Permit #2023100571

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-00790-0180
CONDITIONED SPACE: 2000 sqft
GARAGE: 476 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
OPENED PORCH (WITH ROOF) : 144 sqft
Total Square Footage: 2817 sqft
Block: 00790
Subdivision: 2189 - SECTION 25-PINE GROVE
Job Phone: 912-258-2201
Location Address: 112 PALMWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/28/2024
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0180
Contracted Stated Job Value: ¤215,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/22/2024 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 10/21/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 10/21/2024 12:04:47 PM *** 10/21/24: 1). Hose bibbs are missing anti-siphon backflow preventer. (FBC-P2902.4.3) 2). Condenser linest feed requires protection from damage. (FBC-M1301.3/FBC-M1401.1) 3). Backflow preventer and piping needs to be protected from damage (FBC- P2603.2.1)
U -UTILITY RESIDENTIAL FINAL 10/21/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 10/16/2024 10:42:06 AM *** has potable irr with DBL CHECK-no cross connection
ROW - STORMWATER FINAL 10/18/2024 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/18/2024 APPROVED PFLANAGAN
Note: 10/15/2024 - PREVIOUS INSPECTION NOTES 10/15/24 TPOLACEK**8 FINAL SURVEY REQUIRES MORE ELEVATION SHOTS IN THE REAR OF STRUCTURE TO DETERMINE PROPER DRAINAGE CONVEYANCE. 9 Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. TYPE OF CONSTRUCTION IS SHOWN ON SITE PLAN BUT NOT ON FINAL SURVEY PLEASE MAKE CORRECTIONS BEFORE SUBMITTING CORRECTED FINAL SURVEY
ROW FIELD SURVEY /GRADING CERTIFICATION 10/18/2024 APPROVED PFLANAGAN
ROW - FINAL APRON (AFTER POUR) 10/18/2024 APPROVED PFLANAGAN
U-CROSS CONNECTION 10/16/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/16/2024 10:42:06 AM *** has potable irr with DBL CHECK-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/15/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 10/15/24 TPOLACEK**8 FINAL SURVEY REQUIRES MORE ELEVATION SHOTS IN THE REAR OF STRUCTURE TO DETERMINE PROPER DRAINAGE CONVEYANCE. 9 Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern. TYPE OF CONSTRUCTION IS SHOWN ON SITE PLAN BUT NOT ON FINAL SURVEY PLEASE MAKE CORRECTIONS BEFORE SUBMITTING CORRECTED FINAL SURVEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/11/2024 Disapproved - NO FEE EMADISON
ELECTRIC - EARLY POWER 08/16/2024 APPROVED RMARTIN
Note: 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24: 1). Where power source is fed from overhead lines, Service Feeds are required to be landed at Main Meter Panel for Early Power. 2). Please have Portable Toilet serviced as required. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3.
ELECTRIC - EARLY POWER 08/15/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/15/2024 2:10:05 PM *** 8/15/24: 1). Where power source is fed from overhead lines, Service Feeds are required to be landed at Main Meter Panel for Early Power. 2). Please have Portable Toilet serviced as required. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3.
ROW- PRE-APRON (PRE-POUR) 08/15/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
INSULATION 07/03/2024 APPROVED RSIMS
Note: Inspector Notes from Inspection 2320 6/26/24: Please repair your silt fence at the front left area.
SEWER TIE IN 07/03/2024 APPROVED MGIBSON
Note: 7/2/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 3307.1 PROTECTION OF PROPERTY, NEED SILT FENCE UP BEFORE SCHEDUALING NEXT INSPECTION C/M TO SCHEDUAL GRAVITY SEWER TEST FOR 7/3/24
GRAVITY SEWER TEST 07/03/2024 APPROVED MGIBSON
SEWER TIE IN 07/02/2024 PARTIALLY APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 3307.1 PROTECTION OF PROPERTY, NEED SILT FENCE UP BEFORE SCHEDUALING NEXT INSPECTION C/M TO SCHEDUAL GRAVITY SEWER TEST FOR 7/3/24
LATH/BRICK/ WATER BARRIER 06/26/2024 APPROVED - AS NOTED RSIMS
Note: 6/26/24: Please repair your silt fence at the front left area.
ALL ROUGH 06/24/2024 APPROVED KSANDOE
ROOF VALLEY & METAL 05/28/2024 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/24/2024 APPROVED KSANDOE
Note: 5/20/2024 - PREVIOUS INSPECTION NOTES 5/20/24: Added Roof Sheathing Inspection as requested by Applicant. Roof Sheathing Only approved. Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTRE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan. Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
ROOF SHEATHING 05/20/2024 APPROVED RSIMS
Note: 5/20/24: Added per Applicant request on Inspection 2460 (RS/B/T/DC). Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTRE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan. 5/20/24: Added per applicant request. Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTRE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
WALL SHEATHING 05/20/2024 APPROVED RSIMS
Note: Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTRE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2024 CANCELLED BY APPLICANT RSIMS
Note: 5/20/24: Added Roof Sheathing Inspection as requested by Applicant. Roof Sheathing Only approved. Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTRE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan. Inspector Notes from Inspection 2340 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
ROW - DRAINAGE 05/13/2024 APPROVED TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/13/2024 11:10:11 AM *** CORRECTIONS HAVE BEEN MADE. TEMP PIPE IS INSTALLED , PORTA POTTY IS OUT OF SWALE AND SILT FENCE IS GOOD. 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY PFLANAGAN 5/7/2024 11:40:45 AM *** STILL NEED TO REMOVE THE CONCRETE FROM THE SWALE WILL BE BACK TO INSPECT ON THE 5/13/24 TO MAKE SURE CONCRETE IS TAKEN CARE OF. --------------------------------------------------------------------------- 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/3/2024 11:23:58 AM *** Builder needs to remove the porta potty from swale, remove concrete over pour in swale and install a temporarary culvert pipe. next inspection will be on 05/07/24 rjg. 5/2/24. Reportedly (From Lynn) filled the swale with dirt without a temporary culvert. Dirt being dragged into the road.
TIE BEAM / LINTEL 05/10/2024 APPROVED - AS NOTED RSIMS
Note: 5/10/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). 4 window sills have mortar beds that exceed the 1/2" maximum thicness per FBC-R606.3.1 NOTE: Please clean any debris from the down cells that may occur from site cleaning/grading prior to pour. Inspector Notes from Inspection 2250 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
FOUND SURVEY APPROVED (OFFICE) 05/08/2024 APPROVED TBAKER
ROW - DRAINAGE 05/07/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: *** NOTES ADDED BY PFLANAGAN 5/7/2024 11:40:45 AM *** STILL NEED TO REMOVE THE CONCRETE FROM THE SWALE WILL BE BACK TO INSPECT ON THE 5/13/24 TO MAKE SURE CONCRETE IS TAKEN CARE OF. --------------------------------------------------------------------------- 5/3/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/3/2024 11:23:58 AM *** Builder needs to remove the porta potty from swale, remove concrete over pour in swale and install a temporarary culvert pipe. next inspection will be on 05/07/24 rjg. 5/2/24. Reportedly (From Lynn) filled the swale with dirt without a temporary culvert. Dirt being dragged into the road.
ROW - DRAINAGE 05/03/2024 Disapproved - NO FEE TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 11:23:58 AM *** Builder needs to remove the porta potty from swale, remove concrete over pour in swale and install a temporarary culvert pipe. next inspection will be on 05/07/24 rjg. 5/2/24. Reportedly (From Lynn) filled the swale with dirt without a temporary culvert. Dirt being dragged into the road.
MONOLITHIC SLAB 04/26/2024 APPROVED - AS NOTED RSIMS
Note: 4/26/24: Ok to pour. Approved as noted pending approval of revision that is only accepted at the time of the inspection. Field conditions match revision submitted. 4/23/2024 - PREVIOUS INSPECTION NOTES 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
MONOLITHIC SLAB 04/23/2024 Disapproved - NO FEE RSIMS
Note: 4/23/24: Highlighted on plans. 1). Plans are missing details for column footers at back porch/lanai area. 2). Garage footer is missing rebar as required on plan.
PLUMBING 1ST ROUGH UNDERGROUND 04/16/2024 APPROVED - AS NOTED MGIBSON
Note: 3307.1 PROTECTION OF PROPERTY, NEED SILT FENCE UP BEFORE SCHEDUALING NEXT INSPECTION
WATER METER INSTALLATION REQUEST 04/03/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 05/31/2024 05/31/2024
Note: Marked INFORMATION By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM The wrong permit number is on the NOC. It is for a different address.
ENGIN1 COMPLETE 05/08/2024 05/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/08/2024 05/08/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/24/2024 04/30/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/02/2023 11/02/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/02/2023 11/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/02/2023 11/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 10/13/2023 10/14/2023
Note: Released By: JPI
CUSVC COMPLETE 10/13/2023 10/17/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/13/2023 10/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/13/2023 10/13/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/13/2023 10/16/2023
LOCATE COMPLETE 10/13/2023 10/17/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 10/13/2023 10/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/13/2023 10/24/2023
Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM
ZON HOLD 10/13/2023 10/13/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front setback missing on site plan/survey AC must be screened with 7 gallon shrubs. Legend on landscape plan shows they are 3 gallon Please provide all tree types on landscape plan. Two of the trees shown do not have the types labeled
BADMIN COMPLETE 10/13/2023 10/16/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 10/13/2023 12/04/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 10/23/2024
SW ENG - INSPECTION 20 ¤20.00 10/23/2024
SW ENG - INSPECTION 20 ¤20.00 10/23/2024
SW ENG - INSPECTION 20 ¤20.00 10/23/2024
PLAN REVIEW - REVISION ¤32.50 10/23/2024
CONNECTION FEES ¤1,166.26 02/28/2024
WATER- TURN ON ¤25.00 02/28/2024
ADJUSTMENT 50% (¤465.08) 02/28/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/28/2024
INSPECTION - RESIDENTIAL ¤701.25 02/28/2024
PLAN REVIEW - RESIDENTIAL ¤198.90 02/28/2024
SW ENG INSPECTION 80 ¤80.00 02/28/2024
SW ENG PRE APRON ¤30.00 02/28/2024
SW ENG - REVIEW 20 ¤20.00 02/28/2024
SW ENG RES REVIEW 200 ¤200.00 02/28/2024
SEWER CREDIT (¤958.00) 02/28/2024
SEWER INSPECTION ¤25.00 02/28/2024
SEWER CAPITAL FACILITY ¤5,344.82 02/28/2024
WATER CAPITAL FACILITY FEE ¤3,923.88 02/28/2024
SITE PLAN 30 ¤30.00 02/28/2024
FC IMPACT FEE EMS ¤62.00 02/28/2024
IMPACT FEE FIRE ¤428.09 02/28/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/28/2024
FC IMPACT FEE LIBRARY ¤268.00 02/28/2024
IMPACT FEE PARKS ¤1,800.99 02/28/2024
IMPACT FEE SCHOOL ¤5,450.00 02/28/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 02/28/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/28/2024
SURCHARGE FS 533.721 ¤4.65 02/28/2024
SURCHARGE - FS 468.631 ¤6.98 02/28/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/28/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,560.24