Permit #2023101249
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0570 |
| CONDITIONED SPACE: 3836 sqft |
| GARAGE: 1092 sqft |
| OPENED PORCH (WITH ROOF) : 62 sqft |
| OPENED PORCH (WITH ROOF) : 451 sqft |
| OPENED PORCH (WITH ROOF) : 423 sqft |
| Total Square Footage: 5864 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-236-4133 |
| Location Address: 56 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/04/2023 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: JAMES J RUSHING & ELISABETH H RUSHING |
|
Address 26 N VILLAGE PARKWAY PALM COAST, FL 32137 |
| Lot: 0570 |
| Contracted Stated Job Value: ¤701,290.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
HUGH MACDONALD
| Status | Location Address | State License Number |
| INACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2024) |
JIM ROMEKA
| Status | Location Address | State License Number | Phone |
| INACTIVE |
5225 EDGEWOOD CT JACKSONVILLE, FL 32254 |
26657 (Exp: 09/01/2024) | 904-389-2700 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/07/2024 | FINAL APPROVED | HCAMACHO |
| U-CROSS CONNECTION | 10/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/7/2024 9:42:17 AM *** reclaim irr-no cross connection | |||
| ROW - STORMWATER FINAL | 10/07/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/7/24 THIS IS A DUPLICATE INSPECTION. THIS ROW STORMWATER FINAL INSPECTION WAS PASSED ON 10/4/24. APPROVING AS NOTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/07/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 10/04/2024 | APPROVED | FSLADISH |
| Note: 10/4/24 BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/04/2024 | APPROVED | FSLADISH |
| Note: 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 You need to have elevation shotS every 20 ft on your rear property line ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 LITTLE BIT OF WATER IN THE SIDEWALK CM ENSURED ME THAT IT WILL BE PUMPED OUT BEFORE POURING CONCRETE . ------------------------------------------------------------------------------------------- 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/04/2024 | APPROVED | FSLADISH |
| Note: 10/4/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 10/04/2024 | APPROVED | FSLADISH |
| Note: 10/4/24 BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/25/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/25/24 You need to have elevation shotS every 20 ft on your rear property line ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 LITTLE BIT OF WATER IN THE SIDEWALK CM ENSURED ME THAT IT WILL BE PUMPED OUT BEFORE POURING CONCRETE . ------------------------------------------------------------------------------------------- 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 09/24/2024 | APPROVED | JMYERS |
| ROW- PRE-APRON (PRE-POUR) | 08/30/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: LITTLE BIT OF WATER IN THE SIDEWALK CM ENSURED ME THAT IT WILL BE PUMPED OUT BEFORE POURING CONCRETE . ------------------------------------------------------------------------------------------- 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 08/08/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-8-24 1. Emailed FPL at 10:31. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/26/24 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PAVER RESTRAINTS | 07/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/12/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 7/12/24 READY TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. ***** DO NOT LAY ANY PAVERS UNTIL SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SUBMITTED AND APPROVED.***** READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| LATH/BRICK/ WATER BARRIER | 06/05/2024 | APPROVED | BTAYLOR |
| Note: 5/9/2024 - PREVIOUS INSPECTION NOTES 5-9-24 1. Whole house is good to stucco. Upper entry way needs special flashing which can not be installed until stucco is installed on under side. | |||
| GRAVITY SEWER TEST | 05/23/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 05/23/2024 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 05/09/2024 | PARTIALLY APPROVED | BTAYLOR |
| Note: 5-9-24 1. Whole house is good to stucco. Upper entry way needs special flashing which can not be installed until stucco is installed on under side. | |||
| INSULATION | 05/07/2024 | APPROVED | BTAYLOR |
| Note: 5/6/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 4-30-24 In house gas looked at and passed, (pool gas will be run undergraound per William). need the following by insulation 1. Improper nail plates for plumbing at double top plates (must cover top plates and extend 2 inches below. FBC P2603.2.1, 2. Need fire blocking throughout R302.11 4/29/2024 - PREVIOUS INSPECTION NOTES cancelled per WIlliam Not ready 5-6-24 1. Missing foam in some spots. Marked with orange paint where foam was missed. | |||
| INSULATION | 05/06/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 4-30-24 In house gas looked at and passed, (pool gas will be run undergraound per William). need the following by insulation 1. Improper nail plates for plumbing at double top plates (must cover top plates and extend 2 inches below. FBC P2603.2.1, 2. Need fire blocking throughout R302.11 4/29/2024 - PREVIOUS INSPECTION NOTES cancelled per WIlliam Not ready 5-6-24 1. Missing foam in some spots. Marked with orange paint where foam was missed. | |||
| ALL ROUGH | 04/30/2024 | APPROVED - AS NOTED | LMILLER |
| Note: 4-30-24 In house gas looked at and passed, (pool gas will be run undergraound per William). need the following by insulation 1. Improper nail plates for plumbing at double top plates (must cover top plates and extend 2 inches below. FBC P2603.2.1, 2. Need fire blocking throughout R302.11 4/29/2024 - PREVIOUS INSPECTION NOTES cancelled per WIlliam Not ready | |||
| ALL ROUGH | 04/29/2024 | CANCELLED BY APPLICANT | LMILLER |
| Note: cancelled per WIlliam Not ready | |||
| ELECTRIC-TUG | 04/29/2024 | APPROVED | RMARTIN |
| ROOF VALLEY & METAL | 04/08/2024 | APPROVED | BTAYLOR |
| WALL SHEATHING | 04/02/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/02/2024 | FINAL APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 04/01/2024 | APPROVED | TBAKER |
| ELEV CERT-FOUNDATION APPROVAL | 03/28/2024 | APPROVED - AS NOTED | JMYERS |
| Note: The Foundation elevation certificate has been approved. However, at Final in Section C2, if there is a measurement a box for feet needs to be checked or it will not be approved. | |||
| TIE BEAM / LINTEL | 03/05/2024 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 02/23/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/14/2024 | APPROVED | MGIBSON |
| Note: 2/13/2024 - PREVIOUS INSPECTION NOTES WILLIAM CALLED FROM ICI | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/13/2024 | CANCELLED BY APPLICANT | MGIBSON |
| Note: WILLIAM CALLED FROM ICI | |||
| WATER METER INSTALLATION REQUEST | 01/09/2024 | APPROVED | BVITALE |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 09/24/2024 | 09/24/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | COMPLETE | 03/27/2024 | 03/28/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. However, at Final in Section C2, if there is a measurement a box for feet needs to be checked or it will not be approved. | |||
| ENGIN1 | COMPLETE | 03/20/2024 | 03/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2024 | 03/20/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/20/2024 | 03/27/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 03/20/2024 | 03/21/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A8 a-f need to be N/A not 0. A9b needs to be No not N/A. B9 is missing a measurement indicator for the BFE, please add either ft. or '. C2a, d, f, g need to be to the tenth not the hundredth. C2b, c, e, h cannot be left blank; they need to have N/A if there is no measurement. Pages 2-8 of the elevation certificate need to be turned in, not just 2 and 3. | |||
| BLD | COMPLETE | 02/14/2024 | 02/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/06/2024 | 02/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Truss packet needs to have shop drawing approval stamp from engineer of record | |||
| MECH | COMPLETE | 11/30/2023 | 11/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/29/2023 | 11/29/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| PLFM | COMPLETE | 11/27/2023 | 11/28/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, at Foundation A9 c-e need to be 0 not N/A. B9 needs to be 8.0 not just 8. In Section D, if there are no attachments please do not check the box for attachments. | |||
| MECH | HOLD | 11/27/2023 | 11/28/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire heatload | |||
| SW1 | COMPLETE | 11/27/2023 | 11/28/2023 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/16/2023 | 11/27/2023 |
| Note: Held By: SINA VEDADI MOGHADAM - - SVEDADIMOGHADAM@PALMCOASTGOV.COM 2- The current version does not separate current from proposed elevations. Please revise proposed elevations and existing elevations according to sheet 1. 3- Please include elevations for all adjacent properties at a minimum of 20 feet intervals, with an offset of 10 feet. Some points appear to be at a 20 foot offset outside the property lines. 4- As per the following guidelines, please provide Sod elevations adjacent to the structure": 4” below the FFE for block and 6” for wood frame structure | |||
| PLFM | HOLD | 11/16/2023 | 11/17/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A8 a-f need to be N/A per new FEMA instructions. A9b needs to be No not N/A, f needs to be N/A if A9d or A9e are 0 per new FEMA instructions. B1a please capitalize Coast. B9 please add a measurement mark after the BFE to show that it is in feet. C2b, c, h cannot be left blank it needs to say N/A if there are no elevations. C2 a, d, e, f, and g need to be the tenth not the hundredth. C2 g needs to be in feet not meters. There are no proposed elevations for the garage on the Site Plan to verify the elevation on the Elevation Certificate, please add. Section D, the seal is not visible please shade it so that it is visible. Pages 2-8 of the elevation certificate need to be submitted. | |||
| BADMIN | INFORMATION | 11/16/2023 | 11/16/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM uploaded info must include ALL hold information - missing gas, mechanical, etc | |||
| GAS | COMPLETE | 11/16/2023 | 11/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/16/2023 | 11/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide entire Energy calc and heatload with duct layout. Heatload conflicts and shows wrong btu data on block 1. Missing pages of heatload 2. Energy calcs need to be signed by the builder | |||
| SW1 | HOLD | 11/12/2023 | 11/13/2023 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM PLease refer to stormwater checklist for proposed elv's and requirements | |||
| ZON | COMPLETE | 11/12/2023 | 11/13/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 11/12/2023 | 11/16/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Comment not addressed: According to the Site Plan submitted on 11/10/23, the structure will fall inside the SFHA. Elevation certificates are required at Construction Drawings, Foundation, and Final. | |||
| BLD | COMPLETE | 10/27/2023 | 10/30/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/27/2023 | 10/30/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/27/2023 | 10/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/27/2023 | 10/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | HOLD | 10/27/2023 | 10/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide material type for each gas line | |||
| LOCATE | COMPLETE | 10/27/2023 | 11/02/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/27/2023 | 10/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition 2. Design location on Heatload needs to be St. Augustine 3. Chosen equipment for Block 1on heatload exceeds the maximum of 1.15 times the load calculated.per R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition | |||
| SW1 | HOLD | 10/27/2023 | 11/08/2023 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM See the uploaded Stormwater checklist in the attachments for correction. Make corrections on all unchecked items. | |||
| ZON | HOLD | 10/27/2023 | 10/27/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood map number incorrect on site plan/survey Please provide walkaway width and material on site plan/survey Please provide the driveway material and width of site plan | |||
| BADMIN | COMPLETE | 10/27/2023 | 10/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 10/27/2023 | 10/27/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 10/25/23, the structure will fall inside the SFHA. Elevation certificates are required at Construction, Foundation, and Final. FEMA FIRM information is incorrect on Site Plan and Survey, please correct. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 12/04/2023 |
| WATER-METER | ¤419.86 | 12/04/2023 |
| ADJUSTMENT 50% | (¤1,254.03) | 12/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/04/2023 |
| INSPECTION - RESIDENTIAL | ¤1,930.50 | 12/04/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤547.56 | 12/04/2023 |
| CONNECTION FEES | ¤25.00 | 12/04/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 12/04/2023 |
| IMPACT FEE FIRE | ¤428.09 | 12/04/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/04/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/04/2023 |
| IMPACT FEE PARKS | ¤1,800.99 | 12/04/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/04/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 12/04/2023 |
| SURCHARGE FS 533.721 | ¤12.54 | 12/04/2023 |
| SURCHARGE - FS 468.631 | ¤18.81 | 12/04/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/04/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/04/2023 |
| SW ENG PRE APRON | ¤30.00 | 12/04/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/04/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/04/2023 |
| SEWER INSPECTION | ¤25.00 | 12/04/2023 |
| SITE PLAN 30 | ¤30.00 | 12/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,178.71 |