Permit #2023101249

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0570
CONDITIONED SPACE: 3836 sqft
GARAGE: 1092 sqft
OPENED PORCH (WITH ROOF) : 62 sqft
OPENED PORCH (WITH ROOF) : 451 sqft
OPENED PORCH (WITH ROOF) : 423 sqft
Total Square Footage: 5864 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-236-4133
Location Address: 56 SCARLET OAK CIR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/04/2023
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: JAMES J RUSHING & ELISABETH H RUSHING

Address

26 N VILLAGE PARKWAY

PALM COAST, FL 32137

Lot: 0570
Contracted Stated Job Value: ¤701,290.00
Job Description: Single Family Residence
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
HUGH MACDONALD
Status Location Address State License Number
INACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2024)
JIM ROMEKA
Status Location Address State License Number Phone
INACTIVE

5225 EDGEWOOD CT

JACKSONVILLE, FL 32254

26657 (Exp: 09/01/2024) 904-389-2700

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/07/2024 FINAL APPROVED HCAMACHO
U-CROSS CONNECTION 10/07/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 10/7/2024 9:42:17 AM *** reclaim irr-no cross connection
ROW - STORMWATER FINAL 10/07/2024 APPROVED - AS NOTED FSLADISH
Note: 10/7/24 THIS IS A DUPLICATE INSPECTION. THIS ROW STORMWATER FINAL INSPECTION WAS PASSED ON 10/4/24. APPROVING AS NOTED.
U -UTILITY RESIDENTIAL FINAL 10/07/2024 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 10/04/2024 APPROVED FSLADISH
Note: 10/4/24 BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/04/2024 APPROVED FSLADISH
Note: 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 You need to have elevation shotS every 20 ft on your rear property line ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 LITTLE BIT OF WATER IN THE SIDEWALK CM ENSURED ME THAT IT WILL BE PUMPED OUT BEFORE POURING CONCRETE . ------------------------------------------------------------------------------------------- 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/04/2024 APPROVED FSLADISH
Note: 10/4/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 10/04/2024 APPROVED FSLADISH
Note: 10/4/24 BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/25/2024 Disapproved - NO FEE FSLADISH
Note: 9/25/24 You need to have elevation shotS every 20 ft on your rear property line ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 LITTLE BIT OF WATER IN THE SIDEWALK CM ENSURED ME THAT IT WILL BE PUMPED OUT BEFORE POURING CONCRETE . ------------------------------------------------------------------------------------------- 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELEVATION CERTIFICATE-FINAL APPROVAL 09/24/2024 APPROVED JMYERS
ROW- PRE-APRON (PRE-POUR) 08/30/2024 APPROVED - AS NOTED PFLANAGAN
Note: LITTLE BIT OF WATER IN THE SIDEWALK CM ENSURED ME THAT IT WILL BE PUMPED OUT BEFORE POURING CONCRETE . ------------------------------------------------------------------------------------------- 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 08/08/2024 APPROVED - AS NOTED BTAYLOR
Note: 8-8-24 1. Emailed FPL at 10:31.
ROW- PRE-APRON (PRE-POUR) 07/26/2024 APPROVED - AS NOTED FSLADISH
Note: 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PAVER RESTRAINTS 07/12/2024 APPROVED - AS NOTED FSLADISH
Note: 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 07/12/2024 PARTIALLY APPROVED FSLADISH
Note: 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
LATH/BRICK/ WATER BARRIER 06/05/2024 APPROVED BTAYLOR
Note: 5/9/2024 - PREVIOUS INSPECTION NOTES 5-9-24 1. Whole house is good to stucco. Upper entry way needs special flashing which can not be installed until stucco is installed on under side.
GRAVITY SEWER TEST 05/23/2024 APPROVED MGIBSON
SEWER TIE IN 05/23/2024 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 05/09/2024 PARTIALLY APPROVED BTAYLOR
Note: 5-9-24 1. Whole house is good to stucco. Upper entry way needs special flashing which can not be installed until stucco is installed on under side.
INSULATION 05/07/2024 APPROVED BTAYLOR
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 4-30-24 In house gas looked at and passed, (pool gas will be run undergraound per William). need the following by insulation 1. Improper nail plates for plumbing at double top plates (must cover top plates and extend 2 inches below. FBC P2603.2.1, 2. Need fire blocking throughout R302.11 4/29/2024 - PREVIOUS INSPECTION NOTES cancelled per WIlliam Not ready 5-6-24 1. Missing foam in some spots. Marked with orange paint where foam was missed.
INSULATION 05/06/2024 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2420 4-30-24 In house gas looked at and passed, (pool gas will be run undergraound per William). need the following by insulation 1. Improper nail plates for plumbing at double top plates (must cover top plates and extend 2 inches below. FBC P2603.2.1, 2. Need fire blocking throughout R302.11 4/29/2024 - PREVIOUS INSPECTION NOTES cancelled per WIlliam Not ready 5-6-24 1. Missing foam in some spots. Marked with orange paint where foam was missed.
ALL ROUGH 04/30/2024 APPROVED - AS NOTED LMILLER
Note: 4-30-24 In house gas looked at and passed, (pool gas will be run undergraound per William). need the following by insulation 1. Improper nail plates for plumbing at double top plates (must cover top plates and extend 2 inches below. FBC P2603.2.1, 2. Need fire blocking throughout R302.11 4/29/2024 - PREVIOUS INSPECTION NOTES cancelled per WIlliam Not ready
ALL ROUGH 04/29/2024 CANCELLED BY APPLICANT LMILLER
Note: cancelled per WIlliam Not ready
ELECTRIC-TUG 04/29/2024 APPROVED RMARTIN
ROOF VALLEY & METAL 04/08/2024 APPROVED BTAYLOR
WALL SHEATHING 04/02/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/02/2024 FINAL APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 04/01/2024 APPROVED TBAKER
ELEV CERT-FOUNDATION APPROVAL 03/28/2024 APPROVED - AS NOTED JMYERS
Note: The Foundation elevation certificate has been approved. However, at Final in Section C2, if there is a measurement a box for feet needs to be checked or it will not be approved.
TIE BEAM / LINTEL 03/05/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 02/23/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/14/2024 APPROVED MGIBSON
Note: 2/13/2024 - PREVIOUS INSPECTION NOTES WILLIAM CALLED FROM ICI
PLUMBING 1ST ROUGH UNDERGROUND 02/13/2024 CANCELLED BY APPLICANT MGIBSON
Note: WILLIAM CALLED FROM ICI
WATER METER INSTALLATION REQUEST 01/09/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
PLFM COMPLETE 09/24/2024 09/24/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM COMPLETE 03/27/2024 03/28/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final in Section C2, if there is a measurement a box for feet needs to be checked or it will not be approved.
ENGIN1 COMPLETE 03/20/2024 03/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/20/2024 03/20/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 03/20/2024 03/27/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
PLFM HOLD 03/20/2024 03/21/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A8 a-f need to be N/A not 0. A9b needs to be No not N/A. B9 is missing a measurement indicator for the BFE, please add either ft. or '. C2a, d, f, g need to be to the tenth not the hundredth. C2b, c, e, h cannot be left blank; they need to have N/A if there is no measurement. Pages 2-8 of the elevation certificate need to be turned in, not just 2 and 3.
BLD COMPLETE 02/14/2024 02/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 02/06/2024 02/12/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Truss packet needs to have shop drawing approval stamp from engineer of record
MECH COMPLETE 11/30/2023 11/30/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 11/29/2023 11/29/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.)
PLFM COMPLETE 11/27/2023 11/28/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, at Foundation A9 c-e need to be 0 not N/A. B9 needs to be 8.0 not just 8. In Section D, if there are no attachments please do not check the box for attachments.
MECH HOLD 11/27/2023 11/28/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire heatload
SW1 COMPLETE 11/27/2023 11/28/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
SW1 HOLD 11/16/2023 11/27/2023
Note: Held By: SINA VEDADI MOGHADAM - - SVEDADIMOGHADAM@PALMCOASTGOV.COM 2- The current version does not separate current from proposed elevations. Please revise proposed elevations and existing elevations according to sheet 1. 3- Please include elevations for all adjacent properties at a minimum of 20 feet intervals, with an offset of 10 feet. Some points appear to be at a 20 foot offset outside the property lines. 4- As per the following guidelines, please provide Sod elevations adjacent to the structure": 4” below the FFE for block and 6” for wood frame structure
PLFM HOLD 11/16/2023 11/17/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A8 a-f need to be N/A per new FEMA instructions. A9b needs to be No not N/A, f needs to be N/A if A9d or A9e are 0 per new FEMA instructions. B1a please capitalize Coast. B9 please add a measurement mark after the BFE to show that it is in feet. C2b, c, h cannot be left blank it needs to say N/A if there are no elevations. C2 a, d, e, f, and g need to be the tenth not the hundredth. C2 g needs to be in feet not meters. There are no proposed elevations for the garage on the Site Plan to verify the elevation on the Elevation Certificate, please add. Section D, the seal is not visible please shade it so that it is visible. Pages 2-8 of the elevation certificate need to be submitted.
BADMIN INFORMATION 11/16/2023 11/16/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM uploaded info must include ALL hold information - missing gas, mechanical, etc
GAS COMPLETE 11/16/2023 11/20/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 11/16/2023 11/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide entire Energy calc and heatload with duct layout. Heatload conflicts and shows wrong btu data on block 1. Missing pages of heatload 2. Energy calcs need to be signed by the builder
SW1 HOLD 11/12/2023 11/13/2023
Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM PLease refer to stormwater checklist for proposed elv's and requirements
ZON COMPLETE 11/12/2023 11/13/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 11/12/2023 11/16/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Comment not addressed: According to the Site Plan submitted on 11/10/23, the structure will fall inside the SFHA. Elevation certificates are required at Construction Drawings, Foundation, and Final.
BLD COMPLETE 10/27/2023 10/30/2023
Note: Released By: JPI
CUSVC COMPLETE 10/27/2023 10/30/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/27/2023 10/31/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/27/2023 10/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS HOLD 10/27/2023 10/31/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide material type for each gas line
LOCATE COMPLETE 10/27/2023 11/02/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/27/2023 10/31/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition 2. Design location on Heatload needs to be St. Augustine 3. Chosen equipment for Block 1on heatload exceeds the maximum of 1.15 times the load calculated.per R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition
SW1 HOLD 10/27/2023 11/08/2023
Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM See the uploaded Stormwater checklist in the attachments for correction. Make corrections on all unchecked items.
ZON HOLD 10/27/2023 10/27/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood map number incorrect on site plan/survey Please provide walkaway width and material on site plan/survey Please provide the driveway material and width of site plan
BADMIN COMPLETE 10/27/2023 10/31/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM HOLD 10/27/2023 10/27/2023
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 10/25/23, the structure will fall inside the SFHA. Elevation certificates are required at Construction, Foundation, and Final. FEMA FIRM information is incorrect on Site Plan and Survey, please correct.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 12/04/2023
WATER-METER ¤419.86 12/04/2023
ADJUSTMENT 50% (¤1,254.03) 12/04/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/04/2023
INSPECTION - RESIDENTIAL ¤1,930.50 12/04/2023
PLAN REVIEW - RESIDENTIAL ¤547.56 12/04/2023
CONNECTION FEES ¤25.00 12/04/2023
FC IMPACT FEE EMS ¤62.00 12/04/2023
IMPACT FEE FIRE ¤428.09 12/04/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/04/2023
FC IMPACT FEE LIBRARY ¤268.00 12/04/2023
IMPACT FEE PARKS ¤1,800.99 12/04/2023
IMPACT FEE SCHOOL ¤5,450.00 12/04/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 12/04/2023
SURCHARGE FS 533.721 ¤12.54 12/04/2023
SURCHARGE - FS 468.631 ¤18.81 12/04/2023
SW ENG - FOUNDATION SURVEY ¤20.00 12/04/2023
SW ENG INSPECTION 80 ¤80.00 12/04/2023
SW ENG PRE APRON ¤30.00 12/04/2023
SW ENG - REVIEW 20 ¤20.00 12/04/2023
SW ENG RES REVIEW 200 ¤200.00 12/04/2023
SEWER INSPECTION ¤25.00 12/04/2023
SITE PLAN 30 ¤30.00 12/04/2023
Fees Total Due: ¤0.00 Total Paid: ¤14,178.71