I want to search for...
Permit #2023100176
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00090-0160 |
| CONDITIONED SPACE: 2376 sqft |
| GARAGE: 776 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| PATIO/DECK (NO ROOF) : 474 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| Total Square Footage: 3864 sqft |
| Block: 00090 |
| Subdivision: 3061 - |
| Job Phone: 407-808-8155 |
| Location Address: 106 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/26/2023 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/18/2024 | FINAL APPROVED | BTAYLOR |
| Note: 9/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 9/20/2024 8:21:54 AM *** Cancelled per Mason, (not ready) | |||
| BLD - BUILDING FINAL | 09/20/2024 | CANCELLED BY APPLICANT | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 9/20/2024 8:21:54 AM *** Cancelled per Mason, (not ready) | |||
| U-CROSS CONNECTION | 08/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/26/2024 10:09:43 AM *** reclaim irr-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 08/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 8/26/2024 10:11:41 AM *** please contact customer-service@palmcoastgov.com to have water meter box raised-is a potebtial trip hazard,also get with Greg and check elevation of box earlier during build out and if too low/high then contact city to adjust | |||
| ROW - FINAL APRON (AFTER POUR) | 08/23/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9471 8/23/24 UPON WALKING PROPERTY DETERMINED THAT WHILE IT IS A BIT STEEP IN THE REAR OF THE PROPERTY THE SURVEY ELEVATIONS SHOW THAT FALL AND FLOW NUMBERS INDICATE POSITIVE DRAINAGE. APPROVING AS NOTED At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/23/2024 | APPROVED | FSLADISH |
| Note: 8/23/24 SURVEY REFLECTS REVISED SITE PLAN AT THE TIME OF THIS INSPECTION. ____________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/23/2024 | APPROVED | FSLADISH |
| Note: 8/23/24 UPON WALKING PROPERTY DETERMINED THAT WHILE IT IS A BIT STEEP IN THE REAR OF THE PROPERTY THE SURVEY ELEVATIONS SHOW THAT FALL AND FLOW NUMBERS INDICATE POSITIVE DRAINAGE. APPROVING AS NOTED At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. | |||
| ROW - STORMWATER FINAL | 08/23/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/23/24 UPON WALKING PROPERTY DETERMINED THAT WHILE IT IS A BIT STEEP IN THE REAR OF THE PROPERTY THE SURVEY ELEVATIONS SHOW THAT FALL AND FLOW NUMBERS INDICATE POSITIVE DRAINAGE. APPROVING AS NOTED At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/15/2024 | CANCELLED BY APPLICANT | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 06/21/2024 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ------------------------------------------------------------------- 6/12/2024 - PREVIOUS INSPECTION NOTES 06/12/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 06/12/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 06/12/2024 | PARTIALLY APPROVED | TPOLACEK |
| Note: 06/12/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ELECTRIC - EARLY POWER | 06/12/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6/7/2024 - PREVIOUS INSPECTION NOTES 6/7/24: 1). Kitchen island outlets are missing the devices or blank covers. 2). Check garage attic access light fixture. Inspector Notes from Inspection 2200 12-14-23 1. Emailed FPL at 9:00. 6-12-24 1. House is hot. | |||
| ELECTRIC - EARLY POWER | 06/12/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 6/12/2024 - PREVIOUS INSPECTION NOTES 6/7/2024 - PREVIOUS INSPECTION NOTES 6/7/24: 1). Kitchen island outlets are missing the devices or blank covers. 2). Check garage attic access light fixture. Inspector Notes from Inspection 2200 12-14-23 1. Emailed FPL at 9:00. 6-12-24 1. House is hot. 6-12-24 1. Emailed FPL at 2:11. | |||
| TIE BEAM / LINTEL | 06/11/2024 | APPROVED | BTAYLOR |
| ELECTRIC - EARLY POWER | 06/07/2024 | Disapproved - NO FEE | RSIMS |
| Note: 6/7/24: 1). Kitchen island outlets are missing the devices or blank covers. 2). Check garage attic access light fixture. Inspector Notes from Inspection 2200 12-14-23 1. Emailed FPL at 9:00. | |||
| GRAVITY SEWER TEST | 03/28/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 03/28/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 02/28/2024 | APPROVED | BTAYLOR |
| INSULATION | 02/16/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 02/13/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 01/16/2024 | APPROVED | BTAYLOR |
| WALL SHEATHING | 01/05/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/02/2024 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 12/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12-14-23 1. Emailed FPL at 9:00. | |||
| TIE BEAM / LINTEL | 12/12/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 12/11/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/30/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/28/2023 | APPROVED | MGIBSON |
| FOOTER | 11/06/2023 | APPROVED | RSIMS |
| WATER METER INSTALLATION REQUEST | 10/27/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/19/2024 | 08/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/19/2024 | 08/20/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/19/2024 | 08/19/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/11/2023 | 12/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/11/2023 | 12/11/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/18/2023 | 10/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/12/2023 | 10/13/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition (Second Request) | |||
| URB | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/04/2023 | 10/09/2023 |
| LOCATE | COMPLETE | 10/04/2023 | 10/06/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/04/2023 | 10/09/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| SW1 | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/04/2023 | 10/05/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide left side setback from the courtyard corner wall to property line on site plan/survey | |||
| BADMIN | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 10/26/2023 |
| WATER-METER | ¤419.86 | 10/26/2023 |
| ADJUSTMENT 50% | (¤588.63) | 10/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/26/2023 |
| INSPECTION - RESIDENTIAL | ¤893.75 | 10/26/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤253.50 | 10/26/2023 |
| CONNECTION FEES | ¤25.00 | 10/26/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/26/2023 |
| IMPACT FEE FIRE | ¤428.09 | 10/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/26/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/26/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 10/26/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 10/26/2023 |
| SURCHARGE FS 533.721 | ¤5.89 | 10/26/2023 |
| SURCHARGE - FS 468.631 | ¤8.83 | 10/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/26/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/26/2023 |
| SEWER INSPECTION | ¤25.00 | 10/26/2023 |
| SITE PLAN 30 | ¤30.00 | 10/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,496.67 |