I want to search for...
Permit #2023101205
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00770-0110 |
| CONDITIONED SPACE: 1243 sqft |
| GARAGE: 425 sqft |
| OPENED PORCH (WITH ROOF) : 31 sqft |
| Total Square Footage: 1699 sqft |
| Block: 00770 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 202-494-2019 |
| Location Address: 15 RAMBLING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/27/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/23/2024 | FINAL APPROVED | AGAETANO |
| ROW - FINAL APRON (AFTER POUR) | 07/23/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 07/23/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 07/23/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/23/2024 8:26:47 AM *** water meter box not located Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/31/2024 2:10:46 PM *** no irr-nocross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 07/23/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/23/2024 9:48:57 AM *** please if you see water meter box going to be low=trip hazard-then contact city to raise it at customer-service@palmcoastgov.com 7/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/23/2024 8:26:47 AM *** water meter box not located Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 5/31/2024 2:10:46 PM *** no irr-nocross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/22/2024 | APPROVED | TPOLACEK |
| Note: 7/3/2024 - PREVIOUS INSPECTION NOTES 07/03/24 TPOLACEK*** SURVEY INDICATES BACK LEFT SIDE OF PROPERTY WILL NEGATIVELY IMPACT THE ADJOINING PROPERTY TO THE LEFT. IF THERE IS A DRAINAGE CONVEYANCE ALONG THE PROPERTY THAT WILL HOLD BACK THE WATER SURVEY MUST INDICATE SO. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 18 Propose Drainage Pattern Sec 300.01c(5) Sec 300.01c(5).The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. There must be sufficient elevation shots to indicate the proposed drainage pattern. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/22/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PROJECT STATUS | 07/22/2024 | APPROVED | TPOLACEK |
| Note: FINAL SURVEY PASSED THERE IS NO NEED FOR PROJECT STATUS 1PM SITE MEET | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/03/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 07/03/24 TPOLACEK*** SURVEY INDICATES BACK LEFT SIDE OF PROPERTY WILL NEGATIVELY IMPACT THE ADJOINING PROPERTY TO THE LEFT. IF THERE IS A DRAINAGE CONVEYANCE ALONG THE PROPERTY THAT WILL HOLD BACK THE WATER SURVEY MUST INDICATE SO. 15 Negatively impact Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) 18 Propose Drainage Pattern Sec 300.01c(5) Sec 300.01c(5).The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. There must be sufficient elevation shots to indicate the proposed drainage pattern. 8 Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/31/2024 | APPROVED | TPOLACEK |
| Note: 05/31/24 TPOLACEK*** MET ISITE CONSTRUCTION AND THEY WERE IN PROCESS OF RESETTING PIPE. I WAITED FOR THEM TO COMPLETE THE JOB AND CULVERT IS WITHEN TOLERANCE THIS TIME. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/30/2024 - PREVIOUS INSPECTION NOTES THE CULVERT IS STILL OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan. ----------------------------------------------------------------------- 5/22/2024 - PREVIOUS INSPECTION NOTES 05/22/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE BY OVER THE .10 ALLOWANCE. i HAVE ALSO ATTACHED A COPY OF THE CULVERT DIAGRAM. PIPE SHOULD BE BURIED 1/2 WAY. YOUR PIPE IS NOT BURIED ENOUGH. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| U-CROSS CONNECTION | 05/31/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/31/2024 2:10:46 PM *** no irr-nocross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 05/30/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE CULVERT IS STILL OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan. ----------------------------------------------------------------------- 5/22/2024 - PREVIOUS INSPECTION NOTES 05/22/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE BY OVER THE .10 ALLOWANCE. i HAVE ALSO ATTACHED A COPY OF THE CULVERT DIAGRAM. PIPE SHOULD BE BURIED 1/2 WAY. YOUR PIPE IS NOT BURIED ENOUGH. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 05/22/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 05/22/24 TPOLACEK*** CULVERT IS OUT OF TOLERANCE BY OVER THE .10 ALLOWANCE. i HAVE ALSO ATTACHED A COPY OF THE CULVERT DIAGRAM. PIPE SHOULD BE BURIED 1/2 WAY. YOUR PIPE IS NOT BURIED ENOUGH. 2 Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| GRAVITY SEWER TEST | 04/29/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 04/29/2024 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 04/23/2024 | APPROVED | AGAETANO |
| PEP TANK INSTALLATION REQUEST | 04/11/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 04/01/2024 | APPROVED | AGAETANO |
| Note: 3/27/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 03-22-2024 Dryer exhaust not complete and shield plates missing. Check at next inspection. 03-27-2024 Above issue not resolved. Dryer exhaust not complete and shield plates missing. | |||
| LATH/BRICK/ WATER BARRIER | 03/28/2024 | APPROVED | AGAETANO |
| INSULATION | 03/27/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 03-22-2024 Dryer exhaust not complete and shield plates missing. Check at next inspection. 03-27-2024 Above issue not resolved. Dryer exhaust not complete and shield plates missing. | |||
| ALL ROUGH | 03/22/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 03-22-2024 Dryer exhaust not complete and shield plates missing. Check at next inspection. | |||
| ELECTRIC-TUG | 03/08/2024 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 03/07/2024 | APPROVED | BTAYLOR |
| WALL SHEATHING | 03/06/2024 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/06/2024 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 02/23/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/21/2024 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 02/12/2024 | APPROVED | JWALKER |
| Note: 2/9/2024 - PREVIOUS INSPECTION NOTES 1. Termite certification. Or intent to treat letter has not been posted in the job box. 2. The slab depth is to be a minimum of 4" See page S 0.0. Areas measuring as litte as 2 3/4. Remove excess soil and tamp slab. Reinstall test sting lines for the reispection. 3. Pex pipe sleve's need to protect the entire pipe. P-2603 | |||
| MONOLITHIC SLAB | 02/09/2024 | Disapproved - NO FEE | JWALKER |
| Note: 1. Termite certification. Or intent to treat letter has not been posted in the job box. 2. The slab depth is to be a minimum of 4" See page S 0.0. Areas measuring as litte as 2 3/4. Remove excess soil and tamp slab. Reinstall test sting lines for the reispection. 3. Pex pipe sleve's need to protect the entire pipe. P-2603 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/06/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/09/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/05/2024 | 06/10/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/22/2024 | 02/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/22/2024 | 02/22/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/12/2024 | 02/12/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 02/12/2024 | 02/12/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/19/2023 | 12/27/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 12/19/2023 | 12/19/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process payment for permit. Stormwater has a hold that needs to be addressed before we are able to process payment. They put on hold and this should have been in apply stage. Please address Stormwater hold. Thank you! | |||
| ENGIN1 | COMPLETE | 12/19/2023 | 12/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/19/2023 | 12/19/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/17/2023 | 11/17/2023 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM FF elv to be revised and change to B drain | |||
| SW1 | COMPLETE | 11/08/2023 | 11/17/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/08/2023 | 11/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/08/2023 | 11/08/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM no zoning changes only for stormwater | |||
| BLD | COMPLETE | 10/26/2023 | 10/27/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/26/2023 | 10/27/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/26/2023 | 10/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/26/2023 | 10/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/26/2023 | 10/30/2023 |
| LOCATE | COMPLETE | 10/26/2023 | 10/31/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/26/2023 | 10/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 10/26/2023 | 11/08/2023 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please add drainage flow arrows | |||
| ZON | COMPLETE | 10/26/2023 | 10/27/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/26/2023 | 10/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 10/26/2023 | 12/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/23/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/23/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/01/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/01/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/01/2024 |
| CONNECTION FEES | ¤1,166.26 | 12/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/27/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/27/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 12/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/27/2023 |
| SURCHARGE FS 533.721 | ¤2.92 | 12/27/2023 |
| SURCHARGE - FS 468.631 | ¤4.38 | 12/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/27/2023 |
| WATER- TURN ON | ¤25.00 | 12/27/2023 |
| ADJUSTMENT 50% | (¤292.11) | 12/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/27/2023 |
| INSPECTION - RESIDENTIAL | ¤431.75 | 12/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤122.46 | 12/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/27/2023 |
| SEWER CREDIT | (¤1,147.00) | 12/27/2023 |
| SEWER INSPECTION | ¤25.00 | 12/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.38 | 12/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 12/27/2023 |
| SITE PLAN 30 | ¤30.00 | 12/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,243.50 |