Permit #2023100609
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00960-0060 |
| CONDITIONED SPACE: 2387 sqft |
| OPENED PORCH (WITH ROOF) : 371 sqft |
| OPENED PORCH (WITH ROOF) : 89 sqft |
| GARAGE: 707 sqft |
| Total Square Footage: 3554 sqft |
| Block: 00960 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 407-580-2657 |
| Location Address: 3 EVANSTON PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/17/2023 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: VICARIO PAUL & YOLANDA Y H&W |
|
Address 809 RENAISSANCE DR WILLIAMSTOWN, NJ 08094 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤790,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 01/17/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: potable irr with PVB -no cross connection 1/16/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/16/2025 10:12:07 AM *** has potable irrigation with no check valve installed | |||
| U-CROSS CONNECTION | 01/16/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/16/2025 10:12:07 AM *** has potable irrigation with no check valve installed | |||
| BLD - BUILDING FINAL | 01/16/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| BLD - BUILDING FINAL | 01/14/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Meter main door does not close properly and dead front appears not to be installed properly (gap above main) 2. Soffit lighting missing on front of home 3. Porta jon must be removed before final 4. Dishwasher/disposal required to be GFCI protected 5. Breaker locks required for built in kitchen appliances 6. ODU disconnect requires 3' of working space (behind unit) 7. Electrical panel needs proper labeling 8. 2'' PVC riser required to be secured 9. Romex exposed at meter main 10. Garage door bucks missing anchors per manufacter specs | |||
| ROW - FINAL APRON (AFTER POUR) | 01/09/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - STORMWATER FINAL | 01/09/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TREE HAS BEEN MOVED OUT OF DRAINAGE PATTERN GRADE IS OK AT THIS TIME WHERE IT WAS PASSING AS NOTED. -------------------------------------------------------------------- 1/8/25 UPON WALKING PROPERTY DETERMINED THAT IN THE REAR LEFT CORNER YOU WILL NEED TO REMOVE/RELOCATE TREE AS IT IS DIRECTLY IN THE DRAINAGE CONVEYANCE AD WILL HOLD/OBSTRUCT DRAINAGE FROM MOVING FROM THE REAR TO THE FRONT SWALE. Trees or clusters of vegetation that would restrict flow Sec 300.03 C-G. Sec 300.03 C-G. Show any trees or clusters of vegetation that would restrict flow along the sidelines to the front swale, drainage ditch, or other drainage conveyance. Flatwork, i.e., slabs, walkways, hardscaping Sec 300.03 C1F "Flatwork, i.e., slabs, walkways, hardscaping, patios, decking, or AC pads, are not allowed in any utility easements/ drainage conveyance. Additionally, decorative objects, columns, light poles, mulch, stones, plantings, or landscaping of any kind are not allowed in the Right of Way. I am approving this inspection as a courtesy and as noted that you will need to remove/relocate tree in rear left property corner before Row final passage. 12/13/2024 - PREVIOUS INSPECTION NOTES 12/13/24 You must first submit and pass a final survey before a field survey inspection can be completed. I am not going to fee you today as a courtesy. Please submit your final survey and schedule a final survey inspection. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/09/2025 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/08/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/08/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/8/25 UPON WALKING PROPERTY DETERMINED THAT IN THE REAR LEFT CORNER YOU WILL NEED TO REMOVE/RELOCATE TREE AS IT IS DIRECTLY IN THE DRAINAGE CONVEYANCE AD WILL HOLD/OBSTRUCT DRAINAGE FROM MOVING FROM THE REAR TO THE FRONT SWALE. Trees or clusters of vegetation that would restrict flow Sec 300.03 C-G. Sec 300.03 C-G. Show any trees or clusters of vegetation that would restrict flow along the sidelines to the front swale, drainage ditch, or other drainage conveyance. Flatwork, i.e., slabs, walkways, hardscaping Sec 300.03 C1F "Flatwork, i.e., slabs, walkways, hardscaping, patios, decking, or AC pads, are not allowed in any utility easements/ drainage conveyance. Additionally, decorative objects, columns, light poles, mulch, stones, plantings, or landscaping of any kind are not allowed in the Right of Way. I am approving this inspection as a courtesy and as noted that you will need to remove/relocate tree in rear left property corner before Row final passage. 12/13/2024 - PREVIOUS INSPECTION NOTES 12/13/24 You must first submit and pass a final survey before a field survey inspection can be completed. I am not going to fee you today as a courtesy. Please submit your final survey and schedule a final survey inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/13/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/13/24 You must first submit and pass a final survey before a field survey inspection can be completed. I am not going to fee you today as a courtesy. Please submit your final survey and schedule a final survey inspection. | |||
| SEWER TIE IN | 10/21/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 Inspector Notes from Inspection 2060 HAVE CORRECT PLUMBING SUB CONTRACTOR CHANGED TO CORRECT ONE BY NEXT INSPECTION BOTH GRAVITY SEWER AND SEWER TIE IN ARE APPROVED, C/M TO SHEDUAL SEWER TIE IN FOR 10/21/24 | |||
| GRAVITY SEWER TEST | 10/18/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 HAVE CORRECT PLUMBING SUB CONTRACTOR CHANGED TO CORRECT ONE BY NEXT INSPECTION BOTH GRAVITY SEWER AND SEWER TIE IN ARE APPROVED, C/M TO SHEDUAL SEWER TIE IN FOR 10/21/24 | |||
| ROW- PRE-APRON (PRE-POUR) | 10/04/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9270 10/2/24 PIPE ELEVATION OK A COUPLE HUNDRETHS OUT ON THE DOWNSTREAM BUT ADJOINING CULVERT IS LOWER SO APPROVING THIS AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 10/1/2024 - PREVIOUS INSPECTION NOTES 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 SITE IS UNDER WATER UNABLE TO INSPECT AT THIS TIME. SEE PHOTO FOR REFERENCE. 8/19/2024 - PREVIOUS INSPECTION NOTES 1) THERE IS NO PAVER DETAIL UPLOADED IN TO THE PERMIT NEED TO HAVE SO WE CAN INSPECT DRIVEWAY CORRECTLY. 2) THE SITE PLAN CALLS FOR A CONCRETE DRIVEWAY AND ON SITE IT IS NOT FORM FOR A CONCRETE DRIVEWAY. ---------------------------------------------------------------------- 8/14/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 10/04/2024 | APPROVED | FSLADISH |
| Note: 10/4/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________ New inspection due to canceled inspection Inspector Notes from Inspection 9270 10/2/24 PIPE ELEVATION OK A COUPLE HUNDRETHS OUT ON THE DOWNSTREAM BUT ADJOINING CULVERT IS LOWER SO APPROVING THIS AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 10/1/2024 - PREVIOUS INSPECTION NOTES 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 SITE IS UNDER WATER UNABLE TO INSPECT AT THIS TIME. SEE PHOTO FOR REFERENCE. 8/19/2024 - PREVIOUS INSPECTION NOTES 1) THERE IS NO PAVER DETAIL UPLOADED IN TO THE PERMIT NEED TO HAVE SO WE CAN INSPECT DRIVEWAY CORRECTLY. 2) THE SITE PLAN CALLS FOR A CONCRETE DRIVEWAY AND ON SITE IT IS NOT FORM FOR A CONCRETE DRIVEWAY. ---------------------------------------------------------------------- 8/14/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PAVER RESTRAINTS | 10/04/2024 | APPROVED | FSLADISH |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/02/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/2/24 PIPE ELEVATION OK A COUPLE HUNDRETHS OUT ON THE DOWNSTREAM BUT ADJOINING CULVERT IS LOWER SO APPROVING THIS AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 10/1/2024 - PREVIOUS INSPECTION NOTES 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 SITE IS UNDER WATER UNABLE TO INSPECT AT THIS TIME. SEE PHOTO FOR REFERENCE. 8/19/2024 - PREVIOUS INSPECTION NOTES 1) THERE IS NO PAVER DETAIL UPLOADED IN TO THE PERMIT NEED TO HAVE SO WE CAN INSPECT DRIVEWAY CORRECTLY. 2) THE SITE PLAN CALLS FOR A CONCRETE DRIVEWAY AND ON SITE IT IS NOT FORM FOR A CONCRETE DRIVEWAY. ---------------------------------------------------------------------- 8/14/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 10/01/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 SITE IS UNDER WATER UNABLE TO INSPECT AT THIS TIME. SEE PHOTO FOR REFERENCE. 8/19/2024 - PREVIOUS INSPECTION NOTES 1) THERE IS NO PAVER DETAIL UPLOADED IN TO THE PERMIT NEED TO HAVE SO WE CAN INSPECT DRIVEWAY CORRECTLY. 2) THE SITE PLAN CALLS FOR A CONCRETE DRIVEWAY AND ON SITE IT IS NOT FORM FOR A CONCRETE DRIVEWAY. ---------------------------------------------------------------------- 8/14/2024 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 09/11/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/9/24 SITE IS UNDER WATER UNABLE TO INSPECT AT THIS TIME. SEE PHOTO FOR REFERENCE. PLEASE REMOVE PALLETS OF PAVERS ONTO YOUR SITE OUT OF THE CITY STREET AS SOON AS POSSIBLE THIS IS A SAFETY HAZARD. ___________________________________________________________________________________________________________________________ 8/19/2024 - PREVIOUS INSPECTION NOTES 1) THERE IS NO PAVER DETAIL UPLOADED IN TO THE PERMIT NEED TO HAVE SO WE CAN INSPECT DRIVEWAY CORRECTLY. 2) THE SITE PLAN CALLS FOR A CONCRETE DRIVEWAY AND ON SITE IT IS NOT FORM FOR A CONCRETE DRIVEWAY. ---------------------------------------------------------------------- 8/14/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 08/19/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THERE IS NO PAVER DETAIL UPLOADED IN TO THE PERMIT NEED TO HAVE SO WE CAN INSPECT DRIVEWAY CORRECTLY. 2) THE SITE PLAN CALLS FOR A CONCRETE DRIVEWAY AND ON SITE IT IS NOT FORM FOR A CONCRETE DRIVEWAY. ---------------------------------------------------------------------- 8/14/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 08/14/2024 | CANCELLED BY APPLICANT | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 08/13/2024 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 06/24/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 06/06/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 6/6/24 Nail plate still missing from previous inspection 5/31/2024 - PREVIOUS INSPECTION NOTES 5/31/24: 1). Fireblocking (minimum 1-1/2" thick per FBC-R302.11.1) required in garage where dryer exhaust, vent stack & electric wires enter attic space. Also, will need firestopat any seams & perimeter. Also, you will need to expose the top plate where the nail plate was missing previously so we can verify that it was resolved. 5/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate. 2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.1 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. 5-28-24 1. Need fire blocking in master shower. 2. Need fire blocking at entry from garage to house on right side wall. 3. Need fire blocking/ foam at electrical panels, vent pipe and dryer duct. 4. Silt fence is still down. | |||
| INSULATION | 06/06/2024 | APPROVED | MKRASKI |
| Note: 6/6/2024 - PREVIOUS INSPECTION NOTES 6/6/24 Nail plate still missing from previous inspection 5/31/2024 - PREVIOUS INSPECTION NOTES 5/31/24: 1). Fireblocking (minimum 1-1/2" thick per FBC-R302.11.1) required in garage where dryer exhaust, vent stack & electric wires enter attic space. Also, will need firestopat any seams & perimeter. Also, you will need to expose the top plate where the nail plate was missing previously so we can verify that it was resolved. 5/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate. 2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.1 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. 5-28-24 1. Need fire blocking in master shower. 2. Need fire blocking at entry from garage to house on right side wall. 3. Need fire blocking/ foam at electrical panels, vent pipe and dryer duct. 4. Silt fence is still down. | |||
| INSULATION | 06/05/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 5/31/2024 - PREVIOUS INSPECTION NOTES 5/31/24: 1). Fireblocking (minimum 1-1/2" thick per FBC-R302.11.1) required in garage where dryer exhaust, vent stack & electric wires enter attic space. Also, will need firestopat any seams & perimeter. Also, you will need to expose the top plate where the nail plate was missing previously so we can verify that it was resolved. 5/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate. 2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.1 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. 5-28-24 1. Need fire blocking in master shower. 2. Need fire blocking at entry from garage to house on right side wall. 3. Need fire blocking/ foam at electrical panels, vent pipe and dryer duct. 4. Silt fence is still down. | |||
| INSULATION | 05/31/2024 | Disapproved - NO FEE | RSIMS |
| Note: 5/31/24: 1). Fireblocking (minimum 1-1/2" thick per FBC-R302.11.1) required in garage where dryer exhaust, vent stack & electric wires enter attic space. Also, will need firestopat any seams & perimeter. Also, you will need to expose the top plate where the nail plate was missing previously so we can verify that it was resolved. 5/28/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate. 2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.1 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. 5-28-24 1. Need fire blocking in master shower. 2. Need fire blocking at entry from garage to house on right side wall. 3. Need fire blocking/ foam at electrical panels, vent pipe and dryer duct. 4. Silt fence is still down. | |||
| INSULATION | 05/28/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate. 2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.1 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. 5-28-24 1. Need fire blocking in master shower. 2. Need fire blocking at entry from garage to house on right side wall. 3. Need fire blocking/ foam at electrical panels, vent pipe and dryer duct. 4. Silt fence is still down. | |||
| ALL ROUGH | 05/21/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 5/21/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Nail plates in laundry room are incomplete. Only 1 installed at the double top plate. 2). Please repair your silt fence and keep it maintained throughout the build process to avoid failed inspections with fee. FBC 3307.1 5/14/2024 - PREVIOUS INSPECTION NOTES 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. | |||
| ALL ROUGH | 05/14/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/14/24: 1). Missing Nail Plates for wire protection: (Marked with NP where needed) - 2-laundry / 2-left side / 1-middle closet / 2-Master Bedroom / 1-garage. Please check all that are under 1-1/4" minimum from stud/plate face. 2). No water pressure. 3). Shower faucet plumbing is incomplete. 4). Wires for Mechanical equipment are not phased out. 5). Kitchen exhaust is missing the 3 screws at connections as required. M1601.4.1 Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. 6). Shingles installed but dryer gooseneck & plumbing vent stack boots are not installed. 7). Need a revision for the different windows installed (5823.1) than what shows on the submitted product approval sheet. | |||
| LATH/BRICK/ WATER BARRIER | 05/14/2024 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 04/17/2024 | APPROVED | RSIMS |
| Note: 4/16/2024 - PREVIOUS INSPECTION NOTES 4/16/24: Previously noted 2 ply truss 28 remains unresolved. (2 rows - 4"OC). Please look at highlighted information on plans as stated before. Previously listed item 1 below: The flashing needs to be mechanically fastened to the wall with drive pins, tapcons or similar. Roof cement alone is not a sufficient means of attaching. 4/10/2024 - PREVIOUS INSPECTION NOTES 4/10/24: 1). 5" x 5" wall flashing needs to be sealed to the wall along the top leg as required by Manufacturer. 2). 5" x 5" flashing at left side of entry needs to be anchored to concrete wall and sealed as required. * Also, 2ply truss 28 still needs to be connected as required on MiTek along the bottom cord. Inspector Notes from Inspection 2460 3/28/24: Must be complete by next inspection. 1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements. Inspector Notes from Inspection 2450 Check the following by next inspection 1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs 2. Need repairs to silt fence by next inspection (right side fence is down) | |||
| ROOF VALLEY & METAL | 04/16/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/16/24: Previously noted 2 ply truss 28 remains unresolved. (2 rows - 4"OC). Please look at highlighted information on plans as stated before. Previously listed item 1 below: The flashing needs to be mechanically fastened to the wall with drive pins, tapcons or similar. Roof cement alone is not a sufficient means of attaching. 4/10/2024 - PREVIOUS INSPECTION NOTES 4/10/24: 1). 5" x 5" wall flashing needs to be sealed to the wall along the top leg as required by Manufacturer. 2). 5" x 5" flashing at left side of entry needs to be anchored to concrete wall and sealed as required. * Also, 2ply truss 28 still needs to be connected as required on MiTek along the bottom cord. Inspector Notes from Inspection 2460 3/28/24: Must be complete by next inspection. 1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements. Inspector Notes from Inspection 2450 Check the following by next inspection 1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs 2. Need repairs to silt fence by next inspection (right side fence is down) | |||
| ROOF VALLEY & METAL | 04/10/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/10/24: 1). 5" x 5" wall flashing needs to be sealed to the wall along the top leg as required by Manufacturer. 2). 5" x 5" flashing at left side of entry needs to be anchored to concrete wall and sealed as required. * Also, 2ply truss 28 still needs to be connected as required on MiTek along the bottom cord. Inspector Notes from Inspection 2460 3/28/24: Must be complete by next inspection. 1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements. Inspector Notes from Inspection 2450 Check the following by next inspection 1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs 2. Need repairs to silt fence by next inspection (right side fence is down) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/28/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 3/28/24: Must be complete by next inspection. 1). 2ply trusses - 08, 22 and 28 are not connected as required. Highlighted on MiTek. Each row has to meet OC spacing individually. 2). 09 truss has a split web which will need repair per MiTek requirements. Inspector Notes from Inspection 2450 Check the following by next inspection 1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs 2. Need repairs to silt fence by next inspection (right side fence is down) | |||
| WALL SHEATHING | 03/25/2024 | APPROVED - AS NOTED | LMILLER |
| Note: Check the following by next inspection 1. missing blocking at panel edges (paned edges cannot be properly nailed at collumns, missing blocking/backing) Peer manufacturer specs 2. Need repairs to silt fence by next inspection (right side fence is down) | |||
| TIE BEAM / LINTEL | 02/16/2024 | APPROVED | RSIMS |
| FOUND SURVEY APPROVED (OFFICE) | 02/06/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/25/2024 | APPROVED | RSIMS |
| Note: 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24: * 6 mil plastic has blown off of slab area. Please re-secure at seams thoroughly to prevent a re-occurrence. 1/19/2024 - PREVIOUS INSPECTION NOTES 1/19/24: 1). Rear Middle column footer has rebar that does not have the minimum 3" ground clearance as required. 2). Rear footer has roots that need to be removed. Highlighted on plan. * Please clean out minor washin dirt throughout a few areas of the footers to maintain 3" clearance for rebar. | |||
| MONOLITHIC SLAB | 01/23/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/23/24: * 6 mil plastic has blown off of slab area. Please re-secure at seams thoroughly to prevent a re-occurrence. 1/19/2024 - PREVIOUS INSPECTION NOTES 1/19/24: 1). Rear Middle column footer has rebar that does not have the minimum 3" ground clearance as required. 2). Rear footer has roots that need to be removed. Highlighted on plan. * Please clean out minor washin dirt throughout a few areas of the footers to maintain 3" clearance for rebar. | |||
| MONOLITHIC SLAB | 01/19/2024 | Disapproved - NO FEE | RSIMS |
| Note: 1/19/24: 1). Rear Middle column footer has rebar that does not have the minimum 3" ground clearance as required. 2). Rear footer has roots that need to be removed. Highlighted on plan. * Please clean out minor wash-in dirt throughout a few areas of the footers to maintain 3" clearance for rebar. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/12/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: HAVE CORRECT PLUMBING SUB CONTRACTOR CHANGED TO CORRECT ONE BY NEXT INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 12/04/2023 | APPROVED | CBOWERMASTER |
| Note: 11/22/2023 3:16:42 PM- PREVIOUS INSPECTION NOTES wooded lot | |||
| WATER METER INSTALLATION REQUEST | 11/22/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: wooded lot |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 01/17/2025 | 01/17/2025 |
| Note: Marked INFORMATION By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Rename file name to match document. | |||
| MECH | COMPLETE | 01/08/2025 | 01/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/05/2024 | 09/05/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please bring in original right of way agreement | |||
| SW1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 approval valid with the following note: Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lids/covers SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 09/05/2024 | 09/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/05/2024 | 09/06/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/03/2024 | 09/04/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Repeat Comment: 1) Please provide proposed sod elevations at the structure 4" below FFE for block, 6" below FFE for wood frame. 2) Please provide proposed elevations showing drainage within 10' from the structure A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4 3) Please provide driveway apron width at edge of pavement See revision clouds and notes on site plan | |||
| ENGIN1 | COMPLETE | 09/03/2024 | 09/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 09/03/2024 | 09/03/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENT: Please submit an electronic copy of a completed Right of Way Utilization Agreement for Paver Driveway for staff review. This Agreement must be signed by all persons on the deed to the property and alll owner's signatures must be notarized. | |||
| ENGIN1 | COMPLETE | 08/27/2024 | 08/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/27/2024 | 08/27/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please provide proposed sod elevations at the structure 4" below FFE for block, 6" below FFE for wood frame. 2) Please provide proposed elevations showing drainage within 10' from the structure A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4 3) Please provide driveway apron width at edge of pavement | |||
| ZON | HOLD | 08/27/2024 | 08/27/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit an electronic copy of a completed Right of Way Utilization Agreement for Paver Driveway for staff review. This Agreement must be signed by all persons on the deed to the property and alll owner's signatures must be notarized. | |||
| BLD | COMPLETE | 05/14/2024 | 05/20/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM KS | |||
| ZON | COMPLETE | 02/06/2024 | 02/06/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/06/2024 | 02/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/06/2023 | 11/08/2023 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/06/2023 | 11/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/06/2023 | 11/17/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/06/2023 | 11/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/16/2023 | 12/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/13/2023 | 10/14/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/13/2023 | 10/16/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 10/13/2023 | 10/16/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit a 400 amp riser diagram. | |||
| ENGIN1 | COMPLETE | 10/13/2023 | 10/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/13/2023 | 10/16/2023 |
| LOCATE | COMPLETE | 10/13/2023 | 10/17/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/13/2023 | 10/16/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/13/2023 | 10/24/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Sod elevations adjacent to the structure are 4” below the FFE for block and 6” forwood frame structures. (D) Culvert material and size to be depicted. Typical is 17X13 CMP (L) | |||
| ZON | HOLD | 10/13/2023 | 10/16/2023 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Must have separation between front of home with walkway and additional foundation plantings. Provide NEW Site plan and Landscape plan showing the separation. | |||
| BADMIN | COMPLETE | 10/13/2023 | 10/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/16/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/16/2025 |
| REINSPECTION FEE | ¤40.00 | 01/16/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 01/16/2025 |
| REINSPECTION FEE | ¤40.00 | 01/15/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/15/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 11/17/2023 |
| IMPACT FEE FIRE | ¤428.09 | 11/17/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/17/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/17/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 11/17/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/17/2023 |
| WATER- TURN ON | ¤25.00 | 11/17/2023 |
| ADJUSTMENT 50% | (¤1,409.35) | 11/17/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/17/2023 |
| INSPECTION - RESIDENTIAL | ¤2,172.50 | 11/17/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤616.20 | 11/17/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/17/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/17/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/17/2023 |
| SURCHARGE FS 533.721 | ¤14.09 | 11/17/2023 |
| SURCHARGE - FS 468.631 | ¤21.14 | 11/17/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/17/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/17/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/17/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/17/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/17/2023 |
| SEWER CREDIT | (¤1,466.00) | 11/17/2023 |
| SEWER INSPECTION | ¤25.00 | 11/17/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/17/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/17/2023 |
| SITE PLAN 30 | ¤30.00 | 11/17/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,354.12 |