I want to search for...
Permit #2023100708
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0210 |
| CONDITIONED SPACE: 1806 sqft |
| GARAGE: 650 sqft |
| OPENED PORCH (WITH ROOF) : 402 sqft |
| Total Square Footage: 2858 sqft |
| Block: 00000 |
| Subdivision: 2313 - THE GABLES SUBDIVISION |
| Job Phone: (386)756-0439 |
| Location Address: 241 HAWTHORN AVE |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/25/2023 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYTAS HOMES INC |
|
Address PO BOX 290490 PORT ORANGE, FL 32127 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
IAN MICHEAL JOHNSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4244 JACKSON STREET PORT ORANGE, FL 32127 |
CCC1325915 (Exp: 08/31/2026) | 386-760-0764 | 386-760-3080 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/30/2024 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 04/30/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: SOD ON SITE TALKED TO BOB THEY WILL DO IT PASSING AS NOTED ------------------------------------------------------------------------------------- 4/29/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE SOD IN THE BACK AFTER PROPERTY LINE ON ALL BARE AREAS IN THE COMMON AREA 2) NEED TO A ROW OF SOD AT THE END OF THE SIDEWALK | |||
| U -UTILITY RESIDENTIAL FINAL | 04/29/2024 | FINAL APPROVED | JHARDING |
| ROW- PAVER RESTRAINTS | 04/29/2024 | APPROVED | PFLANAGAN |
| ROW - FINAL APRON (AFTER POUR) | 04/29/2024 | APPROVED | PFLANAGAN |
| ROW - STORMWATER FINAL | 04/29/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO HAVE SOD IN THE BACK AFTER PROPERTY LINE ON ALL BARE AREAS IN THE COMMON AREA 2) NEED TO A ROW OF SOD AT THE END OF THE SIDEWALK | |||
| U-CROSS CONNECTION | 04/29/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/26/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/26/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/09/2024 | APPROVED | GBERTOLA |
| Note: 4/9/24= READY FOR PAVERS +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/1/2024 - PREVIOUS INSPECTION NOTES 04/01/24 AT TIME OF INSPECTION YOU ARE GOOD TO POUR PAVER RESTRAINTS, APRON AND SIDEWALK ONLY. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ----------------------------------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES ** 03/28/24 SITE NOT READY TO POUR FILLED WITH WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 04/01/2024 | PARTIALLY APPROVED | TPOLACEK |
| Note: 04/01/24 AT TIME OF INSPECTION YOU ARE GOOD TO POUR PAVER RESTRAINTS, APRON AND SIDEWALK ONLY. NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ----------------------------------------------------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES ** 03/28/24 SITE NOT READY TO POUR FILLED WITH WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 03/28/24 SITE NOT READY TO POUR FILLED WITH WATER | |||
| ELECTRIC - EARLY POWER | 03/27/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 02/09/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 02/08/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/05/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 01/18/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 01/10/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/10/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 01/09/2024 | APPROVED | AMOBLEY |
| SEWER TIE IN | 01/05/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 01/04/2024 | APPROVED | TCHURCHILL |
| GRAVITY SEWER TEST | 12/29/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 12/22/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 12/15/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 12/01/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/28/2023 | Approval - Private Provider | PPROVIDER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/18/2023 | 10/18/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/17/2023 | 10/20/2023 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/17/2023 | 10/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/17/2023 | 10/20/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/17/2023 | 10/24/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 10/17/2023 | 10/17/2023 |
| Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM The Electronic ROW is approved. Please submit the Original ROW Agreement for recording. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/29/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/29/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/25/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/25/2023 |
| SEWER INSPECTION | ¤25.00 | 10/25/2023 |
| SITE PLAN 30 | ¤30.00 | 10/25/2023 |
| WATER-METER | ¤505.39 | 10/25/2023 |
| WATER-METER | ¤419.86 | 10/25/2023 |
| ADJUSTMENT 50% | (¤15.00) | 10/25/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/25/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 10/25/2023 |
| CONNECTION FEES | ¤25.00 | 10/25/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/25/2023 |
| IMPACT FEE FIRE | ¤428.09 | 10/25/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/25/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/25/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 10/25/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/25/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 10/25/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 10/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/25/2023 |
| SURCHARGE FS 533.721 | ¤2.40 | 10/25/2023 |
| SURCHARGE - FS 468.631 | ¤3.60 | 10/25/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/25/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/25/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/25/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,248.33 |