I want to search for...

Permit #2023101172

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00840-0290
CONDITIONED SPACE: 1500 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 12 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
Total Square Footage: 2008 sqft
Block: 00840
Subdivision: 2211 - SECTION 59-SEMINOLE PARK
Job Phone: 202-494-2019
Location Address: 14 SEA GARDEN PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/12/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD SUITE 220

ORLANDO, FL 32803

Lot: 0290
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/31/2024 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 05/31/2024 APPROVED DHANEY
ROW - STORMWATER FINAL 05/31/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
U -UTILITY RESIDENTIAL FINAL 05/31/2024 APPROVED - AS NOTED DHANEY
Note: *** NOTES ADDED BY DHANEY 5/31/2024 9:10:14 AM *** Sewer Dept. needs to trouble shoot the Pep tank - advised the sewer dept. .
ROW - FINAL APRON (AFTER POUR) 05/28/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/28/2024 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 05/28/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- PRE-APRON (PRE-POUR) 04/30/2024 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW - DRAINAGE 04/29/2024 APPROVED PFLANAGAN
Note: CORRECTION MADE PORTER JOHN OUT OF THE ROW AND SILT FENCE RE-ESTABLISH ---------------------------------------------------------------------------- 4/26/2024 - PREVIOUS INSPECTION NOTES 4/26/24 CORRECTIONS REQUIRED NOT MADE. PLEASE SEE PREVIOUS INSPECTION NOTES. WILL BE BACK FOR COMPLIANCE REINSPECTION 4/29/24 _________________________________________________________________________________________________________________________ 4/25/2024 - PREVIOUS INSPECTION NOTES 4/25/24 CULVERT PIPE IS OK AT THIS INSPECTION. YOU STILL NEED TO REMOVE PORTA POTTY FROM ROW AND REPAIR/REESTABLISH SILT FENCE AS PREVIOUSLY NOTED. NEXT INSPECTION 4/26/24 _________________________________________________________________________________________________________________________ 4/19/2024 - PREVIOUS INSPECTION NOTES 04/19/24 NO CHANGES HAVE BEEN MADE. NEXT INSPECTION 04/25/24 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 **TEMP PIPE IS CRUSHED AND NEEDS TO BE REPLACED. ** PORTA POTTY NEEDS TO BE REMOVED FROM SWALE, **SILT FENCE NEEDS TO BE REESTABLISHED AND ALL DEBRIS CONTAINED TO BUILDERS SITE. ** NEXT INSPECTION 04/19/24 RESIDENT FROM 16 SEA GARDEN SAYS "INB is building a house next door to me and all of the sand, dirt & trash in front of the house is going into my swale & underneath the culvert pipe causing it to clog. I have tried calling the builder, but all I can do is leave a message" PLS INSPECT FOR SILT FENCE MH
ROW - DRAINAGE 04/26/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 4/26/24 CORRECTIONS REQUIRED NOT MADE. PLEASE SEE PREVIOUS INSPECTION NOTES. WILL BE BACK FOR COMPLIANCE REINSPECTION 4/29/24 _________________________________________________________________________________________________________________________ 4/25/2024 - PREVIOUS INSPECTION NOTES 4/25/24 CULVERT PIPE IS OK AT THIS INSPECTION. YOU STILL NEED TO REMOVE PORTA POTTY FROM ROW AND REPAIR/REESTABLISH SILT FENCE AS PREVIOUSLY NOTED. NEXT INSPECTION 4/26/24 _________________________________________________________________________________________________________________________ 4/19/2024 - PREVIOUS INSPECTION NOTES 04/19/24 NO CHANGES HAVE BEEN MADE. NEXT INSPECTION 04/25/24 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 **TEMP PIPE IS CRUSHED AND NEEDS TO BE REPLACED. ** PORTA POTTY NEEDS TO BE REMOVED FROM SWALE, **SILT FENCE NEEDS TO BE REESTABLISHED AND ALL DEBRIS CONTAINED TO BUILDERS SITE. ** NEXT INSPECTION 04/19/24 RESIDENT FROM 16 SEA GARDEN SAYS "INB is building a house next door to me and all of the sand, dirt & trash in front of the house is going into my swale & underneath the culvert pipe causing it to clog. I have tried calling the builder, but all I can do is leave a message" PLS INSPECT FOR SILT FENCE MH
ROW - DRAINAGE 04/25/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 4/25/24 CULVERT PIPE IS OK AT THIS INSPECTION. YOU STILL NEED TO REMOVE PORTA POTTY FROM ROW AND REPAIR/REESTABLISH SILT FENCE AS PREVIOUSLY NOTED. NEXT INSPECTION 4/26/24 _________________________________________________________________________________________________________________________ 4/19/2024 - PREVIOUS INSPECTION NOTES 04/19/24 NO CHANGES HAVE BEEN MADE. NEXT INSPECTION 04/25/24 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 **TEMP PIPE IS CRUSHED AND NEEDS TO BE REPLACED. ** PORTA POTTY NEEDS TO BE REMOVED FROM SWALE, **SILT FENCE NEEDS TO BE REESTABLISHED AND ALL DEBRIS CONTAINED TO BUILDERS SITE. ** NEXT INSPECTION 04/19/24 RESIDENT FROM 16 SEA GARDEN SAYS "INB is building a house next door to me and all of the sand, dirt & trash in front of the house is going into my swale & underneath the culvert pipe causing it to clog. I have tried calling the builder, but all I can do is leave a message" PLS INSPECT FOR SILT FENCE MH
ROW - DRAINAGE 04/19/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 04/19/24 NO CHANGES HAVE BEEN MADE. NEXT INSPECTION 04/25/24 4/15/2024 - PREVIOUS INSPECTION NOTES 04/15/24 **TEMP PIPE IS CRUSHED AND NEEDS TO BE REPLACED. ** PORTA POTTY NEEDS TO BE REMOVED FROM SWALE, **SILT FENCE NEEDS TO BE REESTABLISHED AND ALL DEBRIS CONTAINED TO BUILDERS SITE. ** NEXT INSPECTION 04/19/24 RESIDENT FROM 16 SEA GARDEN SAYS "INB is building a house next door to me and all of the sand, dirt & trash in front of the house is going into my swale & underneath the culvert pipe causing it to clog. I have tried calling the builder, but all I can do is leave a message" PLS INSPECT FOR SILT FENCE MH
ELECTRIC - EARLY POWER 04/18/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 3-1-24 1. Emailed FPL at 10:46. 4-18-24 1. Emailed FPL at 9:00.
GRAVITY SEWER TEST 04/17/2024 APPROVED BTAYLOR
SEWER TIE IN 04/17/2024 APPROVED BTAYLOR
ROW - DRAINAGE 04/15/2024 Disapproved - NO FEE TPOLACEK
Note: 04/15/24 **TEMP PIPE IS CRUSHED AND NEEDS TO BE REPLACED. ** PORTA POTTY NEEDS TO BE REMOVED FROM SWALE, **SILT FENCE NEEDS TO BE REESTABLISHED AND ALL DEBRIS CONTAINED TO BUILDERS SITE. ** PHOTOS ATTACHED ** NEXT INSPECTION 04/19/24 RESIDENT FROM 16 SEA GARDEN SAYS "INB is building a house next door to me and all of the sand, dirt & trash in front of the house is going into my swale & underneath the culvert pipe causing it to clog. I have tried calling the builder, but all I can do is leave a message" PLS INSPECT FOR SILT FENCE MH
PEP TANK INSTALLATION REQUEST 04/03/2024 APPROVED CBOWERMASTER
Note: 3/22/2024 7:54:41 AM- PREVIOUS INSPECTION NOTES DUMPSTER
PEP TANK INSTALLATION REQUEST 03/21/2024 Disapproved -FEE REQUIRED BVITALE
Note: DUMPSTER
INSULATION 03/18/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 03/12/2024 APPROVED BTAYLOR
ALL ROUGH 03/08/2024 APPROVED BTAYLOR
ELECTRIC-TUG 03/01/2024 APPROVED - AS NOTED BTAYLOR
Note: 3-1-24 1. Emailed FPL at 10:46.
ROOF VALLEY & METAL 02/28/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/22/2024 APPROVED BTAYLOR
Note: 2/21/2024 - PREVIOUS INSPECTION NOTES 2-21-24 1. Loose sheeting at double truss in kitchen and on back porch. 2. 2 straps in garage need to be nailed. 3. Missing engineering circled in packet.
WALL SHEATHING 02/21/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/21/2024 Disapproved - NO FEE BTAYLOR
Note: 2-21-24 1. Loose sheeting at double truss in kitchen and on back porch. 2. 2 straps in garage need to be nailed. 3. Missing engineering circled in packet.
FOUND SURVEY APPROVED (OFFICE) 02/20/2024 APPROVED TBAKER
TIE BEAM / LINTEL 02/13/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 01/29/2024 APPROVED RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 01/22/2024 APPROVED MGIBSON
Note: 1/19/2024 - PREVIOUS INSPECTION NOTES PLUMBER STILL WORKING
PLUMBING 1ST ROUGH UNDERGROUND 01/19/2024 Disapproved - NO FEE MGIBSON
Note: PLUMBER STILL WORKING
WATER METER INSTALLATION REQUEST 12/28/2023 APPROVED BVITALE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/14/2024 02/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2024 02/14/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 01/31/2024 01/31/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 10/26/2023 12/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 10/25/2023 10/25/2023
Note: Released By: JPI
CUSVC COMPLETE 10/25/2023 10/26/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/25/2023 10/26/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/25/2023 10/26/2023
LOCATE COMPLETE 10/25/2023 10/30/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 10/25/2023 10/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 10/25/2023 11/06/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON COMPLETE 10/25/2023 10/26/2023
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
BADMIN COMPLETE 10/25/2023 10/30/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 05/30/2024
SW ENG - INSPECTION 20 ¤20.00 05/30/2024
SW ENG - INSPECTION 20 ¤20.00 05/30/2024
SW ENG - INSPECTION 20 ¤20.00 05/30/2024
SW ENG - INSPECTION 20 ¤20.00 05/30/2024
UTILITY PEP REINSPECTION ¤40.00 05/30/2024
SEWER CREDIT (¤850.00) 12/12/2023
SEWER INSPECTION ¤25.00 12/12/2023
SEWER CAPITAL FACILITY ¤5,344.82 12/12/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 12/12/2023
SITE PLAN 30 ¤30.00 12/12/2023
SW ENG INSPECTION 80 ¤80.00 12/12/2023
SW ENG PRE APRON ¤30.00 12/12/2023
SW ENG - REVIEW 20 ¤20.00 12/12/2023
SW ENG RES REVIEW 200 ¤200.00 12/12/2023
WATER- TURN ON ¤25.00 12/12/2023
ADJUSTMENT 50% (¤345.06) 12/12/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/12/2023
INSPECTION - RESIDENTIAL ¤514.25 12/12/2023
PLAN REVIEW - RESIDENTIAL ¤145.86 12/12/2023
CONNECTION FEES ¤1,166.26 12/12/2023
CONTRACTOR CHANGE ¤20.00 12/12/2023
FC IMPACT FEE EMS ¤62.00 12/12/2023
IMPACT FEE FIRE ¤428.09 12/12/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/12/2023
FC IMPACT FEE LIBRARY ¤268.00 12/12/2023
IMPACT FEE PARKS ¤1,800.99 12/12/2023
IMPACT FEE SCHOOL ¤5,450.00 12/12/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 12/12/2023
WATER -IRRIGATION INSPECTION ¤25.00 12/12/2023
SURCHARGE FS 533.721 ¤3.45 12/12/2023
SURCHARGE - FS 468.631 ¤5.18 12/12/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/12/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,592.72