I want to search for...

Permit #2023100219

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0170
CONDITIONED SPACE: 2712 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
PATIO/DECK (NO ROOF) : 442 sqft
Total Square Footage: 4009 sqft
Block: 00090
Subdivision: -
Job Phone: 407-808-8155
Location Address: 110 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/24/2023
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0170
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/18/2024 FINAL APPROVED BTAYLOR
Note: 9/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 9/20/2024 8:22:05 AM *** Cancelled per Mason, (not ready)
BLD - BUILDING FINAL 09/20/2024 CANCELLED BY APPLICANT LMILLER
Note: *** NOTES ADDED BY LMILLER 9/20/2024 8:22:05 AM *** Cancelled per Mason, (not ready)
U -UTILITY RESIDENTIAL FINAL 08/26/2024 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 08/26/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/26/2024 10:08:31 AM *** relaim irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 08/23/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9465 8/23/24 UPON WALKING PROPERTY DETERMINED THAT WHILE IT IS A BIT STEEP IN THE REAR OF THE PROPERTY THE SURVEY ELEVATION SHOW THAT FALL AND FLOW NUMBERS INDICATED POSITIVE DRAINAGE. APPROVING AS NOTED. Inspector Notes from Inspection 9463 8/23/24 FINAL SURVEY NOW REFLECTS REVISED SITE PLAN. APPROVING AS NOTED. _____________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/23/2024 APPROVED - AS NOTED FSLADISH
Note: 8/23/24 FINAL SURVEY NOW REFLECTS REVISED SITE PLAN. APPROVING AS NOTED. _____________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES
ROW FIELD SURVEY /GRADING CERTIFICATION 08/23/2024 APPROVED - AS NOTED FSLADISH
Note: 8/23/24 UPON WALKING PROPERTY DETERMINED THAT WHILE IT IS A BIT STEEP IN THE REAR OF THE PROPERTY THE SURVEY ELEVATION SHOW THAT FALL AND FLOW NUMBERS INDICATED POSITIVE DRAINAGE. APPROVING AS NOTED. Inspector Notes from Inspection 9463 8/23/24 FINAL SURVEY NOW REFLECTS REVISED SITE PLAN. APPROVING AS NOTED. _____________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES
ROW - STORMWATER FINAL 08/23/2024 APPROVED - AS NOTED FSLADISH
Note: 8/23/24 UPON WALKING PROPERTY DETERMINED THAT WHILE IT IS A BIT STEEP IN THE REAR OF THE PROPERTY THE SURVEY ELEVATIONS SHOW THAT FALL AND FLOW NUMBERS INDICATE POSITIVE DRAINAGE. APPROVING AS NOTED At the time of the inspection all minimum city standards and requirements were met. Niether the Inspector nor the city is responsible if, for whatever reason, site conditions change over time after the Inspection. .
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/15/2024 CANCELLED BY APPLICANT FSLADISH
ROW- PRE-APRON (PRE-POUR) 06/21/2024 APPROVED PFLANAGAN
Note: READY FOR PAVERS ---------------------------------------------------------------------- 6/12/2024 - PREVIOUS INSPECTION NOTES 06/12/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PAVER RESTRAINTS 06/12/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 06/12/2024 PARTIALLY APPROVED TPOLACEK
Note: 06/12/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
TIE BEAM / LINTEL 06/11/2024 APPROVED BTAYLOR
ELECTRIC - EARLY POWER 05/29/2024 APPROVED - AS NOTED BTAYLOR
Note: 5-29-24 1. Emailed FPL at 8:56.
LATH/BRICK/ WATER BARRIER 02/28/2024 APPROVED BTAYLOR
INSULATION 02/23/2024 APPROVED BTAYLOR
GRAVITY SEWER TEST 02/21/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE ALL COQUINA FROM INTERIOR OF SLAB BEFORE BACKFILLING ONTO WASTE AND WATER LINES Inspector Notes from Inspection 2060 REMOVE ALL COQUINA FROM INTERIOR OF SLAB BEFORE BACKFILLING ONTO WASTE AND WATER LINES THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 02/21/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE ALL COQUINA FROM INTERIOR OF SLAB BEFORE BACKFILLING ONTO WASTE AND WATER LINES Inspector Notes from Inspection 2060 REMOVE ALL COQUINA FROM INTERIOR OF SLAB BEFORE BACKFILLING ONTO WASTE AND WATER LINES THIS WAS A VIRTUAL INSPECTION
ALL ROUGH 02/20/2024 APPROVED BTAYLOR
ROOF VALLEY & METAL 01/23/2024 APPROVED BTAYLOR
WALL SHEATHING 01/05/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 01-03-2024 1. Garage trusses straps not fastened completely. Check all. 2. A3 DetailA Copula- framing and straps not visible . Please remove a section for inspection. 3. S2 structural fascia screws not visible. 4. S4 Gable end detail not per plan. 5. Truss JO5KA hip at back left has been cut. Please provide engineering and submit to the building department. 6. Address not posted. Check at next inspection. Superintendent on site and will address shiners ASAP.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/03/2024 APPROVED - AS NOTED AGAETANO
Note: 01-03-2024 1. Garage trusses straps not fastened completely. Check all. 2. A3 DetailA Copula- framing and straps not visible . Please remove a section for inspection. 3. S2 structural fascia screws not visible. 4. S4 Gable end detail not per plan. 5. Truss JO5KA hip at back left has been cut. Please provide engineering and submit to the building department. 6. Address not posted. Check at next inspection. Superintendent on site and will address shiners ASAP.
ELECTRIC-TUG 12/21/2023 APPROVED RMARTIN
TIE BEAM / LINTEL 12/20/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 12/11/2023 APPROVED TBAKER
MONOLITHIC SLAB 12/07/2023 APPROVED BTAYLOR
Note: 12/4/2023 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 12/04/2023 CANCELLED BY APPLICANT BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 12/01/2023 APPROVED - AS NOTED MGIBSON
Note: REMOVE ALL COQUINA FROM INTERIOR OF SLAB BEFORE BACKFILLING ONTO WASTE AND WATER LINES
FOOTER 11/06/2023 APPROVED RSIMS
WATER METER INSTALLATION REQUEST 10/27/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 08/19/2024 08/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/19/2024 08/20/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 08/19/2024 08/19/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 01/05/2024 01/05/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 COMPLETE 12/11/2023 12/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/11/2023 12/11/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 10/24/2023 10/24/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 10/24/2023 10/24/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/05/2023 10/13/2023
Note: Released By: JPI
CUSVC COMPLETE 10/05/2023 10/09/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 10/05/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/05/2023 10/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/05/2023 10/09/2023
LOCATE COMPLETE 10/05/2023 10/06/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/05/2023 10/09/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
SW1 COMPLETE 10/05/2023 10/05/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 10/05/2023 10/06/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Provide banding for the window facing the public ROW (right side).
BADMIN COMPLETE 10/05/2023 10/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 10/24/2023
WATER-METER ¤419.86 10/24/2023
ADJUSTMENT 50% (¤639.81) 10/24/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/24/2023
INSPECTION - RESIDENTIAL ¤973.50 10/24/2023
PLAN REVIEW - RESIDENTIAL ¤276.12 10/24/2023
CONNECTION FEES ¤25.00 10/24/2023
FC IMPACT FEE EMS ¤62.00 10/24/2023
IMPACT FEE FIRE ¤428.09 10/24/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/24/2023
FC IMPACT FEE LIBRARY ¤268.00 10/24/2023
IMPACT FEE PARKS ¤1,800.99 10/24/2023
IMPACT FEE SCHOOL ¤5,450.00 10/24/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 10/24/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/24/2023
SURCHARGE FS 533.721 ¤6.40 10/24/2023
SURCHARGE - FS 468.631 ¤9.60 10/24/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/24/2023
SW ENG INSPECTION 80 ¤80.00 10/24/2023
SW ENG PRE APRON ¤30.00 10/24/2023
SW ENG - REVIEW 20 ¤20.00 10/24/2023
SW ENG RES REVIEW 200 ¤200.00 10/24/2023
SEWER INSPECTION ¤25.00 10/24/2023
SEWER CAPITAL FACILITY ¤1,682.11 10/24/2023
WATER CAPITAL FACILITY FEE ¤1,398.48 10/24/2023
SITE PLAN 30 ¤30.00 10/24/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,654.73