I want to search for...
Permit #2023100199
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00530-0030 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00530 |
| Subdivision: - |
| Job Phone: 912-258-2201 |
| Location Address: 5 PINE BUSH LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/28/2024 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤215,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/01/2024 | FINAL APPROVED | RSIMS |
| Note: 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24: 1). Shingle over small garage door area (6th row up from drip edge/eave drip) has a nail through it and will need to be replaced. FBC[A] 107.4 2). GFCI Outlet at small side kitchen counter on right needs to be replaced as it will not trip and is showing open ground on tester. FBC-E3902.6 3). Kitchen counter outlet to the left of the range is excessively loose. (NEC-406.6) 4). Back left guest bathroom: Toilet flapper needs to be adjusted so that it flushes properly without the need to hold the handle down the entire time. (FBC-P2705.1(4)). 5). Dryer duct needs to be sealed as required > FBC-M1502.4.7 -- Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked "future use" | |||
| BLD - BUILDING FINAL | 09/25/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/25/2024 12:57:05 PM *** 9/25/24: 1). Shingle over small garage door area (6th row up from drip edge/eave drip) has a nail through it and will need to be replaced. FBC[A] 107.4 2). GFCI Outlet at small side kitchen counter on right needs to be replaced as it will not trip and is showing open ground on tester. FBC-E3902.6 3). Kitchen counter outlet to the left of the range is excessively loose. (NEC-406.6) 4). Back left guest bathroom: Toilet flapper needs to be adjusted so that it flushes properly without the need to hold the handle down the entire time. (FBC-P2705.1(4)). 5). Dryer duct needs to be sealed as required > FBC-M1502.4.7 -- Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked "future use" | |||
| U-CROSS CONNECTION | 09/25/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/25/2024 10:24:47 AM *** no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 09/25/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 09/25/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 09/25/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/19/2024 | APPROVED | TPOLACEK |
| Note: 9/11/2024 - PREVIOUS INSPECTION NOTES 9/11/24 YOU NEED TO PROVIDE THE INVERT/DRAINAGE ELEVATIONS WITHIN 100 FT FOR THE PROPERTIES ON BOTH SIDES OF YOU. Drainage structure within 100 ft must be shown Sec 300.01A8 "Sec 300.01A8 The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including, culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property." Inspector Notes from Inspection 9270 08/09/24 TPOLACEK*** PLEASE MAKE SURE MITER FORMS ARE 9" TO SIDE OF CULVERT AT END OF MITER CUT AND 18" TO THE SIDE OF CULVERT AT EDGE OF DRIVEWAY. PLEASE MAKE SURE THAT CULVERT BAND CLAMP BOLTS FACE DOWNWARD . APPROVING AS NOTEED, AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/19/2024 | APPROVED | TPOLACEK |
| Note: CORRECTIONS MADE, UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 9/11/24 INSPECTORS NOTE...SPOKE TO CM ON SITE. THERE IS A LOW SPOT ON THE LEFT SIDE BY AC UNIT. ALSO THEYARE REQUIRED TO HAVE A 4" GAP BETWEEN SOD AND FENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/11/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/11/24 YOU NEED TO PROVIDE THE INVERT/DRAINAGE ELEVATIONS WITHIN 100 FT FOR THE PROPERTIES ON BOTH SIDES OF YOU. Drainage structure within 100 ft must be shown Sec 300.01A8 "Sec 300.01A8 The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including, culverts, inlets, swales, weirs, etc. both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the property." Inspector Notes from Inspection 9270 08/09/24 TPOLACEK*** PLEASE MAKE SURE MITER FORMS ARE 9" TO SIDE OF CULVERT AT END OF MITER CUT AND 18" TO THE SIDE OF CULVERT AT EDGE OF DRIVEWAY. PLEASE MAKE SURE THAT CULVERT BAND CLAMP BOLTS FACE DOWNWARD . APPROVING AS NOTEED, AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/09/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 08/09/24 TPOLACEK*** PLEASE MAKE SURE MITER FORMS ARE 9" TO SIDE OF CULVERT AT END OF MITER CUT AND 18" TO THE SIDE OF CULVERT AT EDGE OF DRIVEWAY. PLEASE MAKE SURE THAT CULVERT BAND CLAMP BOLTS FACE DOWNWARD . APPROVING AS NOTEED, AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. | |||
| ELECTRIC - EARLY POWER | 08/01/2024 | APPROVED | RSIMS |
| Note: 8/1/24: FPL emailed to release power. | |||
| GRAVITY SEWER TEST | 07/23/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO LIST CORRECT PLUMBING SUB-CONTRACTOR BEFORE NEXT INSPECTION,3307.1 PROTECTION OF PROPERTY. NEED SILT FENCE IN PLACE BEFORE NEXT INSPECTION ALSO | |||
| SEWER TIE IN | 07/23/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO LIST CORRECT PLUMBING SUB-CONTRACTOR BEFORE NEXT INSPECTION,3307.1 PROTECTION OF PROPERTY. NEED SILT FENCE IN PLACE BEFORE NEXT INSPECTION ALSO | |||
| PEP TANK INSTALLATION REQUEST | 07/01/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 06/11/2024 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 06/03/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 5/31/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Still missing SP2/SP4 on studs at top plate behind Electrical box. (garage wall). 2). Garage wall: Missing Nail plate for (white) romex at top plate penetration. Marked NP on stud. 3). Please fill the bathtubs to the overflow to check overflow piping. 4). 5ft head pressure failed. Inspector Notes from Inspection 2460 5/2/2024 - PREVIOUS INSPECTION NOTES 5/2/24: Added and Approved a roof sheathing Inspection. 05-08-2024 Sheet 5 of 6 F2 interior wall not per plan. Check at next inspection. | |||
| ALL ROUGH | 05/31/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 5/31/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Still missing SP2/SP4 on studs at top plate behind Electrical box. (garage wall). 2). Garage wall: Missing Nail plate for (white) romex at top plate penetration. Marked NP on stud. 3). Please fill the bathtubs to the overflow to check overflow piping. 4). 5ft head pressure failed. Inspector Notes from Inspection 2460 5/2/2024 - PREVIOUS INSPECTION NOTES 5/2/24: Added and Approved a roof sheathing Inspection. 05-08-2024 Sheet 5 of 6 F2 interior wall not per plan. Check at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/08/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 5/2/2024 - PREVIOUS INSPECTION NOTES 5/2/24: Added and Approved a roof sheathing Inspection. 05-08-2024 Sheet 5 of 6 F2 interior wall not per plan. Check at next inspection. | |||
| ROOF VALLEY & METAL | 05/07/2024 | APPROVED | RSIMS |
| ROOF SHEATHING | 05/02/2024 | APPROVED | RSIMS |
| WALL SHEATHING | 05/02/2024 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/02/2024 | PARTIALLY APPROVED | RSIMS |
| Note: 5/2/24: Added and Approved a roof sheathing Inspection. | |||
| TIE BEAM / LINTEL | 04/24/2024 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2250 4/5/24: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| MONOLITHIC SLAB | 04/05/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 4/5/24: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/03/2024 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/03/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO LIST CORRECT PLUMBING SUB-CONTRACTOR BEFORE NEXT INSPECTION,3307.1 PROTECTION OF PROPERTY. NEED SILT FENCE IN PLACE BEFORE NEXT INSPECTION ALSO | |||
| WATER METER INSTALLATION REQUEST | 03/14/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/03/2024 | 04/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/03/2024 | 04/03/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/12/2023 | 10/18/2023 |
| Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/12/2023 | 11/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/05/2023 | 10/05/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey incomplete - no benchmark, existing elevations, etc. Please see attached informational sheet for ssurvey requirements. | |||
| GAS | CANCEL | 10/05/2023 | 10/09/2023 |
| LOCATE | COMPLETE | 10/05/2023 | 10/06/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/05/2023 | 10/05/2023 |
| Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/05/2023 | 10/06/2023 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Landscape and Floor plans don't match the site plan. | |||
| BADMIN | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 10/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/01/2024 |
| CONNECTION FEES | ¤1,166.26 | 02/28/2024 |
| WATER- TURN ON | ¤25.00 | 02/28/2024 |
| ADJUSTMENT 50% | (¤533.91) | 02/28/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/28/2024 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 02/28/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 02/28/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 02/28/2024 |
| IMPACT FEE FIRE | ¤428.09 | 02/28/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/28/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/28/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 02/28/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/28/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 02/28/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/28/2024 |
| SURCHARGE FS 533.721 | ¤5.34 | 02/28/2024 |
| SURCHARGE - FS 468.631 | ¤8.01 | 02/28/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/28/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/28/2024 |
| SW ENG PRE APRON | ¤30.00 | 02/28/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/28/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/28/2024 |
| SEWER CREDIT | (¤2,828.02) | 02/28/2024 |
| SEWER INSPECTION | ¤25.00 | 02/28/2024 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 02/28/2024 |
| WATER CREDIT | (¤146.38) | 02/28/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 02/28/2024 |
| SITE PLAN 30 | ¤30.00 | 02/28/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,561.90 |