - REVISION ¤32.50 07/29/2024
REINSPECTION RESIDENTIAL ¤40.00 07/29/2024
CONTRACTOR CHANGE ¤20.00 07/29/2024
FC IMPACT FEE EMS ¤62.00 12/19/2023
IMPACT FEE FIRE ¤428.09 12/19/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/19/2023
FC IMPACT FEE LIBRARY ¤268.00 12/19/2023
IMPACT FEE PARKS ¤1,800.99 12/19/2023
IMPACT FEE SCHOOL ¤5,450.00 12/19/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 12/19/2023
WATER -IRRIGATION INSPECTION ¤25.00 12/19/2023
CONNECTION FEES ¤1,166.26 12/19/2023
CONTRACTOR CHANGE ¤20.00 12/19/2023
CONTRACTOR CHANGE ¤20.00 12/19/2023
WATER- TURN ON ¤25.00 12/19/2023
ADJUSTMENT 50% (¤512.73) 12/19/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/19/2023
INSPECTION - RESIDENTIAL ¤775.50 12/19/2023
PLAN REVIEW - RESIDENTIAL ¤219.96 12/19/2023
SW ENG - REVIEW 20 ¤20.00 12/19/2023
SW ENG RES REVIEW 200 ¤200.00 12/19/2023
SEWER CREDIT (¤2,465.75) 12/19/2023
SEWER INSPECTION ¤25.00 12/19/2023
SEWER CAPITAL FACILITY ¤5,344.82 12/19/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 12/19/2023
SITE PLAN 30 ¤30.00 12/19/2023
SURCHARGE FS 533.721 ¤5.13 12/19/2023
SURCHARGE - FS 468.631 ¤7.69 12/19/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/19/2023
SW ENG INSPECTION 80 ¤80.00 12/19/2023
SW ENG PRE APRON ¤30.00 12/19/2023
Fees Total Due: ¤0.00 Total Paid: ¤19,311.34