I want to search for...

Permit #2023100327

Permit Details

Status: COED

Parcel Id: 42-10-31-5919-00000-0070
CONDITIONED SPACE: 2508 sqft
GARAGE: 515 sqft
OPENED PORCH (WITH ROOF) : 202 sqft
OPENED PORCH (WITH ROOF) : 113 sqft
Total Square Footage: 3338 sqft
Block: 00000
Subdivision: 2085 - TIDELANDS / VILLAGE AT PALM COAST PHASE II
Job Phone: 386-569-7882
Location Address: 46 RIVERVIEW BEND N
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/21/2023
NOC: RECORDED
Applicant name: VLADIMIR V PEREPECHKIN
Owner: ROBERT IDZIOR

Address

46 RIVERVIEW BEND

PALM COAST, FL 32164

Lot: 0070
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

WISE CHOICE CUSTOM HOMES, INC.
Status Location Address State License Number Phone
ACTIVE

77 SOUTHLAKE DR

PALM COAST, FL 32137

CRC1328738 (Exp: 08/31/2026) 386-569-7882

Sub Contractors

MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/22/2024 FINAL APPROVED HCAMACHO
Note: 9/17/2024 - PREVIOUS INSPECTION NOTES 9/13/2024 - PREVIOUS INSPECTION NOTES 9-13-24 1. Energy cals do not match. 2. No front door handle. 3. Smoke alarms are sounding off. 4. Window above master tub is not tempered. 5. No float switch for air handler. 6. No drain pan under air handler. 7. No address on house. 9-17-24 1. Window above master tub is not tempered. On order will need to call back in once window is replaced.
BLD - BUILDING FINAL 09/17/2024 PARTIALLY APPROVED BTAYLOR
Note: 9/13/2024 - PREVIOUS INSPECTION NOTES 9-13-24 1. Energy cals do not match. 2. No front door handle. 3. Smoke alarms are sounding off. 4. Window above master tub is not tempered. 5. No float switch for air handler. 6. No drain pan under air handler. 7. No address on house. 9-17-24 1. Window above master tub is not tempered. On order will need to call back in once window is replaced.
BLD - BUILDING FINAL 09/13/2024 Disapproved -FEE REQUIRED BTAYLOR
Note: 9-13-24 1. Energy cals do not match. 2. No front door handle. 3. Smoke alarms are sounding off. 4. Window above master tub is not tempered. 5. No float switch for air handler. 6. No drain pan under air handler. 7. No address on house.
ROW - FINAL APRON (AFTER POUR) 09/11/2024 APPROVED EMADISON
ROW - STORMWATER FINAL 09/11/2024 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 09/11/2024 FINAL APPROVED DHANEY
ELEVATION CERTIFICATE-FINAL APPROVAL 09/10/2024 APPROVED JMYERS
U-CROSS CONNECTION 09/06/2024 APPROVED DHANEY
Note: 9/5/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 9/5/2024 9:55:19 AM *** Need water meter pit box located to complete Insp. .
U-CROSS CONNECTION 09/05/2024 Disapproved - NO FEE DHANEY
Note: *** NOTES ADDED BY DHANEY 9/5/2024 9:55:19 AM *** Need water meter pit box located to complete Insp. .
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/04/2024 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 09/04/2024 APPROVED EMADISON
ELECTRIC - EARLY POWER 07/30/2024 APPROVED RMARTIN
ROW- PRE-APRON (PRE-POUR) 07/16/2024 APPROVED - AS NOTED EMADISON
Note: ** 07/16/24 READY TO SET PAVERS _________________________________________________________________________________________________________________ 7/12/2024 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY OF PALM COAST STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IF PAVERS ARE DOWN AT THE TIME OF THE INSPECTION ALL PAVER WILL BE REMOVED SO WE CAN INSPECT BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
ROW- PAVER RESTRAINTS 07/12/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 07/12/2024 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED TO CITY OF PALM COAST STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IF PAVERS ARE DOWN AT THE TIME OF THE INSPECTION ALL PAVER WILL BE REMOVED SO WE CAN INSPECT BASE PROPERLY. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS.
GRAVITY SEWER TEST 06/11/2024 APPROVED MGIBSON
SEWER TIE IN 06/11/2024 APPROVED MGIBSON
INSULATION 05/24/2024 APPROVED JWALKER
ALL ROUGH 05/17/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 05/06/2024 APPROVED LMILLER
ROOF VALLEY & METAL 04/05/2024 APPROVED BTAYLOR
WALL SHEATHING 04/05/2024 APPROVED BTAYLOR
Note: 4/1/2024 - PREVIOUS INSPECTION NOTES 3/19/2024 - PREVIOUS INSPECTION NOTES 03-19-2024 Please remove front entry wall sheathing for anchor inspection. Please provide details for front enry framing of three small windows for anchors/connections. 04-01-2024 Above issue has not been resolved. 1. Wall sheathing needs to be removed for anchor inspection at sides of entry where framing connection is to the CMU. Contractor only removed the top area. 2. Wall sheathing can be scheduled following the Braces/Tie Down Inspection at the sides of the entry (left and right of the three small window). 3. Please provide details for front enry framing of three small windows for anchors/connections.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/04/2024 APPROVED AGAETANO
Note: 4/1/2024 - PREVIOUS INSPECTION NOTES 3/19/2024 - PREVIOUS INSPECTION NOTES 03-19-2024 1.Please provide details for front enry framing of three small windows for anchors/connections. 2. Sheet 6 of 6 indicates SP2 on all studs at knee wall. All studs do not have SP2 installed. 3. T16 engineering member missed. 4. Piggyback detail note E not per plan. Plates required. INSPECTION STOPPED. 04-01-2024 Above issues not resolved. 1. Piggyback details not installed as per plan. See note E. 2. Sheet 6 of 6 Typical Attachment Detail at front entry, both sides are not installed as per plan.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/01/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 3/19/2024 - PREVIOUS INSPECTION NOTES 03-19-2024 1.Please provide details for front enry framing of three small windows for anchors/connections. 2. Sheet 6 of 6 indicates SP2 on all studs at knee wall. All studs do not have SP2 installed. 3. T16 engineering member missed. 4. Piggyback detail note E not per plan. Plates required. INSPECTION STOPPED. 04-01-2024 Above issues not resolved. 1. Piggyback details not installed as per plan. See note E. 2. Sheet 6 of 6 Typical Attachment Detail at front entry, both sides are not installed as per plan.
WALL SHEATHING 04/01/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 3/19/2024 - PREVIOUS INSPECTION NOTES 03-19-2024 Please remove front entry wall sheathing for anchor inspection. Please provide details for front enry framing of three small windows for anchors/connections. 04-01-2024 Above issue has not been resolved. 1. Wall sheathing needs to be removed for anchor inspection at sides of entry where framing connection is to the CMU. Contractor only removed the top area. 2. Wall sheathing can be scheduled following the Braces/Tie Down Inspection at the sides of the entry (left and right of the three small window). 3. Please provide details for front enry framing of three small windows for anchors/connections.
WALL SHEATHING 03/19/2024 Disapproved - NO FEE AGAETANO
Note: 03-19-2024 Please remove front entry wall sheathing for anchor inspection. Please provide details for front enry framing of three small windows for anchors/connections.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/19/2024 Disapproved - NO FEE AGAETANO
Note: 03-19-2024 1.Please provide details for front enry framing of three small windows for anchors/connections. 2. Sheet 6 of 6 indicates SP2 on all studs at knee wall. All studs do not have SP2 installed. 3. T16 engineering member missed. 4. Piggyback detail note E not per plan. Plates required. INSPECTION STOPPED.
TIE BEAM / LINTEL 02/27/2024 APPROVED BTAYLOR
ELEV CERT-FOUNDATION APPROVAL 02/14/2024 APPROVED JMYERS
Note: The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
FOUND SURVEY APPROVED (OFFICE) 02/07/2024 APPROVED TBAKER
MONOLITHIC SLAB 01/26/2024 APPROVED KSANDOE
Note: 1/25/2024 - PREVIOUS INSPECTION NOTES 01-25-2024 Multiple areas of the slab depth not per code. 1 /2" and 2 1/4" at two areas. Check all areas. Please have 4-5 lines set up for inspector for next inspection. Thank you.
MONOLITHIC SLAB 01/25/2024 Disapproved - NO FEE AGAETANO
Note: 01-25-2024 Multiple areas of the slab depth not per code. 1 /2" and 2 1/4" at two areas. Check all areas. Please have 4-5 lines set up for inspector for next inspection. Thank you.
PLUMBING 1ST ROUGH UNDERGROUND 01/19/2024 APPROVED MGIBSON
Note: 1/18/2024 - PREVIOUS INSPECTION NOTES NEED TO HAVE STAMPED APPROVED PLANS ON SITE FOR INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 01/18/2024 Disapproved - NO FEE MGIBSON
Note: NEED TO HAVE STAMPED APPROVED PLANS ON SITE FOR INSPECTION
STEM WALL FOUNDATION 01/16/2024 APPROVED AGAETANO
STEM WALL FOUNDATION 12/15/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 12/12/2023 APPROVED BVITALE

Review History

Department Status Date In Date Out
PLFM COMPLETE 09/03/2024 09/10/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
SW1 COMPLETE 08/12/2024 08/12/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/12/2024 08/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/12/2024 08/12/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 08/12/2024 08/12/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/05/2024 08/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 08/05/2024 08/06/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please include driveway apron width at edge of pavement
ZON COMPLETE 08/05/2024 08/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 05/16/2024 05/21/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/07/2024 02/07/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 02/07/2024 02/14/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
ZON COMPLETE 02/07/2024 02/07/2024
Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM
PLENV COMPLETE 11/16/2023 11/16/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM No comment
ZON COMPLETE 11/02/2023 11/02/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
PLENV HOLD 11/02/2023 11/07/2023
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 10/9/23 and 11/7/23 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
ENGIN1 COMPLETE 10/23/2023 10/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/23/2023 10/30/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 10/23/2023 10/23/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Please provide the corrected Landscape plan. 11.03.02.D.2 Foundation Plantings a .Residential homes shall provide foundation plantings consisting of 16 shrubs. On interior lots, eight shrubs shall be planted in front of the home, and four shrubs planted on each side of the home. On corner lots, six shrubs shall be planted on each side of the home facing a street, and four shrubs planted on the interior side of the home. When the rear yard of a home faces a saltwater canal, lake, or golf course, an additional four shrubs shall be planted along the rear of the home. b. All of these required shrubs shall be planted between 2½ and eight feet of the home's foundation. c. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. Shrubbery shall be selected using varying heights to accent and soften walls.
MECH COMPLETE 10/23/2023 10/26/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLFM COMPLETE 10/23/2023 10/24/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO.
BLD COMPLETE 10/09/2023 10/09/2023
Note: Released By: JPI
CUSVC COMPLETE 10/09/2023 10/12/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 10/09/2023 10/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/09/2023 10/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/09/2023 10/11/2023
LOCATE COMPLETE 10/09/2023 10/11/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/09/2023 10/11/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show R4.1 insulation on walls. Energy calcs say R5. Revise to match
SW1 COMPLETE 10/09/2023 10/17/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Note: Ensure that construction does not impact neighboring lot in the back yard . The subject lots drainage must not negatively impact any adjacent property. (B)
ZON HOLD 10/09/2023 10/09/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM 1. There must be a separation between the driveway and the front entry - driveway cannot continue to the front entry and there must be foundation plantings between the driveway and front entry. 2. Provide the total width of the proposed driveway. 3. Must have additional foundation plantings in front of house. 4. Add walkway leading from the driveway to front entry along with the material and width of the proposed walkway.
BADMIN COMPLETE 10/09/2023 10/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENV HOLD 10/09/2023 10/10/2023
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 10/9/23 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
PLFM HOLD 10/09/2023 10/12/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan and Survey, the structure does fall within the SFHA. Elevation certificates are required at construction drawings, foundation, and final.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 11/02/2024
REINSPECTION RESIDENTIAL ¤40.00 11/02/2024
REINSPECTION RESIDENTIAL ¤40.00 11/02/2024
REINSPECTION RESIDENTIAL ¤40.00 11/02/2024
CONNECTION FEES ¤25.00 11/21/2023
FC IMPACT FEE EMS ¤62.00 11/21/2023
IMPACT FEE FIRE ¤428.09 11/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/21/2023
FC IMPACT FEE LIBRARY ¤268.00 11/21/2023
IMPACT FEE PARKS ¤1,800.99 11/21/2023
IMPACT FEE SCHOOL ¤5,450.00 11/21/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 11/21/2023
SURCHARGE FS 533.721 ¤6.33 11/21/2023
SURCHARGE - FS 468.631 ¤9.49 11/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 11/21/2023
SW ENG INSPECTION 80 ¤80.00 11/21/2023
SW ENG PRE APRON ¤30.00 11/21/2023
SW ENG - REVIEW 20 ¤20.00 11/21/2023
SW ENG RES REVIEW 200 ¤200.00 11/21/2023
SEWER INSPECTION ¤25.00 11/21/2023
SITE PLAN 30 ¤30.00 11/21/2023
WATER-METER ¤505.39 11/21/2023
ADJUSTMENT 50% (¤632.75) 11/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/21/2023
INSPECTION - RESIDENTIAL ¤962.50 11/21/2023
PLAN REVIEW - RESIDENTIAL ¤273.00 11/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤13,274.54