Permit #2023110038
Permit Details
Status: FINAL
| Parcel Id: 05-11-31-5918-00000-0270 |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: 386-237-1955 |
| Location Address: 115 LONGVIEW WAY N |
| Type: BH - BOATHOUSE |
| Issue Date: 02/23/2024 |
| NOC: RECORDED |
| Applicant name: STACY ALYN BENNETT |
| Owner: DENSMORE DANIEL P & KRISTAN C DENSMORE H&W |
|
Address UNIT 1834 PALM COAST, FL 32137 |
|
Address 35 RIVERVIEW BND S PALM COAST, FL 32137 |
| Lot: 0270 |
| Contracted Stated Job Value: ¤54,622.10 |
| Job Description: Build a boathouse with lift |
| Type: CN |
Contractor
COASTAL MARINE CONSTRUCTION
| Status | Location Address | State License Number | Phone |
| ACTIVE |
871 STATE HWY 100 WEST BUNNELL , FL 32110 |
SCC131152025 (Exp: 08/31/2026) | 386-237-0774 |
Sub Contractors
COBEY SCOTT WETHERBY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
POST OFFICE BOX 2521 BUNNELL, FL 32110 |
EC0002486 (Exp: 08/31/2026) | (386) 437-5834 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL - BUILDING MISC | 09/04/2024 | FINAL APPROVED | BTAYLOR |
| Note: 8/23/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/23/2024 1:12:51 PM *** Please submit a revision to the permit or a new permit will be needed for the Electrical work installed for the lift (Manufactuerer paperwork, design, and diagram of electrical work performed) before a final can be approved. 8/22/2024 - PREVIOUS INSPECTION NOTES 8-22-24 1. No plans on site. | |||
| FINAL - BUILDING MISC | 08/23/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/23/2024 1:12:51 PM *** Please submit a revision to the permit or a new permit will be needed for the Electrical work installed for the lift (Manufactuerer paperwork, design, and diagram of electrical work performed) before a final can be approved. 8/22/2024 - PREVIOUS INSPECTION NOTES 8-22-24 1. No plans on site. | |||
| FINAL - BUILDING MISC | 08/22/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-22-24 1. No plans on site. | |||
| FIRE FINAL | 08/22/2024 | APPROVED | RMARTIN |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 08/26/2024 | 08/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/09/2024 | 01/09/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/09/2024 | 01/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 01/09/2024 | 01/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 01/04/2024 | 01/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/04/2024 | 01/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/04/2024 | 01/04/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Your slip size and total length of actual dock/slip itself (separate from the walkway) is still not matching that of the approved master plans. Please revise to match and correct the site plan as well. | |||
| FI1 | HOLD | 11/02/2023 | 11/02/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show what type of fire extinguisher is being installed and location on the dock. | |||
| PLENV | COMPLETE | 11/02/2023 | 11/06/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM The listed species survey provided by a QEP with the city meets criteria of 10.04.01 of the LDC showing there are no listed species in danger or at risk from this development. | |||
| BLD | COMPLETE | 11/01/2023 | 11/02/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/01/2023 | 11/02/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM There are still differences in the size of the slip that aren’t consistent with the master plan. The slip with dock should be 36’ - not 26’. Please note that the Typical dock plan means that you need to build the dock according to the specifications in the Master Plan because according to the Master Plan " With the exception of the docks, the common area associated with each lot is under the control of the Homeowners Association" therefore the HOA cannot change the approved of the boat dock/slips. They were approved in the Master Plan. A roof is permissible for each single boat slip and/or the adjoining platform. The boat dock roof shall be composed of fern green tile as approved for all single family residences in the Village at Palm Coast Phase I. The construction shall be a hip roof in style and height of the roof shall not be greater than 13 feet above the floor decking of the primary structure. Roof specifications shall be consistent with exhibits provided in the February 21, 2012 application materials. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 09/03/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/23/2024 |
| INSPECTION - RESIDENTIAL | ¤151.25 | 02/23/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 02/23/2024 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/23/2024 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/23/2024 |
| SITE PLAN 30 | ¤30.00 | 02/23/2024 |
| ADJUSTMENT 50% | (¤123.13) | 02/23/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤197.12 |