Permit #2023100831

Permit Details

Status: COED

Parcel Id: 07-11-31-7028-00090-0150
CONDITIONED SPACE: 1298 sqft
CONDITIONED SPACE: 1298 sqft
GARAGE: 262 sqft
GARAGE: 262 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
Total Square Footage: 3274 sqft
Block: 00090
Subdivision: 2199 - SECTION 28-WYNNFIELD
Job Phone: 863-647-5815
Location Address: 43 PONY EXPRESS DR
Type: DU - DUPLEX
Issue Date: 12/01/2023
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: HULBERT HOMES INC

Address

PO BOX 6254

LAKELAND, FL 33807

Lot: 0150
Contracted Stated Job Value: ¤315,000.00
Job Description: Duplex
Type: CN
Original Permit #: 2023031577

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/29/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/29/2025 11:01:33 AM *** 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24: 1). Temporary electric pole needs to be removed prior to Building Final Approval. 9/9/2024 - PREVIOUS INSPECTION NOTES NEC 210.30 (A) Whole house surge protector required for each unit FBCR M1305.1.4.1 ODU needs to be 3" above grade. 105.11 Notice of termite protection. A permanent sign which identifies the termite treatment provider and need for reinspection and treatment contract renewal shall be provided. The sign shall be posted near the water heater or electric panel
ROW - STORMWATER FINAL 10/18/2024 APPROVED - AS NOTED FSLADISH
Note: 10/18/24 WASHOUTS FILLED IN SODDED AND LEVEL AT THE TIME OF THIS INSPECTION. IT IS THE BUILDERS RESPONSIBILITY AFTER THIS INSPECTION FOR ANY FURTHER WASHOUTS. AT THE TIME OF THIS INSPECTION CORRECTIONS WERE MADE. APPROVING AS NOTED AT THIS INSPECTION NO WASHOUTS WERE OBSERVED. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 9/25/2024 - PREVIOUS INSPECTION NOTES 09/25/24 TPOLACEK** WASHOUTS AROUND BOTH PEP TANKS NEEDS TO BE FILLED AND SOD NEEDS TO BE LEVEL WITH LID TO PREVENT FURTHER WASHOUTS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 NOTICED A WASHOUT AT THE PEP TANK AT THE TIME OF THIS INSPECTION. CM WAS WITH ME AND INDICATED HE WOULD TAKE CARE OF IT PROMPTLY. NOT GOING TO FEE HIM TODAY. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/17/24 Upon walking property determined that drainage will work as indicated. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 09/25/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 09/25/24 TPOLACEK** WASHOUTS AROUND BOTH PEP TANKS NEEDS TO BE FILLED AND SOD NEEDS TO BE LEVEL WITH LID TO PREVENT FURTHER WASHOUTS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/9/2024 - PREVIOUS INSPECTION NOTES 9/9/24 NOTICED A WASHOUT AT THE PEP TANK AT THE TIME OF THIS INSPECTION. CM WAS WITH ME AND INDICATED HE WOULD TAKE CARE OF IT PROMPTLY. NOT GOING TO FEE HIM TODAY. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/17/24 Upon walking property determined that drainage will work as indicated. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
BLD - BUILDING FINAL 09/25/2024 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/25/2024 10:49:34 AM *** 9/25/24: 1). Temporary electric pole needs to be removed prior to Building Final Approval. 9/9/2024 - PREVIOUS INSPECTION NOTES NEC 210.30 (A) Whole house surge protector required for each unit FBCR M1305.1.4.1 ODU needs to be 3" above grade. 105.11 Notice of termite protection. A permanent sign which identifies the termite treatment provider and need for reinspection and treatment contract renewal shall be provided. The sign shall be posted near the water heater or electric panel
BLD - BUILDING FINAL 09/09/2024 Disapproved - NO FEE KSANDOE
Note: NEC 210.30 (A) Whole house surge protector required for each unit FBCR M1305.1.4.1 ODU needs to be 3" above grade. 105.11 Notice of termite protection. A permanent sign which identifies the termite treatment provider and need for reinspection and treatment contract renewal shall be provided. The sign shall be posted near the water heater or electric panel
ROW - STORMWATER FINAL 09/09/2024 Disapproved - NO FEE FSLADISH
Note: 9/9/24 NOTICED A WASHOUT AT THE PEP TANK AT THE TIME OF THIS INSPECTION. CM WAS WITH ME AND INDICATED HE WOULD TAKE CARE OF IT PROMPTLY. NOT GOING TO FEE HIM TODAY. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/17/24 Upon walking property determined that drainage will work as indicated. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 09/09/2024 APPROVED FSLADISH
Note: 9/9/24 PIPE ELEVATION GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 7/17/24 Upon walking property determined that drainage will work as indicated. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U-CROSS CONNECTION 08/19/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 8/19/2024 9:59:58 AM *** both units have potable irrigation with PVB each-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/17/2024 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 07/17/2024 APPROVED - AS NOTED FSLADISH
Note: 7/17/24 Upon walking property determined that drainage will work as indicated. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 07/08/2024 APPROVED LMILLER
Note: Inspector Notes from Inspection 2170 2/13/24: FPL emailed to release power.
ROW- PRE-APRON (PRE-POUR) 06/24/2024 APPROVED TPOLACEK
Note: 06/24/24 TPOLACEK*** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/20/2024 - PREVIOUS INSPECTION NOTES 06/20/24 TPOLACEK*** CULVERT IS OUT OF TOLERENCE PLEASE MAKE SURE YOU ARE USING CORRECT BENCHMARK AND RESET PIPE TO CORRECT ELEVATION. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 06/20/2024 Disapproved - NO FEE TPOLACEK
Note: 06/20/24 TPOLACEK*** CULVERT IS OUT OF TOLERENCE PLEASE MAKE SURE YOU ARE USING CORRECT BENCHMARK AND RESET PIPE TO CORRECT ELEVATION. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
U - SEWER TIE IN 06/12/2024 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE ALL VEGITATION FROM FOOTER/SLAB AREAS BEFORE SCHEDUALING SLAB INSPECTION
GRAVITY SEWER TEST 06/12/2024 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE ALL VEGITATION FROM FOOTER/SLAB AREAS BEFORE SCHEDUALING SLAB INSPECTION
PEP TANK INSTALLATION REQUEST 05/15/2024 APPROVED CBOWERMASTER
INSULATION 05/02/2024 APPROVED RSIMS
Note: 5/1/2024 - PREVIOUS INSPECTION NOTES 5/1/24: 1). As previously noted the draft stop at the front & back overhangs was never confirmed due to soffit being installed. Please remove enough of the soffit in both areas to view the draft stop. Side A: 2). Overflow at bathtub seems to be leaking as the concrete in the area is saturated & the overflow pipe from the faceplate to the tub waste tee connection is wet around the joints. 3). Missing firestop/fireblocking at top plate connection of bathtub pack out wall above faucet. (see how side B is done if clarification is needed). Inspector Notes from Inspection 2443 4/17/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO THE NEXT INSPECTION. Check at next inspection. Previously noted item 1 remains unresolved / Item 2 slab is not fully repaired to meet finish surface as required / Item 4 still not resolved. Also, the roof shingle installation has broken the dryer exhaust seal at the roof deck in Unit B. Please reseal properly as required. Field nails are still covered as well as the soffit is installed so the tail end of the truss cannot be seen for the drywall nailing. Inspector Notes from Inspection 2420 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Could not verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe. Inspector Notes from Inspection 2420 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Could not verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe.
INSULATION 05/01/2024 Disapproved - NO FEE RSIMS
Note: 5/1/24: 1). As previously noted the draft stop at the front & back overhangs was never confirmed due to soffit being installed. Please remove enough of the soffit in both areas to view the draft stop. Side A: 2). Overflow at bathtub seems to be leaking as the concrete in the area is saturated & the overflow pipe from the faceplate to the tub waste tee connection is wet around the joints. 3). Missing firestop/fireblocking at top plate connection of bathtub pack out wall above faucet. (see how side B is done if clarification is needed). Inspector Notes from Inspection 2443 4/17/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO THE NEXT INSPECTION. Check at next inspection. Previously noted item 1 remains unresolved / Item 2 slab is not fully repaired to meet finish surface as required / Item 4 still not resolved. Also, the roof shingle installation has broken the dryer exhaust seal at the roof deck in Unit B. Please reseal properly as required. Field nails are still covered as well as the soffit is installed so the tail end of the truss cannot be seen for the drywall nailing. Inspector Notes from Inspection 2420 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Could not verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe. Inspector Notes from Inspection 2420 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Could not verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe.
FIREWALL DRYWALL NAILING 04/17/2024 APPROVED - AS NOTED RSIMS
Note: 4/17/24: Approved as noted to keep project moving. MUST BE COMPLETE PRIOR TO THE NEXT INSPECTION. Check at next inspection. Previously noted item 1 remains unresolved / Item 2 slab is not fully repaired to meet finish surface as required / Item 4 still not resolved. Also, the roof shingle installation has broken the dryer exhaust seal at the roof deck in Unit B. Please reseal properly as required. Field nails are still covered as well as the soffit is installed so the tail end of the truss cannot be seen for the drywall nailing. Inspector Notes from Inspection 2420 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Could not verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe. Inspector Notes from Inspection 2420 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Could not verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe.
ALL ROUGH 04/10/2024 APPROVED - AS NOTED RSIMS
Note: 4/10/24: Approved as noted to keep the project moving. Check at next Inspection. Must be complete prior to next inspection. Both Units: 1). Bathtub needs to be filled to the overflow to test piping. 2). Slab at bathtub drain needs to be repaired with cement as required. Currently filled with water. 3). Dining room window: Copuld noy verify proper anchoring due to it being labeled "Do not open until 3/18/24" 4). 5ft head pressure pipe outside is short , so please make sure it is filled to the very top of the pipe.
FIREWALL DRYWALL NAILING 04/05/2024 Disapproved - NO FEE RSIMS
Note: 4/5/24: Screws are covered already. Unable to visually confirm spacing for draft stop.
LATH/BRICK/ WATER BARRIER 04/05/2024 APPROVED RSIMS
ALL ROUGH 04/03/2024 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 03/18/2024 APPROVED BTAYLOR
WALL SHEATHING 03/11/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/11/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 03/08/2024 APPROVED TBAKER
TIE BEAM / LINTEL 02/20/2024 APPROVED FWILLIS
ELECTRIC TEMP POLE 02/13/2024 APPROVED - AS NOTED RSIMS
Note: 2/13/24: FPL emailed to release power.
MONOLITHIC SLAB 02/12/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 02/07/2024 APPROVED - AS NOTED MGIBSON
Note: REMOVE ALL VEGITATION FROM FOOTER/SLAB AREAS BEFORE SCHEDUALING SLAB INSPECTION
WATER METER INSTALLATION REQUEST 01/24/2024 APPROVED BVITALE
Note: 1/17/2024 3:23:36 PM- PREVIOUS INSPECTION NOTES NCL
WATER METER INSTALLATION REQUEST 01/17/2024 Disapproved -FEE REQUIRED BVITALE
Note: NCL

Review History

Department Status Date In Date Out
MECH COMPLETE 04/07/2024 04/08/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/07/2024 04/08/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/28/2024 04/02/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide ductlayout complete(supply and return) for both sides of duplex. Also provide duct layout on floor plan or sheet other than electrical for readability
ENGIN1 COMPLETE 03/07/2024 03/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/07/2024 03/07/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 11/14/2023 11/22/2023
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 11/14/2023 11/14/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/02/2023 11/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 11/02/2023 11/13/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. (D) You did the correction still need some information
ZON COMPLETE 11/02/2023 11/02/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 10/19/2023 12/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 10/18/2023 10/20/2023
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ENGIN1 COMPLETE 10/18/2023 10/19/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 10/18/2023 10/23/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 10/18/2023 10/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 10/18/2023 10/25/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM YOU NEED TO SIMPLIFY THE SITE PLAN BY REMOVING CONTOUR LINES AND ADD A SQUARE TO THE PROPOSED ELEVATION.
ZON COMPLETE 10/18/2023 10/19/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 01/30/2025
CONTRACTOR CHANGE ¤20.00 01/30/2025
REINSPECTION FEE ¤40.00 01/30/2025
SW ENG REINSPECTION 20 ¤20.00 01/30/2025
PLAN REVIEW - REVISION ¤32.50 01/30/2025
CONNECTION FEES ¤2,332.52 12/01/2023
SW ENG - REVIEW 20 ¤20.00 12/01/2023
SW ENG RES REVIEW 200 ¤200.00 12/01/2023
SEWER CREDIT (¤6,229.13) 12/01/2023
SEWER INSPECTION ¤25.00 12/01/2023
SEWER CAPITAL FACILITY ¤10,689.64 12/01/2023
WATER CREDIT (¤25.71) 12/01/2023
WATER CAPITAL FACILITY FEE ¤7,847.76 12/01/2023
SITE PLAN 30 ¤30.00 12/01/2023
SURCHARGE FS 533.721 ¤5.11 12/01/2023
SURCHARGE - FS 468.631 ¤7.67 12/01/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/01/2023
SW ENG INSPECTION 80 ¤80.00 12/01/2023
SW ENG PRE APRON ¤30.00 12/01/2023
WATER- TURN ON ¤50.00 12/01/2023
ADJUSTMENT 50% (¤511.13) 12/01/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/01/2023
INSPECTION - RESIDENTIAL ¤866.25 12/01/2023
PLAN REVIEW - APPROVED MASTER ¤126.00 12/01/2023
FC IMPACT FEE EMS ¤62.00 12/01/2023
IMPACT FEE FIRE ¤856.18 12/01/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/01/2023
FC IMPACT FEE LIBRARY ¤268.00 12/01/2023
IMPACT FEE PARKS ¤3,600.18 12/01/2023
IMPACT FEE SCHOOL ¤10,900.00 12/01/2023
IMPACT FEE TRANSPORTATION ¤2,812.00 12/01/2023
WATER -IRRIGATION INSPECTION ¤50.00 12/01/2023
Fees Total Due: ¤0.00 Total Paid: ¤34,492.84