Permit #2023101032

Permit Details

Status: COED

Parcel Id: 07-11-31-7027-00510-0240
CONDITIONED SPACE: 1753 sqft
GARAGE: 435 sqft
OPENED PORCH (WITH ROOF) : 182 sqft
OPENED PORCH (WITH ROOF) : 89 sqft
Total Square Footage: 2459 sqft
Block: 00510
Subdivision: 2128 - SECTION 27-WYNNFIELD
Job Phone: 202-494-2019
Location Address: 36 WOODBORN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/12/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD SUITE 220

ORLANDO, FL 32803

Lot: 0240
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/15/2024 CANCELLED BY APPLICANT WEB
Note: 7/9/2024 - PREVIOUS INSPECTION NOTES 07-09-2024 1. Multiple duct trims not installed. Check all. 2. Master bath shower valve not installed. 3. Master bath linen closet door not installed. 4. Multiple loose outlets throughout. Check all. 5. Disposal not working. 6. Energy calcs not on site. Contractor not ready. A complete inspection is required.
BLD - BUILDING FINAL 07/15/2024 FINAL APPROVED KSANDOE
Note: New inspection due to canceled inspection 7/9/2024 - PREVIOUS INSPECTION NOTES 07-09-2024 1. Multiple duct trims not installed. Check all. 2. Master bath shower valve not installed. 3. Master bath linen closet door not installed. 4. Multiple loose outlets throughout. Check all. 5. Disposal not working. 6. Energy calcs not on site. Contractor not ready. A complete inspection is required.
BLD - BUILDING FINAL 07/09/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 07-09-2024 1. Multiple duct trims not installed. Check all. 2. Master bath shower valve not installed. 3. Master bath linen closet door not installed. 4. Multiple loose outlets throughout. Check all. 5. Disposal not working. 6. Energy calcs not on site. Contractor not ready. A complete inspection is required.
U -UTILITY RESIDENTIAL FINAL 07/09/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/31/2024 1:32:10 PM *** no irr-no cross connection
ROW - FINAL APRON (AFTER POUR) 07/08/2024 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/08/2024 APPROVED TPOLACEK
Note: Inspector Notes from Inspection 9270 06/06/24 TPOLACEK*** SUGGEST BUILDER RAISE THE FRONT BOARD ALONG ROADEDGE TO 1"-2" MAX ABOVE EDGE OF ROAD TO HELP WITH EXTREME SLOPE OF APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2024 - PREVIOUS INSPECTION NOTES TALKED WITH TOM THAT WAS THE FIRST INSPECTOR AND STATES THAT THEY DIDN'T HAVE ALL THE FILL IN THE DRIVEWAY AT THIS TIME OF THIS INSPECTION PLEASE SEE NOTE OF TODAYS FOR CORRECTIONS. 1) THERE ARE AREAS IN YOUR POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. 2) SOIL THAT WAS PUT IN POURING AREA IS TOO SOFT NEED TO COMPACT SOIL TO CITY'S STANDARDS TO PASS. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) ---------------------------------------------------------------------------------------- 5/31/2024 - PREVIOUS INSPECTION NOTES 05/31/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE PLEASE RESET PIPE AND MAKE SURE ALL FORM BOARD ARE CONTACTING THE GROUND TO PREVENT OVER POUR. YOU MAY EXTEND BOARDS OR BACK FILL WITH MATERIAL. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW FIELD SURVEY /GRADING CERTIFICATION 07/08/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 07/08/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 06/06/2024 APPROVED - AS NOTED TPOLACEK
Note: 06/06/24 TPOLACEK*** SUGGEST BUILDER RAISE THE FRONT BOARD ALONG ROADEDGE TO 1"-2" MAX ABOVE EDGE OF ROAD TO HELP WITH EXTREME SLOPE OF APRON. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/5/2024 - PREVIOUS INSPECTION NOTES TALKED WITH TOM THAT WAS THE FIRST INSPECTOR AND STATES THAT THEY DIDN'T HAVE ALL THE FILL IN THE DRIVEWAY AT THIS TIME OF THIS INSPECTION PLEASE SEE NOTE OF TODAYS FOR CORRECTIONS. 1) THERE ARE AREAS IN YOUR POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. 2) SOIL THAT WAS PUT IN POURING AREA IS TOO SOFT NEED TO COMPACT SOIL TO CITY'S STANDARDS TO PASS. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) ---------------------------------------------------------------------------------------- 5/31/2024 - PREVIOUS INSPECTION NOTES 05/31/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE PLEASE RESET PIPE AND MAKE SURE ALL FORM BOARD ARE CONTACTING THE GROUND TO PREVENT OVER POUR. YOU MAY EXTEND BOARDS OR BACK FILL WITH MATERIAL. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 06/05/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: TALKED WITH TOM THAT WAS THE FIRST INSPECTOR AND STATES THAT THEY DIDN'T HAVE ALL THE FILL IN THE DRIVEWAY AT THIS TIME OF THIS INSPECTION PLEASE SEE NOTE OF TODAYS FOR CORRECTIONS. 1) THERE ARE AREAS IN YOUR POURING AREA THAT DON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. 2) SOIL THAT WAS PUT IN POURING AREA IS TOO SOFT NEED TO COMPACT SOIL TO CITY'S STANDARDS TO PASS. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) ---------------------------------------------------------------------------------------- 5/31/2024 - PREVIOUS INSPECTION NOTES 05/31/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE PLEASE RESET PIPE AND MAKE SURE ALL FORM BOARD ARE CONTACTING THE GROUND TO PREVENT OVER POUR. YOU MAY EXTEND BOARDS OR BACK FILL WITH MATERIAL. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ELECTRIC-TUG 06/05/2024 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 6/5/2024 3:11:22 PM *** Authorize release of email to FPL @ 3:11p
ROW- PRE-APRON (PRE-POUR) 06/04/2024 CANCELLED BY APPLICANT WEB
Note: 5/31/2024 - PREVIOUS INSPECTION NOTES 05/31/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE PLEASE RESET PIPE AND MAKE SURE ALL FORM BOARD ARE CONTACTING THE GROUND TO PREVENT OVER POUR. YOU MAY EXTEND BOARDS OR BACK FILL WITH MATERIAL. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
U-CROSS CONNECTION 05/31/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/31/2024 1:32:10 PM *** no irr-no cross connection
ROW- PRE-APRON (PRE-POUR) 05/31/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 05/31/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE PLEASE RESET PIPE AND MAKE SURE ALL FORM BOARD ARE CONTACTING THE GROUND TO PREVENT OVER POUR. YOU MAY EXTEND BOARDS OR BACK FILL WITH MATERIAL. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ELECTRIC - EARLY POWER 05/28/2024 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 05/01/2024 APPROVED MKRASKI
INSULATION 04/15/2024 APPROVED MKRASKI
ALL ROUGH 04/10/2024 APPROVED - AS NOTED AGAETANO
Note: 4/9/2024 - PREVIOUS INSPECTION NOTES 1. Slab need to sealed under tub 2. Elec. panel wiring needs to be phased properly 3. Product approval sheet has MI windows on it, Ply gem were installed need a revision approved by Building Dept. before calling in re-inspection Stopped inspection 04-10-2024 Mechanical layout not on site. Check at next inspection.
ALL ROUGH 04/09/2024 Disapproved - NO FEE MKRASKI
Note: 1. Slab need to sealed under tub 2. Elec. panel wiring needs to be phased properly 3. Product approval sheet has MI windows on it, Ply gem were installed need a revision approved by Building Dept. before calling in re-inspection Stopped inspection
WALL SHEATHING 03/28/2024 APPROVED RSIMS
Note: 3/26/2024 - PREVIOUS INSPECTION NOTES 3/26/24 No repairs made 3/21/2024 - PREVIOUS INSPECTION NOTES Wall sheathing not complete must be finished to check nailing pattern
WALL SHEATHING 03/26/2024 Disapproved - NO FEE MKRASKI
Note: 3/26/24 No repairs made 3/21/2024 - PREVIOUS INSPECTION NOTES Wall sheathing not complete must be finished to check nailing pattern
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/26/2024 APPROVED MKRASKI
ROOF VALLEY & METAL 03/26/2024 APPROVED MKRASKI
GRAVITY SEWER TEST 03/22/2024 APPROVED RSIMS
SEWER TIE IN 03/21/2024 APPROVED MKRASKI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/21/2024 Disapproved - NO FEE MKRASKI
Note: 1. Truss layout does not match what was installed from Mitek packet 2. Silt fence needs to be repaired to orginal condition Make repairs/revisions before next inspection
WALL SHEATHING 03/21/2024 Disapproved - NO FEE MKRASKI
Note: Wall sheathing not complete must be finished to check nailing pattern
FOUND SURVEY APPROVED (OFFICE) 03/20/2024 APPROVED TDOAK
TIE BEAM / LINTEL 03/05/2024 APPROVED MKRASKI
MONOLITHIC SLAB 02/22/2024 APPROVED MKRASKI
MONOLITHIC SLAB 02/15/2024 Disapproved - NO FEE LMILLER
Note: 2-15-24 Revision needed, front porch still not per plans (check notes and call-outs on foundation page) 2/14/2024 - PREVIOUS INSPECTION NOTES Front entry not per detail, high lighted on foundation plan
MONOLITHIC SLAB 02/14/2024 Disapproved - NO FEE MKRASKI
Note: Front entry not per detail, high lighted on foundation plan
PLUMBING 1ST ROUGH UNDERGROUND 02/08/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/03/2024 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 06/21/2024 06/24/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/19/2024 03/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/19/2024 03/20/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN CANCEL 03/01/2024 03/04/2024
Note: document submited as foundation survey is not a survey
ENGIN1 COMPLETE 02/21/2024 02/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 02/15/2024 02/20/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ENGIN1 HOLD 02/12/2024 02/12/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 02/12/2024 02/12/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 11/02/2023 11/03/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
MECH COMPLETE 11/02/2023 11/03/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/02/2023 11/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 11/02/2023 11/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 10/24/2023 12/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 10/23/2023 10/24/2023
Note: Released By: JPI
CUSVC COMPLETE 10/23/2023 10/24/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/23/2023 10/26/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/23/2023 10/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/23/2023 10/24/2023
LOCATE COMPLETE 10/23/2023 10/30/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/23/2023 10/26/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy Calcs needs to be St.augustine
SW1 COMPLETE 10/23/2023 11/01/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 10/23/2023 10/24/2023
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Floor plan and elevations plans don't match Site plan and Landscape plan. The site plan and landscape plan have the additional tandem 3rd car garage and the engineered drawings have only the standard two-car garage. Please resubmit whichever of these plans are incorrect.
BADMIN COMPLETE 10/23/2023 10/26/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 07/09/2024
SW ENG REINSPECTION 30 ¤30.00 07/01/2024
SW ENG REINSPECTION 30 ¤30.00 07/01/2024
PLAN REVIEW - REVISION ¤32.50 07/01/2024
WATER- TURN ON ¤25.00 12/12/2023
ADJUSTMENT 50% (¤410.36) 12/12/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/12/2023
INSPECTION - RESIDENTIAL ¤616.00 12/12/2023
PLAN REVIEW - RESIDENTIAL ¤174.72 12/12/2023
SW ENG - REVIEW 20 ¤20.00 12/12/2023
SW ENG RES REVIEW 200 ¤200.00 12/12/2023
SEWER INSPECTION ¤25.00 12/12/2023
SEWER CAPITAL FACILITY ¤5,344.82 12/12/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 12/12/2023
SITE PLAN 30 ¤30.00 12/12/2023
CONNECTION FEES ¤1,166.26 12/12/2023
FC IMPACT FEE EMS ¤62.00 12/12/2023
IMPACT FEE FIRE ¤428.09 12/12/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/12/2023
FC IMPACT FEE LIBRARY ¤268.00 12/12/2023
IMPACT FEE PARKS ¤1,800.99 12/12/2023
IMPACT FEE SCHOOL ¤5,450.00 12/12/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 12/12/2023
WATER -IRRIGATION INSPECTION ¤25.00 12/12/2023
SURCHARGE FS 533.721 ¤4.10 12/12/2023
SURCHARGE - FS 468.631 ¤6.16 12/12/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/12/2023
SW ENG INSPECTION 80 ¤80.00 12/12/2023
SW ENG PRE APRON ¤30.00 12/12/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,482.16