I want to search for...

Permit #2023101296

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7057-00590-0170
Total Square Footage: 1287 sqft
Block: 00590
Subdivision: -
Job Phone: (386)931-5912
Location Address: 421 UNDERWOOD TR
Type: DR - DRIVEWAY
Issue Date: 11/02/2023
NOC: RECORDED
Applicant name: BILL SNYDER
Owner: HARER ROBERT C JR & UN HUI HARER H&W

Address

421 UNDERWOOD TR

PALM COAST, FL 32164

Lot: 0170
Contracted Stated Job Value: ¤15,430.00
Job Description: Extend concrete driveway.
Type: CN

Contractor

3B'S CUSTOM CONCRETE INC.
Status Location Address Phone Fax
CANCEL

PO BOX 2420

FLAGLER BEACH, FL 32136

(386)439-6034 (386)439-2750

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 01/17/2024 APPROVED - AS NOTED FSLADISH
Note: 1/17/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR . HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/3/24 MET WITH CONTRACTOR AND GABE AND HELPED GET POUR UP TO CITY STANDARDS. IT IS READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS OK .002 HUNDRETHS BACKPITCH. WILL ALLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. New inspection due to canceled inspection 1/2/2024 - PREVIOUS INSPECTION NOTES 1/2/24 ENTIRE LEFT SIDE FORM BOARD NEEDS TO COME UP AND MAINTAIN POSITIVE FLOW FROM REAR TO ROAD. RIGHT SIDE FORM AT ROW CULVERT PIPE IS PITCHED BACKWARDS NEEDS TO HAVE POSITIVE FLOW TO ROAD. CULVERT PIPE IS OUT OF TOLEREANCE AND PITCHED UP HILL. NEED TO KEEP PIPE WITHIN .10 OF SWALE PLAN DIAGRAM WITH POSITIVE FLOW. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11/8/2023 - PREVIOUS INSPECTION NOTES 11/08/23 YOU CAN NOT HAVE A NEGATIVE PITCH. THE DRAINAGE MUST FLOW FORWARD TOWARD THE ROAD NOT FROM THE ROAD BACK INTO THE DRIVEWAY. IT MUST HAVE A POSITIVE FORWARD SLOPE. SEE PHOTO FOR REFERENCE. PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR PREPOUR INSPECTION.
ROW - FINAL INSPECTION 01/17/2024 APPROVED - AS NOTED FSLADISH
Note: 1/17/24 SOD LAID. NO TRASH OR DEBRIS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/3/24 MET WITH CONTRACTOR AND GABE AND HELPED GET POUR UP TO CITY STANDARDS. IT IS READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS OK .002 HUNDRETHS BACKPITCH. WILL ALLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. New inspection due to canceled inspection 1/2/2024 - PREVIOUS INSPECTION NOTES 1/2/24 ENTIRE LEFT SIDE FORM BOARD NEEDS TO COME UP AND MAINTAIN POSITIVE FLOW FROM REAR TO ROAD. RIGHT SIDE FORM AT ROW CULVERT PIPE IS PITCHED BACKWARDS NEEDS TO HAVE POSITIVE FLOW TO ROAD. CULVERT PIPE IS OUT OF TOLEREANCE AND PITCHED UP HILL. NEED TO KEEP PIPE WITHIN .10 OF SWALE PLAN DIAGRAM WITH POSITIVE FLOW. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11/8/2023 - PREVIOUS INSPECTION NOTES 11/08/23 YOU CAN NOT HAVE A NEGATIVE PITCH. THE DRAINAGE MUST FLOW FORWARD TOWARD THE ROAD NOT FROM THE ROAD BACK INTO THE DRIVEWAY. IT MUST HAVE A POSITIVE FORWARD SLOPE. SEE PHOTO FOR REFERENCE. PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR PREPOUR INSPECTION.
U -UTILITY RESIDENTIAL FINAL 01/17/2024 FINAL APPROVED JHARDING
ROW- PRE-APRON (PRE-POUR) 01/03/2024 CANCELLED BY APPLICANT WEB
Note: 1/2/2024 - PREVIOUS INSPECTION NOTES 1/2/24 ENTIRE LEFT SIDE FORM BOARD NEEDS TO COME UP AND MAINTAIN POSITIVE FLOW FROM REAR TO ROAD. RIGHT SIDE FORM AT ROW CULVERT PIPE IS PITCHED BACKWARDS NEEDS TO HAVE POSITIVE FLOW TO ROAD. CULVERT PIPE IS OUT OF TOLEREANCE AND PITCHED UP HILL. NEED TO KEEP PIPE WITHIN .10 OF SWALE PLAN DIAGRAM WITH POSITIVE FLOW. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11/8/2023 - PREVIOUS INSPECTION NOTES 11/08/23 YOU CAN NOT HAVE A NEGATIVE PITCH. THE DRAINAGE MUST FLOW FORWARD TOWARD THE ROAD NOT FROM THE ROAD BACK INTO THE DRIVEWAY. IT MUST HAVE A POSITIVE FORWARD SLOPE. SEE PHOTO FOR REFERENCE. PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR PREPOUR INSPECTION.
ROW- PRE-APRON (PRE-POUR) 01/03/2024 APPROVED - AS NOTED FSLADISH
Note: 1/3/24 MET WITH CONTRACTOR AND GABE AND HELPED GET POUR UP TO CITY STANDARDS. IT IS READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS OK .002 HUNDRETHS BACKPITCH. WILL ALLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. New inspection due to canceled inspection 1/2/2024 - PREVIOUS INSPECTION NOTES 1/2/24 ENTIRE LEFT SIDE FORM BOARD NEEDS TO COME UP AND MAINTAIN POSITIVE FLOW FROM REAR TO ROAD. RIGHT SIDE FORM AT ROW CULVERT PIPE IS PITCHED BACKWARDS NEEDS TO HAVE POSITIVE FLOW TO ROAD. CULVERT PIPE IS OUT OF TOLEREANCE AND PITCHED UP HILL. NEED TO KEEP PIPE WITHIN .10 OF SWALE PLAN DIAGRAM WITH POSITIVE FLOW. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11/8/2023 - PREVIOUS INSPECTION NOTES 11/08/23 YOU CAN NOT HAVE A NEGATIVE PITCH. THE DRAINAGE MUST FLOW FORWARD TOWARD THE ROAD NOT FROM THE ROAD BACK INTO THE DRIVEWAY. IT MUST HAVE A POSITIVE FORWARD SLOPE. SEE PHOTO FOR REFERENCE. PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR PREPOUR INSPECTION.
ROW- PRE-APRON (PRE-POUR) 01/02/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 1/2/24 ENTIRE LEFT SIDE FORM BOARD NEEDS TO COME UP AND MAINTAIN POSITIVE FLOW FROM REAR TO ROAD. RIGHT SIDE FORM AT ROW CULVERT PIPE IS PITCHED BACKWARDS NEEDS TO HAVE POSITIVE FLOW TO ROAD. CULVERT PIPE IS OUT OF TOLEREANCE AND PITCHED UP HILL. NEED TO KEEP PIPE WITHIN .10 OF SWALE PLAN DIAGRAM WITH POSITIVE FLOW. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place 11/8/2023 - PREVIOUS INSPECTION NOTES 11/08/23 YOU CAN NOT HAVE A NEGATIVE PITCH. THE DRAINAGE MUST FLOW FORWARD TOWARD THE ROAD NOT FROM THE ROAD BACK INTO THE DRIVEWAY. IT MUST HAVE A POSITIVE FORWARD SLOPE. SEE PHOTO FOR REFERENCE. PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR PREPOUR INSPECTION.
ROW- PRE-APRON (PRE-POUR) 11/08/2023 Disapproved - NO FEE FSLADISH
Note: 11/08/23 YOU CAN NOT HAVE A NEGATIVE PITCH. THE DRAINAGE MUST FLOW FORWARD TOWARD THE ROAD NOT FROM THE ROAD BACK INTO THE DRIVEWAY. IT MUST HAVE A POSITIVE FORWARD SLOPE. MAKE SURE YOU MAINTAIN THE REQUIRED 5" OF CONCRETE OVER CULVERT PIPE REQUIREMENT. SEE PHOTO FOR REFERENCE. PIPE ELEVATION WAS GOOD AT THE TIME OF THIS INSPECTION. I WILL NOT FEE YOU TODAY. PLEASE MAKE CORRECTION BEFORE RESUBMITTING FOR PREPOUR INSPECTION.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/21/2023 11/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 11/21/2023 11/29/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 11/21/2023 11/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM No new zoning review required....additional concrete in ROW area only.
ENGIN1 COMPLETE 10/27/2023 11/02/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 10/27/2023 11/01/2023
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 10/27/2023 10/30/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 01/17/2024
SW ENG RES REVIEW 200 ¤200.00 11/02/2023
SITE PLAN 15 ¤15.00 11/02/2023
ADJUSTMENT 50% (¤15.00) 11/02/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/02/2023
SW ENG INSPECTION 40 ¤40.00 11/02/2023
SW ENG PRE APRON ¤30.00 11/02/2023
Fees Total Due: ¤0.00 Total Paid: ¤330.00