I want to search for...
Permit #2023100654
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00310-0200 |
| CONDITIONED SPACE: 1600 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| OPENED PORCH (WITH ROOF) : 513 sqft |
| GARAGE: 499 sqft |
| Total Square Footage: 2675 sqft |
| Block: 00310 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 407-580-2657 |
| Location Address: 33 RADFORD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/13/2023 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: YELIOSOF DMITRY & OLGA YELIOSOF TRUSTEES |
|
Address 51 BIONIA AVE STATEN ISLAND, NY 10305 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤391,976.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/10/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| BLD - BUILDING FINAL | 03/07/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: please fix items before next inspection seal all penetration on mechanical room #7-FBC-R . 302.6 seal all penetration , wall and ceiling ( low voltage wire AHU Plenum conduit ) around boxes | |||
| BLD - BUILDING FINAL | 02/12/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: 2 items reamin on the past inspection that need to be resolved *** NOTES ADDED BY CVANSTRAHLEN 2/7/2025 9:16:32 AM *** #7-FBC-R . 302.6 seal all penetration , wall and ceiling ( low voltage wire AHU Plenum conduit ) around boxes #3- Need insulation certificate , insulation certificade need to show that the attic about garage , the foam roof joins is been fire rate proof by code | |||
| BLD - BUILDING FINAL | 02/07/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 2/7/2025 9:16:32 AM *** #7-FBC-R . 302.6 seal all penetration , wall and ceiling ( low voltage wire AHU Plenum conduit ) around boxes #1- refrigerator electrical outlet need to be o a GFCI breaker #2-range hood electrical outlet need to be on a GFCI breaker #3- Need insulation certificate #4- Exterior outlet , next to AC unit have some burn marks , ( replacement need it ) #5- E-cals call for unvented sotfit , ( vent sotfit is install on property #6- MIssing one anker bold on each of the garage door jamb | |||
| U -UTILITY RESIDENTIAL FINAL | 02/07/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 11/4/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/4/2024 10:41:57 AM *** lower both sewer clean outs-install correct cap on C/O at pep tank Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 7/29/2024 11:06:41 AM *** no irrigation-no cross connection | |||
| ROW - STORMWATER FINAL | 11/20/2024 | APPROVED | FSLADISH |
| Note: 11/20/24AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ______________________________________________________________________________________________________________________ 11/4/2024 - PREVIOUS INSPECTION NOTES 11/04/24 TPOLACEK*** ALL BARE EARTH ALONG VACANT LOT MUST HAVE SEED AND STRAW | |||
| ROW - FINAL APRON (AFTER POUR) | 11/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/20/24 HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION.. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 11/4/2024 - PREVIOUS INSPECTION NOTES 11/04/24 TPOLACEK*** BUILDER MUST COMPLETE THE ROADSIDE HOT PATCH REPAIR. ALL DAMAGED ASPHALT MUST BE CUT OUT AND REPLACED A MINIMUM OF 12" FROM EXISTING EDGE. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/04/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11/04/24 TPOLACEK*** BUILDER MUST COMPLETE THE ROADSIDE HOT PATCH REPAIR. ALL DAMAGED ASPHALT MUST BE CUT OUT AND REPLACED A MINIMUM OF 12" FROM EXISTING EDGE. | |||
| ROW - STORMWATER FINAL | 11/04/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11/04/24 TPOLACEK*** ALL BARE EARTH ALONG VACANT LOT MUST HAVE SEED AND STRAW | |||
| U -UTILITY RESIDENTIAL FINAL | 11/04/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/4/2024 10:41:57 AM *** lower both sewer clean outs-install correct cap on C/O at pep tank Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 7/29/2024 11:06:41 AM *** no irrigation-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/31/2024 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9270 05/23/24 TPOLACEK*** NOTE TO BUILDER. REBAR MAY NOT BE BENT MUST BE A MINIMUM OF THE WIDTH OF THE PIPE BUT NEEDS TO A STRAIGHT CUT PIECE. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/31/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 08/20/2024 | APPROVED | AGAETANO |
| GRAVITY SEWER TEST | 07/29/2024 | APPROVED | MGIBSON |
| Note: 12/14/2023 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET | |||
| SEWER TIE IN | 07/29/2024 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 07/29/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/29/2024 11:06:41 AM *** no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 05/23/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 05/23/24 TPOLACEK*** NOTE TO BUILDER. REBAR MAY NOT BE BENT MUST BE A MINIMUM OF THE WIDTH OF THE PIPE BUT NEEDS TO A STRAIGHT CUT PIECE. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ | |||
| PEP TANK INSTALLATION REQUEST | 05/06/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 04/16/2024 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 04/08/2024 | APPROVED | AGAETANO |
| Note: 4/3/2024 - PREVIOUS INSPECTION NOTES 4/3/24 Holes in exterior block need moisture barrier and lath check all 4/1/2024 - PREVIOUS INSPECTION NOTES 04-01-2024 1. Approved drawings not on site. 2. Back two exterior doors and front entry doors not installed. | |||
| ALL ROUGH | 04/05/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 4/4/2024 - PREVIOUS INSPECTION NOTES 04-04-2024 1. Head test failed. 2. Energy calcs and mechanical layout not on site. 3. P.A.S. not on site. 4. Please seal holes at M.Bedroom at left of entry electrical wire to the outside. 04-05-2024 1. Shield plate not installed correctly at garage water lines at slab. Check at next inspection. 2. Mechanical layout is blurry and unable to resd. Please have a large, readable, approved layout on site. Check at next inspction. | |||
| ALL ROUGH | 04/04/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 04-04-2024 1. Head test failed. 2. Energy calcs and mechanical layout not on site. 3. P.A.S. not on site. 4. Please seal holes at M.Bedroom at left of entry electrical wire to the outside. | |||
| LATH/BRICK/ WATER BARRIER | 04/03/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 4/3/24 Holes in exterior block need moisture barrier and lath check all 4/1/2024 - PREVIOUS INSPECTION NOTES 04-01-2024 1. Approved drawings not on site. 2. Back two exterior doors and front entry doors not installed. | |||
| ALL ROUGH | 04/03/2024 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 04/01/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 04-01-2024 1. Approved drawings not on site. 2. Back two exterior doors and front entry doors not installed. | |||
| ROOF VALLEY & METAL | 03/12/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/11/2024 | APPROVED | JWALKER |
| Note: 3/7/2024 - PREVIOUS INSPECTION NOTES 3/7/24 Make ALL repairs before calling in re-inspection,stopped inspection items not repaired per previous notes 3/1/2024 - PREVIOUS INSPECTION NOTES 3/1/24: All previously listed deficiencies are not resolved. * Item 2: Approved repair letter is not in plan documents as required. Also, the repair does not meet the Engineer's requirements. * Item 3 - Truss (3) 2 of 2 is not repaired at all. * Item 9 - Still missing truss plates / moisture barrier on some trusses. Re-check all. * Item 10 - Still missing braces at top convential framing as required. * Item 11 - Truss 21 will need to be braced to parrallel truss where is bowed on the right side to maintain 24" OC separation. 2/26/2024 - PREVIOUS INSPECTION NOTES 1. Trusses 17 and 10 missing 1 of 2 required heta 20 anchors. 2. Truss (3) 1 of 2, Has a missing a web member. Please have the engineer submit a repair to the building department to correct the missing web. 3. Truss (3) 2 of 2 and truss (6) have broken web members. Please see the Mitek repair page for correct repair methods. 4. Truss PG7 and 2 PC1's Rear proch right corner are missing heta hold down anchors. 5. The piggy back trusses have not been anchored down to the base trusses. See the mitek piggy back anchoring method in the engineering packet. 6. Front proch 2x beam support above the front entry needs to be anchored to the CMU wall below. 7. Bearing wall SP achor top and bottom missing fasteners. All nail holes are to be filled. Check all. 8. Fornt entry 6x6 post base ABU anchor is missing fasteners. 9. Multiple trusses are missing truss plates or a moisture barrier. Check all. 10. The over framing at the front entry is missing hold down anchors. The ridge beam needs to be supported and anchored to the trusses below. 11. Trusses in the garage right side bearing wall are out of plumb tolerance. 9. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 3/7/24 Make ALL repairs before calling in re-inspection,stopped inspection items not repaired per previous notes 3/1/2024 - PREVIOUS INSPECTION NOTES 3/1/24: All previously listed deficiencies are not resolved. * Item 2: Approved repair letter is not in plan documents as required. Also, the repair does not meet the Engineer's requirements. * Item 3 - Truss (3) 2 of 2 is not repaired at all. * Item 9 - Still missing truss plates / moisture barrier on some trusses. Re-check all. * Item 10 - Still missing braces at top convential framing as required. * Item 11 - Truss 21 will need to be braced to parrallel truss where is bowed on the right side to maintain 24" OC separation. 2/26/2024 - PREVIOUS INSPECTION NOTES 1. Trusses 17 and 10 missing 1 of 2 required heta 20 anchors. 2. Truss (3) 1 of 2, Has a missing a web member. Please have the engineer submit a repair to the building department to correct the missing web. 3. Truss (3) 2 of 2 and truss (6) have broken web members. Please see the Mitek repair page for correct repair methods. 4. Truss PG7 and 2 PC1's Rear proch right corner are missing heta hold down anchors. 5. The piggy back trusses have not been anchored down to the base trusses. See the mitek piggy back anchoring method in the engineering packet. 6. Front proch 2x beam support above the front entry needs to be anchored to the CMU wall below. 7. Bearing wall SP achor top and bottom missing fasteners. All nail holes are to be filled. Check all. 8. Fornt entry 6x6 post base ABU anchor is missing fasteners. 9. Multiple trusses are missing truss plates or a moisture barrier. Check all. 10. The over framing at the front entry is missing hold down anchors. The ridge beam needs to be supported and anchored to the trusses below. 11. Trusses in the garage right side bearing wall are out of plumb tolerance. 9. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/01/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 3/1/24: All previously listed deficiencies are not resolved. * Item 2: Approved repair letter is not in plan documents as required. Also, the repair does not meet the Engineer's requirements. * Item 3 - Truss (3) 2 of 2 is not repaired at all. * Item 9 - Still missing truss plates / moisture barrier on some trusses. Re-check all. * Item 10 - Still missing braces at top convential framing as required. * Item 11 - Truss 21 will need to be braced to parrallel truss where is bowed on the right side to maintain 24" OC separation. 2/26/2024 - PREVIOUS INSPECTION NOTES 1. Trusses 17 and 10 missing 1 of 2 required heta 20 anchors. 2. Truss (3) 1 of 2, Has a missing a web member. Please have the engineer submit a repair to the building department to correct the missing web. 3. Truss (3) 2 of 2 and truss (6) have broken web members. Please see the Mitek repair page for correct repair methods. 4. Truss PG7 and 2 PC1's Rear proch right corner are missing heta hold down anchors. 5. The piggy back trusses have not been anchored down to the base trusses. See the mitek piggy back anchoring method in the engineering packet. 6. Front proch 2x beam support above the front entry needs to be anchored to the CMU wall below. 7. Bearing wall SP achor top and bottom missing fasteners. All nail holes are to be filled. Check all. 8. Fornt entry 6x6 post base ABU anchor is missing fasteners. 9. Multiple trusses are missing truss plates or a moisture barrier. Check all. 10. The over framing at the front entry is missing hold down anchors. The ridge beam needs to be supported and anchored to the trusses below. 11. Trusses in the garage right side bearing wall are out of plumb tolerance. 9. | |||
| WALL SHEATHING | 02/26/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/26/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Trusses 17 and 10 missing 1 of 2 required heta 20 anchors. 2. Truss (3) 1 of 2, Has a missing a web member. Please have the engineer submit a repair to the building department to correct the missing web. 3. Truss (3) 2 of 2 and truss (6) have broken web members. Please see the Mitek repair page for correct repair methods. 4. Truss PG7 and 2 PC1's Rear proch right corner are missing heta hold down anchors. 5. The piggy back trusses have not been anchored down to the base trusses. See the mitek piggy back anchoring method in the engineering packet. 6. Front proch 2x beam support above the front entry needs to be anchored to the CMU wall below. 7. Bearing wall SP achor top and bottom missing fasteners. All nail holes are to be filled. Check all. 8. Fornt entry 6x6 post base ABU anchor is missing fasteners. 9. Multiple trusses are missing truss plates or a moisture barrier. Check all. 10. The over framing at the front entry is missing hold down anchors. The ridge beam needs to be supported and anchored to the trusses below. 11. Trusses in the garage right side bearing wall are out of plumb tolerance. 9. | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/22/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/02/2024 | APPROVED | JWALKER |
| Note: 1/31/2024 - PREVIOUS INSPECTION NOTES Item 1 listed below has not been corrected. 1/30/2024 - PREVIOUS INSPECTION NOTES 1. Rear porch lintel at the right side and rear missing top rebar. 2. front left side garage top horizontal rebar is to have 3/4" minimum clearance off block. | |||
| TIE BEAM / LINTEL | 01/31/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: Item 1 listed below has not been corrected. 1/30/2024 - PREVIOUS INSPECTION NOTES 1. Rear porch lintel at the right side and rear missing top rebar. 2. front left side garage top horizontal rebar is to have 3/4" minimum clearance off block. | |||
| TIE BEAM / LINTEL | 01/30/2024 | Disapproved - NO FEE | JWALKER |
| Note: 1. Rear porch lintel at the right side and rear missing top rebar. 2. front left side garage top horizontal rebar is to have 3/4" minimum clearance off block. | |||
| MONOLITHIC SLAB | 01/02/2024 | APPROVED | JWALKER |
| Note: 12/22/2023 - PREVIOUS INSPECTION NOTES 12/22/23 Item 2 listed below has not been completed. 12/21/2023 - PREVIOUS INSPECTION NOTES 1. Compaction test has not been posted. 2. Slab area including the rear porch needs to be tamped down. 3. Rear garage footing area has soil collapse under the plastic. Reabar is to have 3" clearance from the ground. | |||
| MONOLITHIC SLAB | 12/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: 12/22/23 Item 2 listed below has not been completed. 12/21/2023 - PREVIOUS INSPECTION NOTES 1. Compaction test has not been posted. 2. Slab area including the rear porch needs to be tamped down. 3. Rear garage footing area has soil collapse under the plastic. Reabar is to have 3" clearance from the ground. | |||
| MONOLITHIC SLAB | 12/21/2023 | Disapproved - NO FEE | JWALKER |
| Note: 12/21/23 1. Compaction test has not been posted. 2. Slab area including the rear porch needs to be tamped down. 3. Rear garage footing area has soil collapse under the plastic. Reabar is to have 3" clearance from the ground. | |||
| MONOLITHIC SLAB | 12/18/2023 | CANCELLED BY APPLICANT | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/14/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE | |||
| GRAVITY SEWER TEST | 12/14/2023 | Disapproved - NO FEE | MGIBSON |
| Note: SEWER NOT RAN YET | |||
| WATER METER INSTALLATION REQUEST | 12/04/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/07/2024 | 11/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/28/2024 | 10/28/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM invalid NOC | |||
| BADMIN | INFORMATION | 10/23/2024 | 10/23/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM can not process this as the NOC is expired. | |||
| BLD | COMPLETE | 02/27/2024 | 03/01/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/16/2023 | 10/17/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/16/2023 | 10/17/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/16/2023 | 10/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/16/2023 | 10/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/16/2023 | 10/17/2023 |
| LOCATE | COMPLETE | 10/16/2023 | 10/18/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/16/2023 | 10/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/16/2023 | 10/24/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/16/2023 | 10/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/16/2023 | 12/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/19/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 03/19/2025 |
| REINSPECTION FEE | ¤40.00 | 03/19/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/19/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/19/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 12/14/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/13/2023 |
| IMPACT FEE FIRE | ¤428.09 | 11/13/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/13/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/13/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 11/13/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/13/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/13/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/13/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/13/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/13/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/13/2023 |
| SEWER CREDIT | (¤1,733.75) | 11/13/2023 |
| SEWER INSPECTION | ¤25.00 | 11/13/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/13/2023 |
| WATER CREDIT | (¤1,390.00) | 11/13/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/13/2023 |
| SITE PLAN 30 | ¤30.00 | 11/13/2023 |
| SURCHARGE FS 533.721 | ¤7.07 | 11/13/2023 |
| SURCHARGE - FS 468.631 | ¤10.60 | 11/13/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/13/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/13/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/13/2023 |
| WATER- TURN ON | ¤25.00 | 11/13/2023 |
| ADJUSTMENT 50% | (¤706.88) | 11/13/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/13/2023 |
| INSPECTION - RESIDENTIAL | ¤1,078.00 | 11/13/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤305.76 | 11/13/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,962.34 |