I want to search for...
Permit #2023101031
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00140-0150 |
| CONDITIONED SPACE: 1876 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2358 sqft |
| Block: 00140 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 904-268-7730 |
| Location Address: 49 PERSHING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/08/2023 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC OF FLORIDA |
|
Address 5220 SHAD RD JACKSONVILLE , FL 32257 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/19/2024 | FINAL APPROVED | JSTEWART |
| U-CROSS CONNECTION | 03/19/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 03/19/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This | |||
| ROW - STORMWATER FINAL | 03/19/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This | |||
| U -UTILITY RESIDENTIAL FINAL | 03/19/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/18/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/18/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PROJECT STATUS | 03/05/2024 | APPROVED | PFLANAGAN |
| Note: LOOKED AT GRADE. GRADE LOOK LIKE IT WILL WORK CORRECTLY BUT WON'T BE ABLE TO TELL INTILL FINAL SURVEY SHOWS THE DRAINAGE OF THE LOT. -------------------------------------------------------------------------------------------------------- MEETING AT 1PM FOR GRADING | |||
| ROW- PRE-APRON (PRE-POUR) | 02/28/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE PUMP THE WATER OUT OF MITER ENDS AND LITTLE BIT IN THE APRON BEFORE POURING. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. | |||
| ELECTRIC - EARLY POWER | 02/14/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 1138. Release Power | |||
| INSULATION | 01/09/2024 | APPROVED | FWILLIS |
| Note: 1/8/2024 - PREVIOUS INSPECTION NOTES 1/8/24: 1). Missing Firestop at all Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Inspector Notes from Inspection 2420 1/3/23 1. Romex needs to be properly strapped in bedroom wall close to SGD 2. Exhaust fans not wired Check on next inspection 1/2/2024 - PREVIOUS INSPECTION NOTES 1. Failed 5' test pressure test 2. Notch where SER cable goes through double top plate requires flat straps 3. Metalic pancake boxes are required to be bonded properly 4. Cut romex in garage wall and near AHU closet Stopped inspection not ready | |||
| INSULATION | 01/08/2024 | Disapproved - NO FEE | RSIMS |
| Note: 1/8/24: 1). Missing Firestop at all Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Inspector Notes from Inspection 2420 1/3/23 1. Romex needs to be properly strapped in bedroom wall close to SGD 2. Exhaust fans not wired Check on next inspection 1/2/2024 - PREVIOUS INSPECTION NOTES 1. Failed 5' test pressure test 2. Notch where SER cable goes through double top plate requires flat straps 3. Metalic pancake boxes are required to be bonded properly 4. Cut romex in garage wall and near AHU closet Stopped inspection not ready | |||
| GRAVITY SEWER TEST | 01/04/2024 | APPROVED | MGIBSON |
| Note: 12/21/2023 - PREVIOUS INSPECTION NOTES | |||
| SEWER TIE IN | 01/04/2024 | APPROVED | MGIBSON |
| Note: 12/21/2023 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 01/03/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1/3/23 1. Romex needs to be properly strapped in bedroom wall close to SGD 2. Exhaust fans not wired Check on next inspection 1/2/2024 - PREVIOUS INSPECTION NOTES 1. Failed 5' test pressure test 2. Notch where SER cable goes through double top plate requires flat straps 3. Metalic pancake boxes are required to be bonded properly 4. Cut romex in garage wall and near AHU closet Stopped inspection not ready | |||
| LATH/BRICK/ WATER BARRIER | 01/02/2024 | APPROVED | MKRASKI |
| ALL ROUGH | 01/02/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Failed 5' test pressure test 2. Notch where SER cable goes through double top plate requires flat straps 3. Metalic pancake boxes are required to be bonded properly 4. Cut romex in garage wall and near AHU closet Stopped inspection not ready | |||
| ROOF VALLEY & METAL | 12/22/2023 | APPROVED | KSANDOE |
| SEWER TIE IN | 12/21/2023 | CANCELLED BY APPLICANT | MGIBSON |
| GRAVITY SEWER TEST | 12/21/2023 | CANCELLED BY APPLICANT | MGIBSON |
| ELECTRIC-TUG | 12/20/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1138. Release Power | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/15/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING | 12/14/2023 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 12/14/2023 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 12/12/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING | 12/12/2023 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 11/29/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 11/29/2023 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/27/2023 | APPROVED | MGIBSON |
| Note: 11/22/2023 - PREVIOUS INSPECTION NOTES | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/22/2023 | CANCELLED BY APPLICANT | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/14/2023 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/28/2023 | 11/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/24/2023 | 12/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/23/2023 | 10/24/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 10/23/2023 | 10/24/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/23/2023 | 10/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/23/2023 | 10/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/23/2023 | 10/24/2023 |
| LOCATE | COMPLETE | 10/23/2023 | 10/30/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/23/2023 | 10/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/23/2023 | 10/30/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/23/2023 | 10/24/2023 |
| Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/23/2023 | 10/24/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 03/19/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/19/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/19/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/08/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/08/2023 |
| SEWER CREDIT | (¤850.00) | 11/08/2023 |
| SEWER INSPECTION | ¤25.00 | 11/08/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/08/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/08/2023 |
| SITE PLAN 30 | ¤30.00 | 11/08/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/08/2023 |
| IMPACT FEE FIRE | ¤428.09 | 11/08/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/08/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/08/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 11/08/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/08/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/08/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/08/2023 |
| SURCHARGE FS 533.721 | ¤4.17 | 11/08/2023 |
| SURCHARGE - FS 468.631 | ¤6.26 | 11/08/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/08/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/08/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/08/2023 |
| WATER- TURN ON | ¤25.00 | 11/08/2023 |
| ADJUSTMENT 50% | (¤417.42) | 11/08/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/08/2023 |
| INSPECTION - RESIDENTIAL | ¤627.00 | 11/08/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤177.84 | 11/08/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/08/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,566.89 |